(*Correspondence)
Tae-Gyung Lee, Tae-Sun Yu, and Tae-Eog Lee*, "Cleaning Plan Optimization for Cluster Tools with General Cleaning Periods", IEEE Transactions on Automation Science and Engineering, DOI: 10.1109/TASE.2022.3188858.
Chulhan Kim, Tae-Sun Yu*, and Tae-Eog Lee, “Feedback Control of Cluster Tools: Stability against Random Time Disruptions”, IEEE Transactions on Automation Science and Engineering (IF: 6.636), vol. 19, no. 3, July 2022.
Woojin Kim, Tae-Sun Yu*, and Tae-Eog Lee, “Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns”, IEEE Transactions on Systems, Man, and Cybernetics: Systems (IF: 13.451), vol. 51, no. 12, Dec 2021.
Sung-Gil Ko, Tae-Sun Yu*, and Tae-Eog Lee, “Wafer Delay Analysis and Workload Balancing of Parallel Chambers for Dual-Armed Cluster Tools with Multiple Wafer Types”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 18, no. 3, July 2021.
Tae-Sun Yu and Jun-Hee Han*, “Scheduling Proportionate Flow Shops with Preventive Machine Maintenance”, International Journal of Production Economics (IF: 7.885), vol. 231, Jan 2021.
Chulhan Kim, Tae-Sun Yu*, and Tae-Eog Lee, “Reachability Tree Based Optimization Algorithms for Cyclic Scheduling of Timed Petri Nets”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 18, no. 3, July 2021.
Tae-Sun Yu and Michael Pinedo*, “Flow Shops with Reentry: Reversibility Properties and Makespan Optimal Schedules”, European Journal of Operational Research (IF: 5.334), vol. 282, no. 2, pp. 478–490, Apr 2020.
Yuchul Lim, Tae-Sun Yu, and Tae-Eog Lee*, “Adaptive Scheduling of Cluster Tools with Wafer Delay Constraints and Process Time Variations Based on Timed Petri Nets”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 17, no. 1, pp. 375–388, Jan 2020.
Tae-Sun Yu and Tae-Eog Lee* , “Wafer Delay Analysis of Dual-Armed Cluster Tools with Chamber Cleaning Operations”, International Journal of Production Research (IF: 8.568), vol. 58, no. 2, pp. 434–447, 2020.
Sung-Gil Ko, Tae-Sun Yu*, and Tae-Eog Lee, “Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types with Identical Job Flows”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 16, no. 3, pp. 1058–1070, July 2019.
Yuchul Lim, Tae-Sun Yu*, and Tae-Eog Lee, “A New Class of Sequences without Interferences for Cluster Tools with Tight Wafer Delay Constraints”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 16, no. 1, pp. 392–405, Jan 2019.
Tae-Sun Yu and Tae-Eog Lee, “Scheduling Dual-Armed Cluster Tools with Chamber Cleaning Operations”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 16, no. 1, pp. 218–228, Jan 2019.
Tae-Sun Yu, Hyun-Jung Kim, and Tae-Eog Lee, “Scheduling Single-Armed Cluster Tools with Chamber Cleaning Operations”, IEEE Transactions on Automation Science and Engineering (IF: 5.083), vol. 15, no. 2, pp. 705–716, April 2018.
Tae-Sun Yu, Hyun-Jung Kim, and Tae-Eog Lee, “Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop with Waiting Time Constraints and Skipping Jobs”, IEEE Transactions on Semiconductor Manufacturing (IF: 1.140), vol. 30, no. 2, pp. 155–165, May 2017.
Papers Under Review
Chihyun Jung, Tae-Sun Yu, Chulhan Kim, Tae-Eog Lee*, and Yongmoon Kim, "Modeling and Scheduling of Batch Processing Cluster Tools for Semiconductor Manufacturing", IEEE Transactions on Automation Science and Engineering.
Min-Chan Kim and Tae-Sun Yu*, "Wafer Flow Time Control in Robotized Semiconductor Manufacturing Tools", IEEE Transactions on Systems, Man, and Cybernetics: Systems.
Nurhak Aktas, Tae-Sun Yu, and Tae-Eog Lee, “Transient Period Scheduling of Dual-Armed Cluster Tools”, Asia Pacific Industrial Engineering and Management Systems Conference, Jeju, Korea, Oct 2014.
Tae-Sun Yu and Tae-Eog Lee, “Scheduling of Cluster Tools with Complex Scheduling Requirements: Chamber Cleaning”, Conference of the International Federation of Operational Research Societies (IFORS), Barcelona, Spain, July 2014.
Tae-Sun Yu, Hyun-Jung Kim, Chanwhi Jung, and Tae-Eog Lee, “Two-Stage Lot Scheduling with Waiting Time Constraints and Due Dates”, Winter Simulation Conference, Washington, DC, USA, Dec 2013.