1. Marketing.
2. Estimation of profit.
3. Planing (Drawing > Estimating > Manpower Cost)
1. Possibility
2. If impossible (Internal department note or sub-contract)
1. Send ASR to store for raw materials.
2. Materials sand blasting.
3. Red oxide Primer on raw materials (1 code).
4. Cutting materials with appropriate design & measurements.
5. Fitting & Building (Welding & Grinding) by using production design.
6. Passing internal quality.
7. Erection.
8. Painting (1 Code).
9. Fitting Zinc Anode.
10. Final code of paint (1 code).
11. Maintaining ISO formatting.
12. Delivery.
1. Shear Machine.
2. Side bending machine.
3. 500/400 ton hydraulic pressure machine.
4. Sheet bending roller machine.
5. Pipe bending machine.
6. Bench Drill.
7. Bench grinder.
8. Power saw.
9. Upper Crane .
1. Safety & fire fighting.
2. Docking & Undocking.
3. Rudder & propellers.
4. Painting.
5. Plating & Welding.
6. Valve & Piping.
7. Transport & Service.
8. Machine Shop.
1. Lightning hole.
2. Inner bottom plate.
3. Margin Plate.
4. Stiffener.
5. Center line.
6. Keel plate.
7. Holland profile.
8. Stack plate.
9. Docking bracket.
10. Bilge plate.
11. Air hole.
12. Water hole.
13. Eleps.
14. Above base line.