If Navigation Menu is not displayed on the left side, click on three horizontal bars on the top left below this banner.
In this page:
In this case, about 14 acres of contiguous open space is required as part of Superior Design of Cluster Subdivision.
In 2019 PLUS application, there was 30 acres of wetland, but now only 4.87 acres.