2013 Refurbishment:
As engineered by Genivar from Markham, Ontario, the refurbishment includes:
rock embankment to increase the mass of the dam and reduce ice forces
concrete repairs to deteriorating surfaces in the control section
reinforced concrete topping in the sluice
new railings for operator safety
Â
Â
Â
Â
Â
Â
Galcon Marine
This is the contractor. Contact form:http://galconmarine.com/contact.php
Â
Â
Design/build any marine projects
Marine pipe installation
Dam building and rehabilitation
Pile Driving
Shore line construction
Dredging
Barge rental
Boat Launches & Docks
Â
Â
Â
Update 1The trucks roll in on June 7,2013
Â
Â
Â
Â
Â
Â
Â
Â