Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Sponsors are satisfied with final design.
Prototype is nearly done, currently making minor changes to final dimensions.
Accomplishments from Previous Week
We have a final deign that the sponsors like.
Tested forces required to deflect Gooseneck tubing at different lengths along the tubing.
Tested different gauged wires, and learned that we must use the wires that come with the cameras.
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Present final design to sponsors (3/10/14) (Team)
Finish Fabrication. (Paul)
Finish deliverable documentation. (Kent, John)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
2/28/14
Sponsors like the design and use of the gooseneck tubing.
Sponsors do not mind using the stock wires on the headset.
The ends of the gooseneck should be covered so they do not scratch the user's face.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
When the gooseneck, which is wound like a spring, is pressed into a hole that is too small, the gooseneck starts to unravel and makes the end bigger. This make it hard to fit into the hole to mount the gooseneck. We are using a type of putty to fill the whole, and to help the gooseneck from rotating.
Extra gooseneck tubing, rubber bands, and velcro straps had been ordered; however, they have not arrived yet.
Resources or Information Required but not Available
When last parts are coming in (Gooseneck, rubber bands, and Velcro straps).
Schedule
Present the final design to Sponsors. (3/10/14)
Have final deliverables (assembled prototype, user manual, parts list) ready by the end of week 10.
Have any modification done by the end of week 9.
Budget (list amount spent and amount remaining)
spent : $937.76 balance: $4562.24
Progress on Report and Webpage
We have yet to receive the graded copy of the second draft of the report; nevertheless, we are making revisions as the project progresses.
Testing has finished, thus test results can be added to the report
Design has been finalized, the report reflects the current design
Currently drafting the poster.
Making adjustments to webpage based on comments from peer review.