Management milestones GSI in 1993 – 1998

 

1994                 Approval of the HADES detector project by the GSI directorate

1996/1997        Discussion of the long-range perspectives of GSI:

                         Evaluation of options for an extension of the GSI facility in eight international    

                          working groups covering the topics: 

                          deep-inelastic electron-nucleon and electron-nucleus scattering, 

                          X-ray spectroscopy and radiation physics

                          Nuclear collisions at maximum baryon density,

                          Physics with secondary π, K and antiproton beams,

                          Plasma physics with intense heavy-ion beams,

                          Accelerator studies: electron-nucleon/nucleus collider for high luminosities,

                          Accelerator studies: high intensity option

1997                  start of the cancer therapy project and first patient treatment with carbon beams  

1997-1998        Installation and commissioning of the secondary pion beam

1998                 Installation of PHELIX (Pettawatt High-Energy Laser for heavy-ion experiments)