Work Experience
Currently working as a GIS & Environmental Specialist at GIS & RS Solution-Center for Geospatial & Environmental Solutions
Also Founder, Trainer & Content Creator of GIS & RS Solution YouTube Channel
Dates (from-to): June 2020 – present
Main Activities and Responsibilities: I have practical experience and in-depth knowledge in AutoCAD, GIS, Remote Sensing, spatial planning, and a wide range of environmental modeling software, including SoundPLAN, AERMOD, HEC-RAS, HEC-HMS, SWMM, ALOHA, WRPLOT, ArcGIS, ArcGIS Pro, QGIS, ENVI, TerrSet, Google Earth Engine (GEE) and related data management and technical report writing. I have created this YouTube-based training platform where Tania Yeasmin and I teach and share geospatial and environmental engineering & management skills with a global audience. Through this channel, We develop and deliver practical, application-focused tutorials to support students, researchers, and professionals in strengthening their technical capabilities.
Type of Sector: Geospatial & Environmental Services
Previous Work Experience
Employment 1
Dates (from-to): July 2021 – Auguts 2025
Name and Address of Employer: EQMS Consulting Limited, (Bangladesh Head Office), House #53, Road #4, Block-C, Banani, Dhaka-1213, Email: info@eqms.com.bd
Position: Environmental Consultant
Main Activities and Responsibilities: My main responsibilities include the preparation of Environmental and Social Impact Assessment (ESIA) reports, feasibility study reports, and monthly, quarterly, and annual Environmental, Health, and Safety reports for infrastructure development projects. I support the implementation of the Environmental and Social Management Plan (ESMP) during the construction phase, assisting contractors. I also perform environmental and social monitoring during both the construction and operation phases. Additionally, I help contractors implement the Environmental and Social Management Plan in accordance with the ESIA, as approved by international lenders such as the ADB, World Bank, JICA, AIIB, and KfW. I am also involved in the preparation and review of technical and financial proposals related to environmental and climate change studies.
Type of Sector: Research & Consultancy
Employment 2
Dates (from-to): November 2017 – June 2021
Name and Address of Employer: EQMS Consulting Limited, (Bangladesh Head Office), House #53, Road #4, Block-C, Banani, Dhaka-1213, Email: info@eqms.com.bd
Position: Assistant Consultant (Environment & Social)
Main Activities and Responsibilities: Preparation and Review of EIA, ESIA, CEMP, EMAP, EHS, Monthly, Quarterly, Annually Environmental, Health & Safety Report; Support for ESMP implementation during the construction phase to the contractor; Perform Environmental and social monitoring during construction and operation Phase; Air quality and noise modeling based on the project requirement; Support contractor to implement environment & social management plan according to ESIA as approved by Lenders; Preparation of Technical and Financial Proposal
Type of Sector: Research & Consultancy
Employment 3
Dates (from-to): January 2017 – October 2017
Name and Address of Employer: Environment and Resource Analysis Center (ENRAC) Ltd, (House 15, Level 3, Block C Rd 7, Dhaka 1212, Bangladesh; Email: info@enrac.com.bd
Position: Environmental Officer
Main Activities and Responsibilities: My responsibilities include designing questionnaires and preparing environmental checklists, as well as preparing various types of environmental study reports. I also handle the planning of projects to ensure proper mobilization of the field team. Additionally, I perform supervision and coordination during fieldwork, ensuring everything runs smoothly. I prepare GIS maps for the projects, conduct monitoring and evaluation of project work, and lead the field team for both social and environmental fieldwork.
Type of Sector: Research & Consultancy
Employment 4
Dates (from-to): October 2016 – December 2016
Name and Address of Employer: Sterling Group, Beron, Earpur, Ashulia, Saver, Dhaka-1349, Bangladesh; Email: management@sterlinggroup.com.bd
Position: Environmental Officer
Main Activities and Responsibilities: I was responsible for preparing policies and documentation for EIA, EMS, EMP, OHSAS, RM, and energy efficiency. I ensured facility compliance with environmental regulations, tracked energy, water, emissions, and waste, and approved related data. I set annual improvement targets for energy, GHG emissions, and waste. I conducted internal environmental audits, addressed non-conformities, and led training to ensure workforce awareness of their environmental and health safety responsibilities.
Type of Sector: Apparel manufacturing industry
Employment 5
Dates (from-to): April 2015 – September 2016
Name and Address of Employer: HawarIT Limited (Bangladesh Office), Zirabo 1341, Bangladesh; Bangladesh; Email: info@hawarIT.com
Position: CAD/GIS Engineer
Main Activities and Responsibilities: My responsibilities included preparing map layouts using ArcGIS 10 and 10.1 for project activities, including geo-referencing. I estimated, planned, and prepared CAD/GIS proposals for both local and foreign tasks, managed GIS data, and prepared presentations using various tools for potential customers. I also conducted CAD and GIS-related R&D, communicated with local and foreign clients, and handled customer support requests by assigning resources for assistance. Additionally, I reported project status to the Director.
Type of Sector: IT & Geo-ICT services
Awards & Scholarships
Dean’s Merit List Award for Outstanding Academic Achievement (Issued by Faculty of Disaster Management, Patuakhali Science and Technology University, Bangladesh, Jun 2014)
CAS Belt Road Master Fellowship, Chinese Academy of Sciences (CAS), China, 2019
Project Experience (2016 to 2025)
Project 18
Name of assignment or project: Consulting Services of Renewable Energy Programme (REP)
Duration (Month and Year): November 2024 to date
Client: GOPA-International Energy Consultants GmbH, IDCOL
Lender: KfW Development Bank
Location: Savar, Gazipur, Keraniganj, Chuadanga
Main project features: Policy and gap assessment between IDCOL, KFW, World Bank for renewable energy project, environmental and social monitoring, and assessment
Positions Held: National ESIA/ESHS Specialist
Activities performed: Study the ESSF of IDCOL, legal framework of Bangladesh and KfW ESHS Safeguards, Conducting site inspections and collect from project sites for 4 rooftop solar and 3 solar irrigation project, ESSHS Improvement Action Plan
Project 17
Name of assignment or project: Development, Management, and Supervision of Biodiversity Conservation Plan of Bangladesh Regional Waterway Transport Project 1 (BRWTP-1)
Duration (Month and Year): August 2022 to date
Client: Bangladesh Inland Water Transport Authority (BIWTA)
Lender: World Bank
Location: Shitalakshya River, Meghna River, Tentulia River, Arial Khan River and their tributaries
Positions Held: Environmental Specialist
Activities performed: Review existing data and conduct field surveys to establish biodiversity baseline, Evaluate potential impacts of dredging and other project activities on biodiversity, Develop plans to address biodiversity impacts, including habitat enhancement and protection, Implement monitoring protocols for biodiversity and water quality, Provide training to project staff and stakeholders on biodiversity conservation.
Project 16
Name of assignment or project: Environmental Impact Assessment (EIA) for the F/S With the D/D for Construction of DG/BG Line Parallel to the Existing MG Line and Conversion of Existing Mg Line into DG/BG in Santahar-Bogra-Kaunia-Lalmonirhat Section including Santahar Bypass
Duration (Month and Year): May 2024 to Continued
Client: JV of Oriental Consultants Global, EGIS, & HSS
Lender: Asian Development Bank
Location: Santahar-Bogra-Kaunia-Lalmonirhat
Main project features: Environmental Impact Assessment (EIA) including environmental baseline survey and
environmental quality monitoring, alternative analysis, public consultation, environmental management plan,
climate and disaster risk assessment
Positions Held: Environmental Specialist (Project Manager)
Activities performed: Coordination with the project proponent; Baseline survey (environment, social); conduct
Environmental and social impact assessment; mitigation and management plan; Conduct PCM; Preparation ADB
standard Report
Project 15
Name of assignment or project: Environmental and Social Impact Assessment (ESIA) for the Waste to Energy Power Project, Aminbazar, Savar, Bangladesh
Duration (Month and Year): April 2022 to October 2024
Client: China Machinery Engineering Corporation (CMEC), China
Lender: Asian Infrastructure Investment Bank (AIIB)
Location: Dhaka, Bangladesh
Main project features: EIA, ESIA, Best Technology Analysis (BAT), Environmental quality monitoring
Positions Held: Environmental Specialist
Activities performed: Coordination with the project proponent; Baseline survey (environment, social); conduct Environmental and social impact assessment; mitigation and management plan; Conduct PCM; Preparation AIIB standard Report
Project 14
Name of assignment or project: Environmental Impact Assessment (EIA) for the Waste to Energy Power Project, Aminbazar, Savar, Bangladesh
Duration (Month and Year): April 2022 to June 2023
Client: China Machinery Engineering Corporation (CMEC), China
Location: Dhaka, Bangladesh
Main project features: Environmental Impact Assessment (EIA) report, Environmental quality (Air, Noise, Soil and Sediment) monitoring
Positions Held: Environmental Specialist
Activities performed: Baseline survey (environment); conduct Environmental impact assessment; mitigation and management plan; Conduct PCM; Preparation DOE standard Report
Project 13
Name of assignment or project: Environmental Impact Assessment of Sreepur 150 (±10%) Mw HFO Based Power Plant At Barama, Barmi, Sreepur, Gazipur, Bangladesh
Duration (Month and Year): May 2018 to December 2019
Client: B-R Powegen Ltd. Lender: World Bank Location: Dhaka, Bangladesh
Main project features: EIA, ESIA, Environmental quality monitoring, PCM, ESMP
Positions Held: Environmental Specialist
Activities performed: Baseline survey (environment, social); conduct Environmental and social impact assessment; mitigation and management plan; Preparation World Bank standard Report
Project 12
Name of assignment or project: Construction Environmental Management Action Plan of OPBC Works of Development Dredging with maintenance and Aids to Navigation with installation along inland waterway Routes 12,13, 13a, 15 & 16, 17 and 21
Duration (Month and Year): December 2022 to October 2023
Client: Banga Dredger Limited, Dhaka
Lender: World Bank Location: Dhaka, Bangladesh
Main project features: Environmental monitoring, Identification of impacts, implantation of ESMP
Positions Held: Environmental Management Officer
Activities performed: Baseline data collection for environmental components such as air, noise, vibration, soil and sediment, Environmental data analysis based on monitoring data after receiving from laboratory, Impact assessment and management plan for specific environmental issues like air, water, noise, waste, occupational health safety etc.
Project 11
Name of assignment or project: Environment Impact Assessment (EIA) for RUPSHA- KHULNA 230 kV Double Circuit Transmission Line on Turnkey Basis
Duration (Month and Year): November 2021 to March 2022
Client: Larsen & Toubro Limited
Lender: Asian Development Bank (ADB)
Location: Khulna
Main project features Baseline survey (environment, social); conduct Environmental and social impact assessment; mitigation and management plan
Positions Held: Environmental Expert
Activities performed: Updating relevant legislation and standards from the Government of Bangladesh and ADB, collecting environmental and socio-economic baseline data, consulting with stakeholders, identifying and evaluating potential project impacts across all phases, developing an Environmental and Social Management Plan
(ESMP) for mitigation and preparing EIA reports.
Project 10
Name of assignment or project: Environmental Action Plan and Others: South Asia Sub Regional Economic Cooperation (SASEC) Road Connectivity Project; Improvement of Road from Kaliakoir Bypass Intersection (km 18+900) to Dullamari Road (km 36+900) from 2-Lane to 4-Lane
Duration (Month and Year): March 2021 to November 2023
Client: CPC-TANTIA JV
Location: Sherpur, Bogra
Lender: Asian Development Bank (ADB)
Main project features: Environmental and Social Monitoring, Occupational health safety, Community health safety
Positions Held: Environmental Management Officer (EMO)
Activities performed: Environmental monitoring to assess project impacts during construction phase, compliance with regulatory and ADB standards, and ensures the effectiveness of mitigation measures. Regular reports preparation to track progress and suggest improvements.
Project 9
Name of assignment or project: Environmental and Social monitoring in operation phase for Sirajganj combined cycle dual fuel power plant (Unit 2 and Unit 3)
Duration (Month and Year): July 2021 to October 2023
Client: NWPGCL
Location: Sirajganj, Bangladesh
Main project features: Environmental, health and safety; Environmental quality monitoring
Positions Held: Environmental, Health and Safety Expert
Activities performed: Environmental quality monitoring, EHS, and report writing
Project 8
Name of assignment or project: Environmental Impact Assessment (EIA) and Economic Feasibility Study (EFS) (Package No: FS/17-18/EE-III) under the project "Feasibility Study for Important Bridge Construction on Rural Roads"
Duration (Month and Year): December 2017-March 2019
Client: Local Government Engineering Department (LGED)
Location: Faridpur, Kushtia, Madaripur, Narail, Pirojpur, Rajbari, Sunamganj, Sylhet
Main project features: EIA study
Positions Held: Environmentalist
Activities performed: EIA including impact identification and mitigation measures, Baseline monitoring, PCM, EMP
Project 7
Name of assignment or project: Bangabandhu Sheikh Mujib Railway Bridge Construction Project (BSMRBC)
Duration (Month and Year): February 2021 to December 2022
Client: OTJ-SMCC JV
Lender: Japan International Cooperation Agency (JICA) Location: Tangail, Sirajganj
Main project features: EMAP, CEMP, ESMP, EHS, Baseline monitoring, Monthly, quarterly, Annual environmental and health, safety monitoring
Positions Held: Environmental Expert as Sub-consultant
Activities performed: Ensure the implementation of EMAP, Prepare monthly, quarterly, annual environmental report, To ensure environmental qualitative and quantitative survey, Keep updated with local and international environmental regulation, Review and recommend improvements to environmental programs for compliance assurance, Provide guidance and direction to management and project sites for ensuring environmental
compliance., Oversee waste disposal and pollution control programs
Project 6
Name of assignment or project: Development of Environment Management Plan (EMP) and obtain the approval ' of LPG bottling plant of Index Power and Energy Limited at Mongla, Khulna, Bangladesh.
Duration (Month and Year): December 2017 to July 2018
Client: BEXIMCO
Location: Mongla
Main project features: Environmental Management plan study
Positions Held: Environmental Specialist
Activities performed: Baseline survey (environment, social), EMP study, Hazard and risk analysis
Project 5
Name of assignment or project: Western Bangladesh Bridge Improvement Project PW-03, Khulna Zone
Duration (Month and Year): March 2018 to August 2019
Client: Monico Limited
Lender: Japan International Cooperation Agency (JICA) Location: Jessore, Khulna, Jhinaidah, Narail, Bagerhat, Mongla
Main project features: Environment, Health and Safety (EHS) and Implementation of Environmental Management Action Plan during construction phase
Positions Held: Environmental Management Officer
Activities performed: Monthly monitoring in every construction site, Environment, health, safety inspection,
Preparing Environmental management and mitigation plan, Preparing EHS plan, Air, noise, water sample collection, EHS training to project workers
Project 4
Name of assignment or project: Off-Site Emergency Response Plan for Sirajganj Power Plant (Unit- 2 & Unit- 3)
Duration (Month and Year): February 2018 to March 2018 Client: Northwest Power Generation Company (NWPGCL) Location: Sirajganj
Main project features: Emergency Response Plan (ERP) study
Positions Held: ERP Expert
Activities performed: Baseline survey, Hazard and risk assessment Preparing Hazard and risk mitigation and management plan, Preparing emergency response plan, Coordination with proponent
Project 3
Name of assignment or project: IEE Assessment for Stimulating Urban Norms for Rigorous Improvement in Sanitation Environment (SUNRISE) in Bangladesh
Duration (Month and Year): Mar 2017 – June 2017
Client: Mott. Macdonald
Location: Dhaka
Main project features: IEE Assessment Report preparation of maximum 16 sites for construction of Public Toilets
Positions Held: Environmental Expert
Activities performed: Environmental and social baseline survey, Preparation of IEE report
Project 2
Name of assignment or project: Environmental Impact Assessment (EIA) of Water Supply Project by using treatment of Surface Water in Comilla City Corporation; under project of Consulting Services for Governance and Infrastructure Improvement (GII) under City Governance Project (CGP)
Duration (Month and Year): Apr 2017 - Aug 2017 Client: Local Government Engineering Department Location: Cummilla
Main project features: EIA Study
Positions Held: Environmental Specialist
Activities performed: Update relevant policy, regulation, act, framework etc., Mobilize field survey and lead field level task for this project, Supervise field work (Sample collection, survey), Conduct FGD, KII, Public consultation, GIS Map preparation, EIA Report writing
Project 1
Name of assignment or project: Use and Effectiveness of Effluent Treatment Plant (ETP) in the Garments Industry of Bangladesh: from a Water Sector Integrity Perspective
Duration (Month and Year): Nov 2016 - Mar 2017
Client: Transparency International Bangladesh
Location: Savar, Narayanganj and Gazipur
Main project features:
Positions Held: Jr. Environmental Specialist
Activities performed: Update relevant policy, regulation, act, framework etc, GIS Map preparation, Assist in Report writing