GSTIN-09AHGPL1068E1ZG

SURYA CONSTRUCTION

Profile

Registered Office:

VILLEGE – GOUHARPUR, PO – KAKUA , DISS. –AGRA ,

(UP) 282009 M.805781128 horilalbanger@gmail.com

https://sites.google.com/view/suryaconstruction/home

https://sites.google.com/view/suryaconstruction/sc

https://surya-construction-road-construction-company.business.site/?m=true#gallery

Profile

Surya Constructions Based at house no. 368 VILLEGE – GOUHARPUR, PO – KAKUA , DISS. –AGRA (UP) 282009, came into existence in 01/09/2001 by Mr. horilal (civil engineer & DCA) as a contractor. Now our new Registered address is Surya Constructions house no. 368 VILLEGE – GOUHARPUR, PO – KAKUA , DISS. –AGRA , (UP) 282009, as Proprietor.

We, SURYA Constructions, are in the process of working towards our goal of the launch of our new project of KERB LAYING in PNC Infratech Limited four laine carriage way Construction Agra-Gwalior section of NH – 3 in the state of Utter Pradesh From Km.8000 To Km. 24000. Client-NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI) In initial stage. During the current days we are perform so many projects of KERB LAYING, DRAIN WORK, PQC ROADS with reputed clients like PNC Infratech Limited,JAIPEE INFRATECH, Oriental Structural Engineer’s Ltd, IRB INFRASTRUCTURE DEVELOPER LIMITED, GMR IGI AIRPORT LIMITED Delhi.

After That we are perform also in other activities like C&G, Earthwork ,Subgrad , GSB , WMM,DLC,KERB LAYING, DRAIN WORK, PQC ROADS, BOX CULVRT, BRICKWORK etc.

Our equipment strength consisting of the following:-

1 KERB LAYING MACHINE

1 SOIL COMPACTOR

1 JCB

4 TRACTOR

1 PQC CUTTING MACHINE

1 CORE CUTTING MACHINE

2 BOLLERO

10 BICKS

It gives us a lot of pride and pleasure today to state that we have now grown to be the single largest Contractor of KERB LAYING, DRAIN WORK, PQC ROADS with reputed clients. like Tata Projects, Bayaweaver Limited, L&T Limited, PNC Infratech Limited,JAIPEE INFRATECH, Oriental Structural Engineer’s Ltd., IRB INFRASTRUCTURE DEVELOPER LIMITED, GMR IGI AIRPORT LIMITED Delhi, Ms Leighton contractor’s India Ltd.etc.

We are the leading contractor in INDIA of KERB LAYING, DRAIN WORK, PQC ROADS with reputed clients. We have been worked for so Many clients as listed in our profile. The details of some of our major projects are tabled here below for your reference . -

1. M/S BACKBONE PROJECT’S Ltd.

Period : from August 2002 to August 2004

Consultant : GHERZI ESTERN LIMITED

Project : Construction of four laning(MORENA-GWALIOR section of NH–3)In the state of MP (From KM 85+000TO101+000)

Client : NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI)

2. Oriental Structural Engineer’s LtD.

Period : from August 2004 to August 2006

Consultant : Intercontinental Consultant & Technocrat Pvt. Ltd. (New Delhi)

Project : Construction of four laning (agra-bhoganipur section of NH–2)In the state of UP (From KM 19.000 to 50.000)

Client : NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI)

3. Ms Leighton contractor’s India Ltd.

Period : from August 2006 to 20.12.2007

Consultant : Intercontinental Consultant & Technocrat Pvt. Ltd. (New Delhi)

Project : Construction of four laning (Indore – Khalghat section of NH-3In the state of MP

Client : NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI)

4. ORIENTAL STRUCTURAL ENGEENIR’S limited

Period : from20.12.2007 to 10.10.2008

Consultant : GMR IGI AIRPORT LIMITED Delhi

Project : INDRA GANDHI INTERNATIONAL AIRPORT LIMITED

Client : AIRPORT AUTHORITY OF INDIA

5. PNC Infratech Limited

Period : from 10.10.2008 to Feb. 2010

Consultant : Wilbur Smith Associate Inc.

Project : four lane carriage way, Construction (Strengthening and Widening) of NH-3 in the state of Rajasthan/ MP

Client : NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI)

6.Oriental Structural Engineer’s Ltd.

Period : from feb 2010 to may 2012

Consultant : CES

Project : Construction of Sixlaning (noida-agra) YAMUNA EXPRESSWAYIn the state of UP (From KM 110.225 to 165.537)

Client : JAIPEE INFRATECH

7.Oriental Structural Engineer’s Ltd

Period : from may 2012 to February 2016

Client &consultant :Oriental Structural Engineer’s Ltd.

Project : Construction of six laning (ETAWA-CHAKERI section of NH-2)In the state of UP (From KM 423.475 to 483.687)

8.Oriental Structural Engineer’s Ltd.

Period : from February 2016 to October 2020

Client :IRB INFRASTRUCTURE DEVELOPER LIMITED

Consultant: : Intercontinental Consultant & Technocrat Pvt. Ltd. (New Delhi)

Project : Construction of six laning (AGRA-ETAWA section of NH-2)In the state of UP (From KM 199+660 to 423+520)

9.RP INFRAVENTURE PRIVATE LIMITED

Period : from October 2020 to Till Date

Client : AGRA DEVLOPMENT AUTHORITY

Consultant: : Transys Consulting private limited

Project : Construction of six laning (AGRA inner ring road) In the state of UP (From KM 11+000 to 18+000)

10.GANPATI MEGHA BUILDER INDIA PRIVATE LIMITED

Period : from January 2021 to Till Date

Client : AGRA NAGAR NIGAM AGRA ( AGRA SMART CITY )

Consultant: : Darashaw & Company private limited

Project : REHABILITATION OF MINOR ROADS AGRA

We can therefore offer our services to you in the following areas of works where we provide a complete package like that C&G, Earthwork ,Subgrad , GSB , WMM,DLC,KERB LAYING, DRAIN WORK, PQC ROADS, BOX CULVRT, BRICKWork etc.