Search this site
Embedded Files

Caution: These specs may have been altered. Refer to current version of the distribution manual in the pop-up link found on the Updated Manual page.

Take me to current manual
SpecTech
  • Home
  • Overhead Construction Specifications
    • 6.08-308 Two Phase Vertical Tangent Construction Open-Wye Primary Banking C
    • 6.08-104 Single Phase Deadend Construction Single Phase Transformer
    • 6.08-100 Single Phase Tangent Construction Single-Phase Transformer
    • 06.08-112 Two Phase Horizontal Tangent Construction Single-Phase Transform
    • 06.08-116 Two Phase Horizontal Deadend Construction Single-Phase Transform
    • 06.08-120 Two Phase Vertical Tangent Construction Single -Phase Transform
    • 06.08-140 Three Phase Vertical Tangent Construction Single-Phase Fused Tap
  • Underground Construction Specifications
  • FAQ
SpecTech

Distribution Manual (Updated)

overhead.pdf

Here lies the current distribution manual, please feel free to reference any of the design specs within this website so that all components and notes are consistent with the current version, thank you.

Email: Malachi.johnson-taylor@duke-energy.com | 15040 SW 107th Ave | Cell: (305)-742-1358

Google Sites
Report abuse
Page details
Page updated
Google Sites
Report abuse