C.1. Approved building plan, showing the location of the different buildings in the campus
C.2. Evidence that electrical lines are safely installed and periodically checked
C.3. Schedule of water potability testing and pest control inspection
C.4. PDF of the janitorial staff, including work schedule
AREAS UNDER SURVEY
AREA I
AREA VI
AREA II
AREA VII
AREA III
AREA VIII
AREA IV
AREA IX
AREA V
AREA X
Back to BPA
Home