Work Experience
Work Experience
HS2 North CAT3 Checks, June 2023 –March 2024
Cat III check of 2 cell box type siphon structure having structure name as Fulfen Wood Siphon using European standard.
CAFA LNW Anglia Route, Nov 2020 – Oct 2022
Cat II check of Level 2 assessment with Non-linear Finite Element Analysis for Talbot Road Underbridge. The structure consists of 3 nos of plate girder as semi through type straight underline bridge having two railway tracks.
Cat II check of Level 2 assessment with Non-linear Finite Element Analysis for FB 24B/Woburn footbridge. The structure consists of metallic U type footbridge.
Cat II check of Level 2 assessment with Non-linear Finite Element Analysis for Middle Fen Drain Underbridge. The structure consists of 2 nos of plate girder as semi through type skewed underline bridge having single railway track.
CAT I check of Level 1 assessment along with CAT II check of Level 2 assessment with Non-linear Finite Element Analysis for Little Ouse railway underbridge. The structure consists of 3 nos of plate girder as semi through type skewed underline bridge having single railway track on each deck.
CAFA LNW CP6 Package (2019-2020)
Cat II check of Level 2 assessment with Non-linear Finite Element Analysis for CMD2/85A of Package H1, J1, K1 with Network Rail. The structure consists of 2 nos of plate girder as semi through type skewed underline bridge having single track.
Level 2 assessment with Non-linear Finite Element Analysis and preparation of assessment report for CBC3/87 of Package H1, J1, K1 with Network Rail. The structure consists of 3 nos of plate girder as semi through type straight underline bridge having two nos of tracks.
3 nos of Level 1 assessments of Railway Underbridge comprise metallic half through type girders.
Eastern DFCC (Package 202), 2015/12 to 2018/04
Responsible for analysis and detailed design of through type truss superstructure for Important Bridge over River Yamuna of 1.034 km overall span (17 nos.@60.83m) & Railway flyover (1 no. @47.24m) and involved in preparation of fabrication drawings. https://www.youtube.com/watch?v=JfxreBSzvQE
I was involved in detailed design of steel composite girder of semi through type & deck type of different span arrangements of Mild steel section.
Responsible for detailed design of single cell prestressed box girder of various span arrangements for 32.5T axle load of Freight Corridor.
I was involved in design of Well Foundation, Caisson of well, Circular pier with Pile foundation. I was also involved in preparation of Construction Reference Drawings.
Khulna-Mongla Port Railway Line, 2017/07 to 2018/04 (Bangladesh)
Responsible for analysis and detailed design of through type truss bridge superstructure for 103.5m span for 25T railway axle loading.
Responsible for design of steel composite girder of different spans, design of semi through type steel girder of different of Mild steel section for 25T axle load. I was also involved in preparation of Construction Reference Drawings. Project Overall Schematic Video
Elevated Metro Viaduct of Nagpur (MMRCL) of Length 6.836km, 2017/07 to 2018/02
Responsible for analysis and design of single cell Prestressed box girder for load of Passenger Metro
Prestressed Pier-arm for Viaduct location and for Station location. Also involved in preparation of detail Construction Reference Drawings.
Elevated Metro Viaduct connecting Elevated Section of East West Corridor of Kolkata Metro Package EWE – 2R1 (KMRCL), 2015/12 to 2016/08
Responsible for checking the design of 3-span continuous 2-cell Steel Composite Tub-box girder with different radius for 17T axle load of Passenger Metro. I was also involved in preparation of Construction Reference Drawings.
Sparke Evans Footbridge Assessment, January 2024 – June 2025
Preparation of 3D frame model for 70m span cable suspension footbridge having saddle type arrangement at pylon top for assessment.
Non-linear cable tuning analysis.
Assessment of all bridge elements for temporary condition during repair works for Stage 1 & Stage 2 loading for temporary structures.
Repair Scheme Preparation of Harlington High Street Bridge, May 2023 – Present
Preparation of interpretative report of Harlington High Street bridge based of factual concrete testing report and proposing repair options. Presenting the scheme to CPS during Gateway C.
Preparation of repair design and contract drawings for the bridge.
Preparation of Outline Assessment of Half-joint for the safety in as built condition as well as during repair stage.
Project planning, fee estimate preparation, resource mobilization, technical & quality review of analysis and assessment of the main span and half joint done by Engineers, dealing with client, contractor, CAT III checker and overall project management of CAT III Assessment of the bridge.
Strengthening and Rehabilitation of 2nd Hooghly Bridge, November 2022 - April 2023
Non-linear analysis of existing steel composite Cable-stayed bridge using SOFiSTiK CADiNP.
Analysis by preparing of construction stages in SOFiSTiK for bearing replacement works.
Analysis by preparing of construction stages in SOFiSTiK for cable replacement works. https://www.youtube.com/watch?v=RZ3hLVu4w50
SNWRR-Shelton Rough River Severn Viaduct, August 2023 – August 2024
Preparation of 3D grillage model for 10 span continuous steel composite bridge in MIDAS and performing live load analysis using EN code.
Structural review of existing hybrid model prepared in LUSAS.
Preparation of Load cases for LUSAS by converting critical live load scenarios (350 cases) from MIDAS through digital automation using Python coding.
Assessment of Oatland Lane Bridge – CAT III Assessment, March 2021 - May 2024
Assessment consists of 4 nos of single span prestressed pre-tensioned box beam associated with post tensioned U-beam superstructure and the 4-column pier in as built condition as well as for defected sections.
3D linear elastic global model considering substructure as well as superstructure has been done in MIDAS for doing the analysis.
Assessment of Sopors Ramp OB – CAT2 Assessment, March 2021 – August 2021
Assessment consists of 4 nos of single span steel semi-through type beams having XG and transverse troughing in as built condition.
Preparation of defect drawing as per site inspection data.
Bearing Replacement of Curridge Turn Bridge – CAT1 Check, Dec 2020 – May 2021
Checking of load calculation, LUSAS model and load data for jacking condition as well as for service condition.
Checking of newly designed bearing plinth and drawings prepared.
Brent Cross Station FB – Eastern & Western FB Cat II check, August 2020 - Sept 2020
Cat II check of detailed design using EUROCODES for Eastern and Western span for superstructure, substructure of the new footbridge. Superstructure consists of Single span steel warren truss of steel; substructure consists of RC pier cap with two nos of pier column above pile foundation.
Dynamic Vibration Analysis of the superstructure to find the natural frequency and Comfort criteria for pedestrian load.
A34 Perry Barr - Birchfield Island Cat II check, April 2020 - June 2020
Cat II check of detailed design using EUROCODES for Single span integral PSC bridge superstructure, substructure and foundation of the new bridge. Superstructure consists of prestressed precast girders with infill concrete, substructure consists of precast leaf abutments placed above foundation pad.
Checking of general arrangement and reinforcement detailing drawings for the new bridge.
Checking of Structural Risk register for the new bridge.
Bradford - Queens Road Bridge Feasibility Study, July 2020
Feasibility option study for a single span of Queens Road Bridge with steel composite type, prestressed girder with composite deck type and reinforced concrete portal frame type option with estimated cost for feasibility of the structure with newly proposed deck arrangement.
CAFA LNW CP6 Package (2019-2020)
Cat II check of Level 2 assessment with Non-linear Finite Element Analysis of plate girder half through type, Horley Footbridge on Sussex route.
Level 0.5 and Level 1 assessments of footbridge, overbridge comprises reinforced saddle, prestressed girder.
DPR of 346 km of State Highway of Uttarakhand (USHIP), May 2018 to September 2018
Responsible for Preliminary design of Truss type Superstructure with 7.5m carriage way. I was also involved in performing inventory and preparing structure list along with preparation of Inception Report of existing structures which includes 2 nos. Major Bridges, 34 nos. of Minor Bridges, 2070 nos. of culverts.
DDC of 4 Laning Moran Bypass of NH-37 in Assam, Phase A, May 2017 to November 2017
Responsible for analysis and design of Precast PSC I Girder with cast in situ deck of different span arrangements, involved in preparation of good for construction drawings.
DDC of Proposed Major Bridge over River Fulahar, Malda, WB, 2016/07 to 2017/02
Responsible for analysis and design of Precast RCC T Girder (span 20m) with cast in situ deck slab, design of elastomeric bearing, involved in preparation of detailed drawings, Checking the suitability of already designed PSC girders (span 40m) for erection scheme.
— iCRC Brown Bag Session
“CAFA Level 2 Assessments – Workshop 1 & 2” July 2021
“AUTODESK SBD Software Basic Training Session 1” Nov 2021
“CAFA Level 2 Assessments – Advance Analysis Controls for NLFEA in LUSAS” Sept 2023
— UK CBE Technical Webinar
“Secondment at sbp (Germany) on the 2nd Hooghly Bridge Strengthening” December 2023
— iCRC Quality Management
“BMS Refresher Session for All on Quality Assurance of Project Folders” October 2024
“BMS Refresher Session for All on Quality Assurance of Project Folders” October 2025