Proj. Manag.
Project Management
Failure Mode Effect and Analysis
Project Objectives
High Priority Objectives
Device must inject
Accommodate syringes 5mL-20mL
Pedal Operated
Must be able to go both forward and backwards
Second Priority Objectives
Measure and output pressure data
Let operator know how much is left in the needle
Syringe mechanism must be constrained to the size of the labtop
Make device manufacturable
Other Constraints and Issues
Make it manufacturable
Ease of operation
WOW Design Solution
Pedal/Human Interface
Risk Reduction Strategy
Intermediate Milestones
Identifying meaningful intermediate milestones is a critical for effective project management. Together with your sponsor identify such milestones, and specify specific performance requirements you aim to meet at each milestone.