Slabs are built on site using desired measurements to create the form work. Ideal reinforcement methods are identified (attached to existing structure or not) then rebar and/or wire mesh is positioned. Concrete is then poured , positioned and floated. Then a non slip finish is applied with a concrete broom and rounded edges are created. Depending on the weather it will be ready to support traffic in 48 hours.