A bathroom renovation follows a predictable sequence. Plumbing shows up at several stages. Here is how it typically flows.
1. Planning
Choose fixtures early: toilet, vanity, faucet, shower valve, tub. Each has rough-in requirements that shape the plan.
2. Permits
Many plumbing changes need a permit. Apply before work begins.
3. Demolition
Old fixtures, tile and drywall come out. The plumber checks existing pipes, valves and drains for problems.
4. Rough-in
New drain, vent and supply lines are installed. Shower and tub valves are set at the right depth and height.
5. Inspection
The rough-in is inspected before walls are closed.
6. Waterproofing and tile
Other trades install backer board, waterproofing and tile. The plumber may return to set a shower drain or tub.
7. Finish plumbing
Toilet, vanity, faucets and shower trim are installed.
8. Testing
Every fixture is tested for leaks and proper operation.
9. Final inspection
If required.
Timing tips
• Order fixtures early to avoid delays
• Do not close walls before inspection
• Keep the valve plaster guards on until tiling is done
Learn more about rough-in plumbing.