Mun, J., Lee, J., Baek, S., Lee, K., Yun, S. (2025) Standardization of factors associated with cost and schedule variations in road construction projects. Under preparation targeted to KSCE Journal of Civil and Environmental Engineering Research.
Mun, J., Lee, K., Yun, S. (2025) Analysis on performance assessment framework of construction phase for road construction projects. Under preparation targeted to KSCE Journal of Civil and Environmental Engineering Research.
Choi, J., Yin, Z., Chae, M., Yun, S. (2023). Benchmarking the material use efficiency of building projects. Journal of Management in Engineering, 39(6), 05023007.
Mun, J., Yun, S. (2023) Analyzing planning performance of road construction projects using preliminary feasibility analysis data. Korean Journal of Construction and Engineering Management. Vol. 24, No. 1. Pp. 3-11
Choi, J., Yun, S., Leite, F., Mulva, S. P. (2019). Team integration and owner satisfaction: Comparing integrated project delivery with construction management at risk in health care projects. Journal of Management in Engineering, 35(1), 05018014.
Yun, S., Jung, W. (2017). Benchmarking sustainability practices use throughout industrial construction project delivery. Sustainability, 9(6), 1007.
Choi, J., Yun, S., de Oliveira, D. P. (2016). Developing a cost normalization framework for phase-based performance assessment of construction projects. Canadian Journal of Civil Engineering, 43(12), 1075-1086.
Yun, S., Choi, J., Kang, Y., de Oliveira, D. P., Mulva, S. P. (2016) Measuring project management inputs throughout capital project delivery. International Journal of Project Management. Vol. 34, No. 7, Pages 1167-1182.
Yun, S., Choi, J., de Oliveira, D. P., Mulva, S. P. (2016) Development of performance metrics for phase-based project benchmarking. International Journal of Project Management. Vol 34. Issue 3 Pages 389~-402.
Lee, C., Lee J., Yun, S., Han, S. H. (2023). Measurement of conflict level based on stakeholders’ perception gap in construction projects using Fuzzy-AHP. Targeted to Journal of Management in Engineering.
Lee, J-H., Lee, C., Yun, S. (2023) Analyzing characteristics of construction complaints with construction project type. Korean Journal of Construction and Engineering Management. Vol. 24, No. 3. Pp. 52-61.
Park, S. J., Lee, C., Han, S. H. Yun, S. (2020) Analyzing Relationships Between Project Characteristic and Public Conflict Characteristic in Public Construction Using Fuzzy Analytical Hierarchy Process (FAHP). Korean Journal of Construction and Engineering Management. Vol. 21, No. 1. Pp. 70-77.
Won, J. W., Jung, W., Han, S. H., Yun, S., Koo, B. (2019). What enables a high-risk project to yield high return from a construction contractor’s perspective? Sustainability, 11(21), 5971.
Yun, S., Jung, W., Han, S. H., Park, H. (2015), “Organizational critical success factors in public-private partnership projects: A comparison of solicited and unsolicited Proposals”, Journal of Civil Engineering and Management. Vol. 21 No. 1, 131-143.
Yun, S., Han, S. H., Kim, H., Ock, J. H. (2009), “Capital structure optimization for BOT projects using a stochastic and multi-objective approach”, Canadian Journal of Civil Engineering. Vol. 36 No. 5. pp. 777-790.
Kim, B., Yun, S., Han, S. H., Kim, H. (2008), “Appropriate roles of project participants for public private partnership projects through the organizational behavior theory.” KSCE Journal of Civil and Environmental Engineering Research. Vol. 28 No. 6-D pp. 839-847.
Yun, S. Han, S. H., Kim, D. Y. (2008), “Multi-objective genetic algorithm model for determining an optimal capital structure of privately-financed infrastructure projects.” KSCE Journal of Civil and Environmental Engineering Research, Vol. 28 No. 1-D, pp. 107-117.
Park, C. Y. and Yun, S. (2025) Addressing inattentional blindness: How internal personality and external environment shape safety risk perception in Construction Sites. Under preparation targeted to Journal of Management in Engineering
Nam, J. Baek, S. Yun, S. (2025) Determination of optimal area of interests (AOI) for identifying safety risk factors in construction sites using eye-tracker. Automation in Construction. Under Review
Lim, J., Cho, S., Yun, S. (2023). Correlation analysis between accident type and age of construction workers. KSCE Journal of Civil and Environmental Engineering Research, Vol. 43, No. 3, pp. 371-380.
Park, S., Park, C. Y., Lee, C., Han, S. H., Yun, S., Lee, D. E. (2022). Exploring inattentional blindness in failure of safety risk perception: Focusing on safety knowledge in construction industry. Safety Science, 145.
Lim, J., Park, C. Y., Yun, S. (2021) A study on safety management in small-medium construction sites : Focusing on the reinforced concrete works. Journal of the Regional Association of Architectural Institute of Korea. Vol. 23, No. 6. Pp.197-201
Kang, S., Cho, S., Yun, S., Kim, S. (2021). Semantic network analysis using construction accident cases to understand workers’ unsafe acts. International Journal of Environmental Research and Public Health, 18(23).
Kim, D. Y., Yun, S. Kim, J-M, Lee, S., Son, K. (2020) Improvement of fall prevention method in construction site through comparison with advanced countries’ cases. Journal of the Korea Institute of Building Construction. Vol. 20, No. 5. pp. 471-480.
Choe, S., Yun, S., Leite, F. (2016) Analysis of the effectiveness of the OSHA steel erection standard in the construction industry. Safety Science. Vol. 89.
Lee, J. and Yun, S. (2025) Analysis of effectiveness of a sewage rehabilitation project using Build-Transfer-Lease scheme. Under preparation targeted to Journal of Management in Engineering.
Park, C. Y., Yun, S. (2024) What determines infrastructure investments: critical factors from preliminary feasibility studies for capital projects in Korea. Journal of Management in Engineering. 40(4).
Choi, Y., Park, C. Y., Lee, C., Yun, S., Han, S. H. (2022). Conceptual cost estimation framework for modular projects: a case study on petrochemical plant construction. Journal of Civil Engineering and Management, 28(2), 150-165.
Park, C. Y., Yun, S., Lee, D-E. (2021) Establishing the strategy of effective construction VE for construction firms. Korean Journal of Construction and Engineering Management. Vol. 22, No 2. pp. 80-87.
Baek, S., Yoo, M., Yun, S. (2021) A benchmarking study for deriving data-driven asset management strategy: U.S. Federal Transit Administration (FTA) Case. KSCE Journal of Civil and Environmental Engineering Research. Vol. 41 No. 5. pp. 591-599.
Lee, J., Park, C. Y., Baek, S., Han, S. H., Yun, S. (2021). Risk-based prioritization of sewer pipe inspection from infrastructure asset management perspective. Sustainability, 13(13), 7213.
Moon, S-H, Yun, S. Park, C. Y., Cho, T. S., Han, S. H. (2020) Identifying the organizational competency factor for implementing AWP (Advanced Work Packaging) in perspective of Korean EPC contractor. Korean Journal of Construction and Engineering Management. Vol. 21, No 3. pp. 20-27.
Yun, S., Caldas, C. H. (2009), “Analyzing decision variables that influence preliminary feasibility studies using data mining techniques”, Construction Management and Economics. Vol. 27. No. 1 pp. 73-87.
Han, S. H., Yun, S., Kim, H., Kwak, Y. H., Park, H. G., Lee, S. H. (2009). “Analyzing schedule delay of mega-projects: Lessons learned from Korea Train eXpress (KTX)”, IEEE Transaction on Engineering Management. Vol. 56. No. 2. pp. 243-256.
Han, S. H., Yun, S., Lee, S. H. (2006). “Exploring delays of the mega construction project: the case of Korea high speed railway project.” KSCE Journal of Civil and Environmental Engineering Research. Vol. 26 No. 5-D pp. 839-84
Copyright © Construction Manangement Innovation Lab. @ Yeungnam University 2016