DUE: 3 questions for Jill
Ayumi Horie Article response
Watch+ Respond to a classmates video.
Check in / sign in to attendance (3 min)
Jill Pelto Visiting Artist presentation.( 30mins)
Q & A with Jill (10-15 mins)
HW: Go over homework for Mon, 3/30
Show + Tell Ceramics Piece
Make a list of 5 things you may want to use to answer the question: What story do you want to tell with your art?
WATCH the following videos and record in your (Video response journal (the new updated version on google classroom).
Grace Lee - personal connection to forms
Victoria Ellis - 2D skill to the 3D realm- relief carving.
Answer claimed Wood Firing Question here: wood firing q&a Be ready to talk about your woodfiring research- Put your name on both your question (which you asked) and the answer (which you answered).
DUE:
Draw out your wood forms in your sketchbooks with multiple ideas for surface work
Watch: Artists Video of the Day!
Add to: Collaborative Playlist!
Gather ceramic piece for Show & Tell
IN CLASS:
Word Salad
Show and Tell Ceramic Piece
Share our surfaces
Assign Questions
Create work for Wood Firing day 3/5
DUE: 5 Pinch Pots, 5 People Assessment and portfolio update
Create work for Wood Firing day 2/5
DUE: MET Search
5 Pinch Pots, 5 People Assessment Due Fri. 13th
Continue to plan for Wood Firing.
Share sketch book planning
Create! Day 1/5
HW: MET Search, DUE Wed, 3/11
NYC check in!
5 Pinch Pots should be in kiln room by Tues. pm.
All mugs should be in drying stage NOW
INTRO: New!!
Go over: Ceramics Research Project #1
Check in on Mugs (should be DONE (handles ON) and ready to head to kiln room by end of the day Friday)
5 Pinch Pots, 5 People Assignment and GLAZE!!!
DUE: Ceramics Research Project #1
3 Thrown Mugs pull and place handles, throw mugs
Review 5 Pinch Pots, 5 People Assignment and GLAZE!!!
3 Thrown Mugs day 3/3, pull and place handles, throw mugs
Assign Ceramics Research Project #1, DUE Tues, 3/3
DUE: Firing Methods Homework
3 Thrown Mugs day 2/3
Thurs, 2/13 Snow Day!!!!
DUE:
pinterest board of 20 mugs
10 sketches in sketchbook of diff. shaped mugs with handles
Check in on thrown pieces
Make and attach handles.
3 Thrown Mugs day 1.5/3
Assign: Firing Methods Homework DUE: Wed, 2/26
Upcoming: Glaze 5/6 tiles... (while mugs are drying)
Check pinch pots
Glaze cone 5/6 tiles
Intro: 3 Thrown Cups;
Homework, due Thurs, 2/13:
pinterest board of 20 mugs
10 sketches in sketchbook of diff. shaped mugs with handles
DUE: interview questions, pinterest board, planning
Quincy, Anna--share portfolios with me
2/14 in-school field trip
Self-Assessment on 5 for 5, current status.
5 Pinch Pots, 5 People Assignment day 3/3
DUE: interview questions, pinterest board, planning
Share Google Sites with me!
5 Pinch Pots, 5 People Assignment day 2/3
DUE: CIII/IV Semester Goals Sheet
Check Tiles...
Homework passes!
INTRO: 5 Pinch Pots, 5 People Assignment
Assign: Interviews, plans, pinterest board
Postcard Opener
Ceramics III Overview: Form, Function, Finesse, (f)Meaning
Bookmark site
Sign into Google Classroom
CIII/IV Semester Goals Sheet DUE Thurs, 1/30
NYC trip updates...
C5/6 Test Tiles
Upcoming: 5 Pinch Pots, 5 People Assignment
CIII/IV Semester Goals Sheet Due TODAY
Assign: Ceramics Monthly Project #1 Due Thurs, 1/31
Set up Google Sites (10 min)
Everything on this should relate to ceramics, including banner images
All past online portfolios should be listed at bottom of home page or as links from top banner
Links at top (with drop-down menus) might be: My Art Portfolios, Class Projects, Resources
(Look at pinterest boards)
Start forming 5 Pinch Pots, 5 People Assignment, Day 2 of 3
CIII/IV Semester Goals Sheet Due Mon, 1/28
Start forming 5 Pinch Pots, 5 People Assignment, Day 1 of 3
Pinterest board with 20 pinch pot pins Due TODAY
NYC thoughts? NYC Doc
CIII/IV Semester Goals Sheet Due Mon, 1/28
Fill out Response Worksheet
Start 5 Pinch Pots, 5 People Assignment
Pinterest board with 20 pinch pot pins Due Fri, 1/25
Roll the Dice Opener
Ceramics III Overview: Form, Function, Finesse, fMeaning
NYC trip updates... do a little looking for Thursday
Meditative Pinch Pot
Make: a closed form pinch pot (or the most unusual pinch pot you can think of)
Intro: 5 Pinch Pots, 5 People Assignment
Upcoming:
Set up online Portfolios
Fri, 6/5
4Day Final Project (Day 3/4): glaze bowls
Tues, 6/4
4Day Final Project (Day 2/4): Throw/trim, trim/glaze, glaze
Mon, 6/3
4Day Final Project (Day 1/4): Throw, throw/trim, trim/glaze, glaze
Fri, 5/31
RAMEN CELEBRATION!!!
Look at bowls, discuss techniques, class, etc.
Final Assessment in portfolio: Of which in-class project are you most proud and why? From which project did you learn the most and why?
Pack up shelves, clean shelves.
Thurs, 5/30
Firing Bowls!
Present travel mugs and artist presentations
Final glazing
Indy Exploration Ramen Bowl Assessment Due Fri
Transporting Meaning Travel Mug Assessment Due Fri
Assign: final Portfolios with Insta-Inspired & Travel Mugs
Upcoming:
Friday: Ramen! Present bowls and inspiration, portfolio work, cleaning, packing, grouting
Tues, 5/28
Tuesday: Raku Personal Artifacts Assessment due,
Glaze ramen bowls;
Assign: final Portfolios with Insta-Inspired & Travel Mugs
Indy Exploration Ramen Bowl Assessment
Transporting Meaning Travel Mug Assessment
Upcoming:
Thursday: Final glazing, present travel mugs and artists,
Friday: Ramen! Present bowls and inspiration, portfolio work, cleaning, packing, grouting
Fri, 5/24
Look at raku work
Raku Personal Artifacts Assessment Due Tues, 5/28
Check in on Insta-Inspired on a Ramen Bowl!: all bowls should be IN KILN or already fired by TODAY
Bowls need to be GLAZED by next Wednesday at very latest
Throw
Upcoming:
Tuesday: Raku assessment due, glaze ramen bowls; Assign: final Portfolios with Insta-Inspired & Travel Mugs
Thursday: Final glazing, present travel mugs and artists,
Friday: Ramen! Present bowls and inspiration, portfolio work, cleaning, packing, grouting
Thurs, 5/23
Talk about Raku firing! Look at work
Check in on Insta-Inspired on a Ramen Bowl!: all bowls should be thrown by end of Tues. Open Studio
Bowls need to be GLAZED by next Wednesday at very latest
Plan Ramen Day (NEXT Friday)
RAKU Personal Artifacts Assessment Due Tues, 5/28
Glaze Transporting Meaning: Travel Mugs
Tues, 5/21
RAKU Firing at Portland Pottery!!!
Mon, 5/20
RAKU FIELD TRIP TOMORROW!!!!!!
Check in on Insta-Inspired on a Ramen Bowl!: all bowls should be thrown by end of Tues. Open Studio
Wax raku
Raku Permission Form (Trip is Tuesday, 5/21)
RAKU Personal Artifacts Assessment
Glaze Transporting Meaning: Travel Mugs
Thurs: Talk about raku, Trim, Glaze
Fri: Glaze, trim bowls
Fri, 5/17
Check in on Insta-Inspired on a Ramen Bowl!
Wax raku
Raku Permission Form (Trip is Tuesday, 5/21)
Glaze Transporting Meaning: Travel Mugs
Thurs, 5/16
Tim Christensen visits to throw with students
Tues, 5/14
Check in on Insta-Inspired on a Ramen Bowl!
Glaze Transporting Meaning: Travel Mugs
Wax raku
Raku Permission Form (Trip is Tuesday, 5/21)
Mon, 5/13
Check in on/Work on Insta-Inspired on a Ramen Bowl!
Glaze Transporting Meaning: Travel Mugs
Wax raku
Raku Permission Form (Trip is Tuesday, 5/21)
Fri, 5/10
Check in on/Work on Insta-Inspired on a Ramen Bowl! Make 2nd bowl and / or trim, make openings, etc.
Thurs, 5/9
Response to NYC Assessment (Cornerstone: Connecting Work) Due TODAY!
Transporting Meaning: Travel Mugs
Due to kiln room for bisque firing TODAY
Raku work due to kiln room for bisque firing FRIDAY
Insta-Inspired on a Ramen Bowl! Throw, Day 2
Tues, 5/7
Response to NYC Assessment (Cornerstone: Connecting Work) Due Thurs, 5/9
Transporting Meaning: Travel Mugs
Due to kiln room for bisque firing by Thursday, 5/9
Insta-Inspired on a Ramen Bowl!
Mon, 5/6
Response to NYC Assessment (Cornerstone: Connecting Work) Due Thurs, 5/9
Transporting Meaning: Travel Mugs
work on mugs, start second. Last in-class work day is Monday
Research / Presentation Due Mon, 5/6
Presentations Tues, 5/7 (plus in-process Q&A)
Upcoming: Insta-Inspired
Fri, 5/3
Transporting Meaning: Travel Mugs
work on mugs, start second. Last in-class work day is Monday
Research / Presentation Due Mon, 5/6
Thurs, 5/2
Transporting Meaning: Travel Mugs
Research / Presentation Due Mon, 5/6
Tues, 4/30
Transporting Meaning: Travel Mugs
Work on Research piece and planning mug. Make sketches with measurements
to figure out the size. If we have a template to fit, great. If not, you'll need to go into
the template maker to make your own. I can print it in the office.
Response to NYC Project to kiln room by Tuesday afternoon
Mon, 4/29
Transporting Meaning: Travel Mugs
Response to NYC Project to kiln room by Tuesday afternoon
Fri, 4/26
Response to NYC Project (Cornerstone: Connecting Work): glaze work
Ceramics Monthly Project #4 Due TODAY!
Intro: Transporting Meaning: Travel Mugs
Thurs, 4/25
Raku Assignment: Personal Artifacts: should be done forming
Response to NYC Project (Cornerstone: Connecting Work): start glazing work
Ceramics Monthly Project #4 Due Friday!
Upcoming: Meaningful Ceramics
Tues, 4/23
Raku Assignment: Personal Artifacts: last in-class forming
Response to NYC Project (Cornerstone: Connecting Work): start glazing work
Ceramics Monthly Project #4 Due Friday!
Mon, 4/22
Raku Assignment: Personal Artifacts: work on forming
Upcoming: glaze NYC piece
Assign: Ceramics Monthly Project #4 Due Friday!
Thurs, 4/11
Raku Assignment: Personal Artifacts: work on forming
Upcoming: glaze NYC piece
Tues, 4/9
Raku Assignment: Personal Artifacts: idea due, start forming
Upcoming: glaze NYC piece
Mon, 4/8
Response to NYC Project (Cornerstone: Connecting Work): status?
Intro Raku Assignment: Personal Artifacts
Jun Kaneko Video
Fri, 4/5
Work on Response to NYC Project (Cornerstone: Connecting Work): Last in-class day?
Ceramics Monthly Project #3 Due TODAY!
Thurs, 4/4
Work on Response to NYC Project (Cornerstone: Connecting Work): Last in-class day?
Ceramics Monthly Project #3 Due Friday!
Upcoming: Raku Project!
Tues, 4/2
Work on Response to NYC Project (Cornerstone: Connecting Work): How many more forming days?
Ceramics Monthly Project #3 Due Friday!
Upcoming: Raku Project!
Mon, 4/1
Look at Ceramics Monthly Project #2
Assign: Ceramics Monthly Project #3 Due Friday!
Lidded Slab Box / Slab Vase Assessment Due TODAY
Work on Response to NYC Project (Cornerstone: Connecting Work)
Fri, 3/29
5 Thrown Cups & Mugs Assessment (Cornerstone-Producing) Due TODAY
Lidded Slab Box / Slab Vase Assessment Due Mon, 4/1
Work on Response to NYC Project (Cornerstone: Connecting Work)
Thurs, 3/28
Ceramics Monthly Project #2, Due last week--look at
Pinch Pots?
5 Thrown Cups & Mugs Assessment (Cornerstone-Producing) Due Fri, 3/29
Lidded Slab Box / Slab Vase Assessment Due Mon, 4/1
Work on Response to NYC Project (Cornerstone: Connecting Work)
Tues, 3/26
Ceramics Monthly Project #2, Due last week--look at
Pinch Pots?
3 Thrown Cups & Mugs Assessment (Cornerstone-Producing) Due Fri, 3/29
Lidded Slab Box / Slab Vase Assessment Due Mon, 4/1
Start Response to NYC Project (Cornerstone: Connecting Work)
Tues, 3/19
Ceramics Monthly Project #2, Due & Look
Look at pinch pots
Cups/Mugs & Slab Project Due Fri, 3/29
Response to NYC Project (Cornerstone: Connecting Work)
Mon, 3/18
Ceramics Monthly Project #2, Due
Check in on Cups, Vase/Box
GLAZE!!
Response to NYC Project (Cornerstone: Connecting Work)
Thurs, 3/14 & Fri, 3/15
Check in on Cups, Vase/Box
Rachel--throw?!
GLAZE!!
Please be sure to clean up well.
Assign:
Ceramics Monthly Project #2, Due Mon, 3/18
Upcoming: NYC Response Project
Tues, 3/12
NYC Scavenger Hunt DUE!
Debrief NYC
Check in on Cups, Vase/Box
GLAZE!!
Upcoming: NYC Response
Thurs, 3/7 - 10
Tues, 3/5 (Monday was a snow day!)
5 Pinch Pots, 5 People Assessment Due Tues, 3/5
MET Search, Due TODAY
Continue with
3 Thrown Cups--LAST in class DAY TODAY
Fri, 3/1
Pinch Pots, glazed, to kiln room by Friday
5 Pinch Pots, 5 People Assessment Due Tues, 3/5
MET Search, Due Mon, 3/4
Continue with
Thurs, 2/28
Pinch Pots, glazed, to kiln room by Friday
5 Pinch Pots, 5 People Assessment Due Tues, 3/5
MET Search, Due Mon, 3/4
Continue with
Tues, 2/26
Continue with
Research page, pinterest boards, etc. on your next project (cups or vase or box) Due tomorrow!
Assign NYC Prep, due Fri, 3/1
Mon, 2/25
Check in on Pinch Pots: Last day to glaze. Due to kiln room by 3/5
5 Pinch Pots, 5 People Assessment Due Tues, 3/5
Continue with
Research page, pinterest boards, etc. on your next project (cups or vase or box) Due tomorrow!
Fri, 2/15
Most at Portland Stage!
Glaze pinch pots
Thurs, 2/14
Glaze pinch pots!
Research page, pinterest boards, etc. on your next project (cups or vase or box) Due Tues, 2/26
Work on:
Tues, 2/12
Look at 3 Thrown Cups,
Work on: Glazing pinch pots (glazing should be done by Friday, 2/15
Look at: 5 Pinch Pots, 5 People Assessment
Assign: Research page on your next project (cups or vase or box) Due Fri, 2/15
Mon, 2/11
Work on:
3 Thrown Cups CORNERSTONE: Producing
intent on review of centering, pulling, even sides and base, trimming
OR
Intent of reviewing creating with slabs, refining slab construction, pushing beyond the standard 4-wall form, working with strongly considered surfaces
Forming for both should be done by the end of Monday.
Fri, 2/8
Work on:
3 Thrown Cups CORNERSTONE: Producing
intent on review of centering, pulling, even sides and base, trimming
OR
Intent of reviewing creating with slabs, refining slab construction, pushing beyond the standard 4-wall form, working with strongly considered surfaces
Forming for both should be done by the end of Monday.
Tues, 2/5
Check in on Pinch Pots (move to kiln room)
Work on:
3 Thrown Cups CORNERSTONE: Producing
intent on review of centering, pulling, even sides and base, trimming
OR
Intent of reviewing creating with slabs, refining slab construction, pushing beyond the standard 4-wall form, working with strongly considered surfaces
Forming for both should be done by the end of Friday.
Mon, 2/4.......Fri, 2/1 (no class...)
Look at Ceramics Monthly Project #1
Check in on Pinch Pots (move to kiln room)
Work on:
3 Thrown Cups CORNERSTONE: Producing
intent on review of centering, pulling, even sides and base, trimming
OR
Intent of reviewing creating with slabs, refining slab construction, pushing beyond the standard 4-wall form, working with strongly considered surfaces
Thurs, 1/31
Ceramics Monthly Project #1 Due TODAY (1 min. presentation)
Go over 5 Pinch Pots, 5 People Assessment
5 Pinch Pots, 5 People Assignment, Day 4! of 3 (if you use time today you're juggling with the next assignment; all forming should be done by today and the drying process should be started)
Introduce:
5 Thrown Cups CORNERSTONE: Producing
intent on review of centering, pulling, even sides and base, trimming
Introduce:
Intent of reviewing creating with slabs, refining slab construction, pushing beyond the standard 4-wall form, working with strongly considered surfaces
Tues, 1/29
5 Pinch Pots, 5 People Assignment, Day 3 of 3
Mon, 1/28
CIII/IV Semester Goals Sheet Due TODAY
Assign: Ceramics Monthly Project #1 Due Thurs, 1/31
Set up Google Sites (10 min)
Everything on this should relate to ceramics, including banner images
All past online portfolios should be listed at bottom of home page or as links from top banner
Links at top (with drop-down menus) might be: My Art Portfolios, Class Projects, Resources
(Look at pinterest boards)
Start forming 5 Pinch Pots, 5 People Assignment, Day 2 of 3
Fri, 1/25
CIII/IV Semester Goals Sheet Due Mon, 1/28
Start forming 5 Pinch Pots, 5 People Assignment, Day 1 of 3
Pinterest board with 20 pinch pot pins Due TODAY
Thurs, 1/24
NYC thoughts? NYC Doc
CIII/IV Semester Goals Sheet Due Mon, 1/28
Fill out Response Worksheet
Start 5 Pinch Pots, 5 People Assignment
Pinterest board with 20 pinch pot pins Due Fri, 1/25
Tues, 1/22
Roll the Dice Opener
Ceramics III Overview: Form, Function, Finesse, fMeaning
NYC trip updates... do a little looking for Thursday
Meditative Pinch Pot
Make: a closed form pinch pot (or the most unusual pinch pot you can think of)
Intro: 5 Pinch Pots, 5 People Assignment