PHASES OF A MAJOR REMODELING PROJECT AND WHAT TO EXPECT
A SIGNIFICANT HOME REMODELING PROJECT UNFOLDS THROUGH A SEQUENTIAL, STEP-BY-STEP PROCESS. EACH PHASE, FROM THE INITIAL DESIGN CONCEPT TO SITE PREPARATION AND THE FINAL WALK-THROUGH, BUILDS UPON THE PRECEDING ONE. UNDERSTANDING THIS PROGRESSION HELPS HOMEOWNERS VISUALIZE THE PROJECT AND STAY INFORMED ABOUT ITS PROGRESS. FURTHERMORE, COLLABORATING WITH A DESIGN-BUILD FIRM ENSURES A SEAMLESS TRANSITION BETWEEN PHASES. OUR GOAL HERE IS TO GUIDE YOU THROUGH THE VARIOUS STAGES OF A MAJOR HOME REMODELING PROJECT, EQUIPPING YOU WITH KNOWLEDGE OF WHAT TO ANTICIPATE, THE TIME COMMITMENT INVOLVED, AND HOW TO ADDRESS ANY QUESTIONS THAT MAY ARISE.
📐INITIAL PLANNING & DESIGN 📐
YOU WOULDN'T JUST HOP IN YOUR CAR FOR VACATION WITHOUT KNOWING WHERE YOU'RE GOING, RIGHT? A BIG REMODEL IS THE SAME – IT NEEDS SOME SERIOUS THOUGHT! WITH SO MANY THINGS TO FIGURE OUT AND CHOICES TO MAKE, IT'S BEST TO START WITH THE END IN MIND AND WORK BACKWARD. FIRST, PICTURE WHAT YOU WANT THE FINISHED PROJECT TO LOOK LIKE. THEN, PLAN OUT EACH STEP TO GET THERE.
BEFORE YOU EVEN CALL A CONTRACTOR, IT'S A GOOD IDEA TO HAVE SOME VISUALS TO SHOW THEM. START BY FLIPPING THROUGH MAGAZINES AND CHECKING OUT SITES LIKE PINTEREST OR HOUZZ TO GET SOME INSPIRATION. COLLECTING PHOTOS OF ROOMS YOU LOVE WILL REALLY HELP YOUR CONTRACTOR SUGGEST THINGS THAT MATCH YOUR STYLE. ALSO, START A LIST OF "MUST-HAVES" AND "NICE-TO-HAVES." THESE DETAILS WILL TELL YOUR CONTRACTOR WHAT'S NON-NEGOTIABLE AND WHAT'S A BUDGET PRIORITY. AND IF THERE'S SOME CASH LEFT OVER, WHAT OTHER LITTLE EXTRAS WOULD MAKE YOU EVEN HAPPIER!
🔍 DISCOVERY PHASE 🔎
ONCE YOU PICK YOUR DESIGN-BUILD FIRM, A DESIGNER WILL WALK YOU THROUGH THE DISCOVERY PHASE. THIS IS WHERE YOU'LL EXPLORE AND VISUALIZE EVERY OPTION, FROM FIGURING OUT YOUR DESIGN PREFERENCES AND STYLE TO NAILING DOWN THE PROJECT'S SCOPE AND SETTING A REALISTIC BUDGET. DURING THIS PHASE, YOUR DESIGNER WILL:
CONDUCT A THOROUGH SURVEY AND PRECISE MEASUREMENTS OF THE EXISTING SPACE.
CREATE "AS-BUILT" DRAWINGS TO ACCURATELY DOCUMENT THE CURRENT DIMENSIONS AND CONDITIONS OF THE HOME.
DEVELOP A COMPREHENSIVE "SCOPE OF WORK" DOCUMENT.
GENERATE PRELIMINARY CONCEPTUAL DRAWINGS.
PRESENT A "PRELIMINARY BUDGET" FOR REVIEW AND APPROVAL.
🎨 DESIGN PHASE 🎨
DETAILED DESIGN DEVELOPMENT.
ONCE THE PRELIMINARY BUDGET IS APPROVED, YOU’LL MOVE TO THE DESIGN PHASE OF YOUR PROJECT. HERE, YOU’LL WORK WITH SOMEONE TO MOVE TOWARD PRODUCING A COMPLETE SET OF WRITTEN PROJECT SPECIFICATIONS AND A FINAL COST ESTIMATE. IN THIS STAGE, YOU’LL CONSULT WITH THE DESIGN TEAM AS THEY:
ESTABLISH REALISTIC MATERIAL ALLOWANCES FOR A COST ESTIMATE
PRODUCE DETAILED DESIGN DRAWINGS
REVIEW EXISTING MECHANICAL SYSTEMS/PROPOSE ANY NECESSARY MODIFICATIONS
REVISE PLANS AND SPECIFICATIONS TO CONFIRM BUILD-ABILITY
MEET WITH SUBCONTRACTORS AND SUPPLIERS TO INCORPORATE THEIR EXPERTISE INTO THE DESIGN
FINALIZE WRITTEN SPECIFICATIONS AND A FINAL COST ESTIMATE
BLUEPRINTS AND BUDGET IN HAND, YOU’RE READY FOR THE NEXT PHASE–CONSTRUCTION. THE CONSTRUCTION PHASE OF YOUR HOME REMODEL WILL HAPPEN IN TWO STAGES.
📝PRE-CONSTRUCTION 📝
EACH STEP IN ANY MAJOR REMODELING PROJECT BUILDS UPON THE PREVIOUS ONE. FOR THIS REASON, YOUR TEAM WILL TAKE SPECIAL CARE BEFORE CONSTRUCTION BEGINS IN COORDINATING WHEN EACH SUBCONTRACTOR WILL BE ONSITE TO CREATE A SCHEDULE WITHOUT OVERLAP OR DOWNTIME. PRE-CONSTRUCTION IS WHEN YOU’LL WORK WITH THE TEAM TO:
****************************************************************************************************************************
ESTABLISH A TIMELINE AND CREATE AN ELECTRONIC SCHEDULE
MEET WITH DESIGNERS TO CHOOSE PRODUCT SELECTIONS
PRODUCE FINAL DRAWINGS
APPLY FOR BUILDING PERMITS
ORDER MATERIALS (ARRIVAL OF MATERIALS COULD TAKE FROM TWO TO 16 WEEKS)
ASSIGN A LEAD CARPENTER
PREPARE A CONSTRUCTION SCHEDULE
PARTICULARLY IMPORTANT DURING THIS STAGE IS ESTABLISHING A COMMUNICATIONS PORTAL BETWEEN THE PROJECT MANAGER AND THE HOMEOWNER. SOME DESIGN-BUILD FIRMS USE A CONSTRUCTION PROJECT MANAGEMENT SOFTWARE THAT ALLOWS HOMEOWNERS AN INSIDE LOOK INTO WHAT’S HAPPENING WITH THEIR REMODEL AND COMMUNICATE WITH THEIR TEAM. IN ADDITION, HOMEOWNERS CAN SEE THE SCHEDULE AND FOLLOW THE SPECIFIC MILESTONES OF THEIR DESIGN-BUILD PROJECT AS OUTLINED IN THEIR CONTRACT.
🛠️ CONSTRUCTION 🛠️
WITH PERMITS SECURED AND MATERIALS ORDERED OR ONSITE, CONSTRUCTION BEGINS. DURING THIS PHASE, YOU’LL NOTICE THE PROJECT UNFOLD IN STAGES, STARTING WITH THE BASICS:
SITE PREP/DEMOLITION–LASTING ABOUT A WEEK, THIS INCLUDES THINGS LIKE DISMANTLING KITCHEN CABINETS, TEARING OUT OLD FLOORING, OR KNOCKING DOWN WALLS. WHATEVER IT TAKES TO GET A CLEAN SLATE TO START BUILDING HAPPENS NOW.
FOUNDATION EXCAVATION–EXCAVATION INCLUDES MOVING THE EARTH TO MAKE WAY FOR THE FOUNDATION FOR A HOME ADDITION. IT COULD CONSIST OF REMOVING TREES AND/OR SHRUBS. AND, IF THERE ARE ANY UNDERGROUND UTILITIES, YOUR CONTRACTOR ARRANGES TO PROTECT OR MOVE THEM.
FOUNDATION CONSTRUCTION–A FOUNDATION COULD INCLUDE LAYING BLOCK AND/OR POURING CONCRETE, DEPENDING ON YOUR TOPOGRAPHY AND THE SCOPE OF THE JOB. ONCE COMPLETE AND THE FOUNDATION PASSES INSPECTION, THEY MOVE THE EARTH BACK AGAINST THE WALLS AND SLOPE AWAY FROM THE HOUSE.
FRAMING–NEXT, CARPENTERS FRAME THE WALLS WHERE NEEDED AND, IF EXTERIOR, COVER THEM WITH SHEATHING.
ROOF–FOR A HOME ADDITION, THE ROOF IS NEXT. ROOF TRUSSES FIRST CREATE A WOODEN FRAMEWORK ON WHICH ROOFERS WILL ADD THE DECKING AND ROOF MATERIALS.
WINDOWS AND DOORS–ONCE THE ROOF IS DONE, ADDING WINDOWS AND DOORS KEEPS YOUR HOME ADDITION PROTECTED FROM THE WEATHER.
SIDING–ALSO, FOR A HOME ADDITION, ADDING THE SIDING, SOFFIT, FASCIA, AND GUTTERING IS THE FINAL STEP TO PROTECTING YOUR HOME FROM THE ELEMENTS.
MECHANICALS–NOW’S THE TIME FOR ROUGHING IN THE PLUMBING, ELECTRICAL, AND HVAC. IF THE JOB INCLUDES A KITCHEN OR BATH, THE PLUMBERS COME NOW TO MOVE EXISTING OR ADD NEW PIPES, INCLUDING WATER SUPPLY, DRAIN, AND SEWAGE LINES. NEXT, ELECTRICIANS WIRE NEW WALLS AND MAKE ANY NECESSARY MODIFICATIONS TO EXISTING WIRING. AND FINALLY, HVAC PROFESSIONALS INSTALL DUCTWORK, VENTS, AND ANY PIPING NEEDED FOR YOUR HEATING AND COOLING. IF YOU’RE ADDING NEW GAS APPLIANCES, SOMEONE WILL INSTALL GAS LINES, TOO. ALL THESE MECHANICALS WILL REQUIRE AN INSPECTION BEFORE PROCEEDING WITH THE JOB.
INSULATION–FINALLY, THE WALLS GET INSULATION.
NOW THAT THE PROJECT STARTS TO TAKE SHAPE, THE BUILDERS BEGIN TO APPLY THE SKIN THAT MAKES THE REMODEL YOURS:
WALLS AND FINISHES–AFTER EVERYTHING THAT GETS HIDDEN INSIDE THE WALLS IS DONE, THE BLUEBOARD AND PLASTER GETS HUNG, CROWN MOLDING GOES IN, TRIM AROUND DOORS AND WINDOWS, AND ALL THOSE FINISHING TOUCHES.
FLOORING–NEXT, THE FLOORING GETS INSTALLED, FOLLOWED BY BASEBOARDS AND THRESHOLDS.
CABINETRY–FOR A BATHROOM OR KITCHEN REMODEL, CABINETS GO IN NEXT.
FINISH PLUMBING, ELECTRICAL, HVAC–ONCE THE CABINETS ARE IN, THE PLUMBERS COME BACK TO INSTALL THE SINKS, TUBS, SHOWERS, AND ALL THE FAUCETS. AND, THE ELECTRICIANS COME BACK TO HOOK UP ALL THE RECEPTACLES, LIGHT SWITCHES, INSTALL LIGHTING FIXTURES, AND MAKE SURE ALL YOUR SMART DEVICES ARE CONNECTED.
PAINT–NOW, FOR THE FUN PART. APPLYING PAINT AND WALLCOVERINGS MAKES YOUR REMODEL LOOK LIKE A HOME.
APPLIANCES–NEXT, ALL THE APPLIANCES GET INSTALLED AND CONNECTED TO YOUR HOME’S SMART HUB.
LANDSCAPING–AND FINALLY, NOW THAT YOUR HOME IS FREE OF WORKERS, A LANDSCAPE CREW COMES TO INSTALL ANY NECESSARY GRASS, TREES, OR SHRUBS.
🏁 WRAP-UP 🏁
ONCE ALL THE REMODELING WORK IS DONE, YOU'LL WALK THROUGH THE TRANSFORMED AREA WITH YOUR CONTRACTOR. THIS IMPORTANT INSPECTION IS YOUR CHANCE TO REALLY LOOK AT EVERYTHING, MAKING SURE THE FINAL RESULT NOT ONLY MEETS BUT TOTALLY BLOWS PAST YOUR EXPECTATIONS, AND THAT YOU'RE ABSOLUTELY THRILLED WITH THE CRAFTSMANSHIP AND OUTCOME.
DURING THIS WALKTHROUGH, YOUR CONTRACTOR WILL ALSO SHOW YOU HOW TO USE ANY NEW FEATURES. THIS INCLUDES THINGS LIKE PRACTICAL DEMONSTRATIONS ON HOW TO SET THE TEMPERATURE OF A NEW WATER HEATER FOR THE BEST ENERGY EFFICIENCY AND COMFORT, OR HOW TO PROGRAM AND USE THE TIMERS FOR ANY NEW LIGHT FIXTURES, SO YOU CAN CUSTOMIZE YOUR LIGHTING AND SAVE ENERGY.
THE CONTRACTOR WILL TAKE THE TIME TO GO OVER ALL THE WARRANTIES FOR THE NEW EQUIPMENT AND APPLIANCES, EXPLAINING THE TERMS, WHAT'S COVERED, AND ANY REGISTRATION YOU NEED TO DO. THEY'LL ALSO LAY OUT THE WARRANTY DETAILS FOR THEIR OWN SERVICE AND WORKMANSHIP, GIVING YOU PEACE OF MIND AND A CLEAR IDEA OF THE SUPPORT YOU CAN GET IF ANY ISSUES POP UP AFTER THE PROJECT IS FINISHED. THIS FINAL STEP MAKES SURE YOU'RE TOTALLY INFORMED AND CONFIDENT ABOUT HOW LONG AND HOW WELL YOUR NEWLY REMODELED SPACE WILL FUNCTION.
SO, AS YOU CAN SEE….A MAJOR REMODELING PROJECT INCLUDES SO MANY STEPS, MOVING PARTS, COORDINATION, AND SUCH CAREFUL PLANNING YOU WANT TO MAKE SURE IT’S DONE RIGHT. THAT’S WHY IT’S SO IMPORTANT TO PARTNER WITH EXPERIENCED PROFESSIONALS