04/01/2019
The team has completed the presentation and done well!
There is an issue with the code overriding the commands and affecting the readings.
There are still areas for the project to head towards, such as creating an app and poster for the Engineering Showcase held in Singapore Polytechnic.
The team will be focusing their efforts on completing the leftover requirements of the project and satisfying the Engineering Showcase for the remaining weeks.
-John
07/01/2018
The team worked on the poster and the report. As of this blog entry, the poster is incomplete and the format is not refined yet. Only the information has been displayed. Further refinement will be done.
QR codes will be used to direct users to the relevant information such as the one attached to today's blog.
-Ethan
08/01/2019
The team completed the report and updated the poster design. The poster is being reviewed by peers and will be refined even further for the preparation of the Engineering Roadshow and MDP presentation.
The team also confirmed the ability to print out A2 sized poster for the presentation.
-John
14/01/2019
Code rewritten to add a better timer and improved efficiency
Added a feature to correct for random incorrect readings
The code uploaded in the report has been colour coded to separate the code from the comments for easier reading, especially during the booth presentation
The poster was sent for printing
There has been a lack of updated days in between Day 73 and Day 74 due to the code being reworked within those days. It is mostly the same for all the days
-Samuel
15/01/2019
The poster was ready and there will be a mannequin to hold the poster and the device for the booth presentation.
There was an issue found with the device. Currently it is designed for the usage of a member where the sensors are placed on the top of his shoulders. For other people, the sensors are placed at the front of the shoulders.
The video is undergoing some editing to prepare for the Engineering Show
-Ethan
16/01/2019
The team went to set up the booth for the Engineering Show. The poster was set up to prepare for the Engineering Show. The video was halfway done. It is left with the subtitles and the images meant to be shown.
The mannequin was shifted down for the exhibition.
-Ethan
17/01/2019
The team presented the product from 9:30am to 8:15pm. All of the feedback was positive and receptive. There were some comments that may be implemented into the system in the future:
More will come for the second day of SP Engineering Show. As of now, it is a job well done from the team!
-John
18/01/2019
The team presented the final day of the SP Engineering Show and it was not as eventful as yesterday as lesser people were there to critique the product. They do say that the product is marketable and had potential to be passed down as an FYP project for future project groups.
The poster has to be reprinted and resized due to the A3 limitations of the project.
The IoT system is being worked on and will be implemented soon. Tackling the calibration issues will be done after the SP Engineering Show has been concluded.
-Samuel
21/01/2019
The team tested the prototype and found that when twisting too far too the right, it was detected as being twisted left. Future calibrations will be done to figure out the issue. It was proposed that it was a coding issue. The sensors may be a bit faulty but it should be able to work with what is intended.
The poster is undergoing rework to tackle the issue of the QR code not working
-Samuel
22/01/2019
The webserver was continued to be worked on
The team went to do a skype call to elaborate on what to do over the last 2 weeks of the project. What was discussed are these:
-John