Figure 1 - Isometric example relative to asbuilt survey with material take off created from specification
Figure 1 - Isometric example relative to asbuilt survey with material take off created from specification
Figure 2 - As built tie point and corridor survey in well bay
Figure 3 - As built tie point and corridor survey along manifold and well bay
Figure 4 - multi-view drawing from as-built survey
Figure 5 - multi-view drawing from as-built survey of bearing pad levels
Figure 6 - clash check for path of predicted winching operations against existing structure
Figure 7 - typical red line mark-up of piping isometric
Figure 8 - plan, elevations and 3D model representation of as-built structure to determine actual dimensions between components
Figure 9 - plan layout of guide rails for alignment information and isometric detail
Figure 10 - multi-view drawing from as-built survey
sites.google.com/view/teccra-ltd