Ready to go for the day!
Lunch by Dylan!
A little cleanup!
Concrete apron downstream of the ford creating an impassable jump for aquatic organisms
The concrete ford with the temporary bridge above
First closeup look at the area
Upstream of the ford
Checking out the area
Using the lazer level at the ford upstream
Upstream reference reach
Taking basic reference reach measurements
Upper part of the stream that splits into two
Using the lazer level at the ford
Looking at the reference reach
Reference reach material detail
Potential location of an old road
Taking a stroll on the service road
Walking around the forest
More inspecting of the space
Upstream of the ford
Visiting another ford
Visiting a culvert done by Dylan
An inside look
Ford at a lower flow
Post concrete apron at a lower flow
Upstream of the ford
Downstream of the ford
Benchmarks from bridge placement
Measuring the road with total station
Surveying in the water
Robotic total station set up