Design Group 1
Design on and off ramps
Creation of profile
Plans for vertical alignment
Design Group 2
Design Group 3
Technical Group
Synchro for designs: L10 and L13
Design Group 1
Cross-sections, vertical alignment, and proposed dtm
Construction sign plans and traffic handling
Creation of vertical alignment, linear interpolar and vertical clearance calculations
Design Group 2
Redesign of ramps review
Completion of vertical alignment
Design Group 3
Changes to horizontal alignment
Plans for profiles and vertical alignment
Generation of cross sections for each road
Plan requirements for traffic signs
Plans for proposed dtm and superelevation of each road
Technical Group
Synchro for design: L10
Design Group 1
Technical Group
Volume calculations for on and off ramps
Recording VisSim simulations
Finalization of the current design (master copy)
Driving behavior alterations
Ran VisSim simulations for GEH calculations
Trouble shooting issues
Design Group 1
Design Group 2
Water pollution plan, ramp metering, traffic signal
Design Group 3
Changes to construction area signs
Plans for temporary water pollution control and traffic handling plans
Technical Group
Re-calculation of on and off ramp volumes
Ran VisSim simulations for GEH calculations
Trouble shooting issues
Design Group 3
Changes to traffic handling plans
Discuss traffic signal plans and ramp metering
Design Group 1
Vertical alignment and proposed dtm
Adjustments to traffic handling plans
Temporary water pollution control plan
Design Group 2
Cross sections, adjustments to vertical alignment
Finished construction sign plans
Technical Group
PEMS data collection and peak hour selection for VisSim