01.
Artificial Intelligence (AI)-based Digital Twin Framework for Real-Time Transient Stability Assessment and Protection of Renewable-dominated Power Systems.
ANRF
(ARG Scheme)
PI
₹ 96.67 Lakhs
Ongoing
(March, 2026 -
March., 2029)
02.
Development of Resilient Protection Schemes (RPS) for Converter-Interfaced Renewable Source Dominated Power Systems.
IIT Indore
(YFRSG Scheme)
PI
₹ 10.00 Lakhs
Completed
(Sept., 2023 -
Sept., 2025)
01.
Proof checking of design for Provision of Rigid Overhead Conductor System (ROCS) in BGTA tunnel between ET-MKP section of Jabalpur division and other measures.
Competent Electric Systems
PI
Ongoing
(May, 2026 - Present)
02.
Vetting of BOQ and Drawings of Military Engineering Services 0.825 MWp Ground mounted Solar project at Chumthang, Ladakh.
Electricity No Problem
PI
Completed
(May, 2025 -
Oct., 2025)
03.
Assessment and Proof-checking of Designs and Drawings (E & M Service) for ESIC Hospital Pune.
Dee Vee Projects Limited
PI
Completed
(Apr, 2024 -
March, 2026)