Management milestones GSI in 1993 – 1998
1994 Approval of the HADES detector project by the GSI directorate
1996/1997 Discussion of the long-range perspectives of GSI:
Evaluation of options for an extension of the GSI facility in eight international
working groups covering the topics:
deep-inelastic electron-nucleon and electron-nucleus scattering,
X-ray spectroscopy and radiation physics,
Nuclear collisions at maximum baryon density,
Physics with secondary π, K and antiproton beams,
Plasma physics with intense heavy-ion beams,
Accelerator studies: electron-nucleon/nucleus collider for high luminosities,
Accelerator studies: high intensity option
1997 start of the cancer therapy project and first patient treatment with carbon beams
1997-1998 Installation and commissioning of the secondary pion beam
1998 Installation of PHELIX (Pettawatt High-Energy Laser for heavy-ion experiments)