Our internal mold-making facility reduces lead times by 30%, giving you a critical speed advantage in the North American and European markets.
Equipped with high-cavity automated tooling to handle orders from 10,000 to 1,000,000+ pieces with consistent precision.
We provide technical data sheets, material certifications, and competitive pricing within 24-48 hours to support your urgent tenders.
Answer: We work with a wide range of high-performance elastomers. For small-volume orders, we maintain a ready-to-use stock of EPDM, NBR, and Silicone with hardness levels ranging from 50 to 80 Shore A. For other specialized materials (such as Peroxide EPDM, Platinum Silicone, HNBR, SBR, Viton/FKM, Neoprene, or Natural Rubber), a Minimum Order Quantity (MOQ) may be required depending on the specification.
Answer: For projects using our in-stock materials (EPDM, NBR, Silicone), you will receive a comprehensive technical review and formal quotation within 24 to 48 hours. For projects requiring specialized compounds or custom material sourcing, the quotation process may take slightly longer as we coordinate with our material scientists to ensure the most competitive and accurate pricing.
Answer: Absolutely. We understand the importance of intellectual property in custom manufacturing. We are happy to sign a professional or customer-provided NDA before reviewing any technical drawings to ensure your designs and proprietary information remain 100% confidential.
Answer: To provide the most competitive and precise quote, please provide the following information:
Technical drawings (2D drawings) with clearly defined tolerances, material specifications, and hardness requirements.
3D models (STEP, IGS, or CAD files) for complex geometry analysis.
Estimated annual volume (EAU) or specific order quantities.
Any specific compliance (RoHS, REACH, FDA) or custom packaging needs.
Answer: Our in-house tooling lab allows us to accelerate the timeline significantly. Prototyping typically takes 5–15 business days, while mass production molds and the initial pilot run usually take 20–35 business days. Lead times may vary slightly based on part complexity and material availability.
Answer: We implement a Zero-Risk Quality Control policy. This includes 100% inspection of critical dimensions using advanced 2D/3D vision systems and automated measurement equipment. As an ISO 9001:2015 certified facility, every batch undergoes strict OQC (Outgoing Quality Control) before being dispatched to your warehouse.