產業發表
王逸琦. 品質在工程內製造出來 - 鍠龍機械對於改善的堅持. 臺灣機械工業同業公會機械資訊月刊 803期.
王逸琦. 百盛鐵氟龍追求企業的幸福競爭力 推動TPS營造持續改善的製造現場. 臺灣機械工業同業公會機械資訊月刊 801期.
王逸琦. 數位先行 精實在後 倢鋒科技TPS的實踐. 臺灣機械工業同業公會機械資訊月刊 798期.
王逸琦. 企業推動TPS精實管理的起手式: 回歸Toyota Way. 臺灣機械工業同業公會機械資訊月刊 792期.
王逸琦. 落實生產現場管理的基礎 華嶸精機推動TPS精實管理的起手式. 臺灣機械工業同業公會機械資訊月刊 787期.
王逸琦,片山博,陳亭志 . 不一樣的智慧製造之路-からくり改善 . 臺灣機械工業同業公會機械資訊月刊 772期.
Journal and Special Issue Editorship
1. Co-editor of the special issue of International Journal of Lean Six Sigma on "See Green: Achieving Environmental Sustainability Through Lean and Six Sigma", 2017, 8(1), jointly with Jose Arturo Garza-Reyes (U.K.), Vikas Kumar (U.K.), and F. Frank Chen (U.S.A.)
2. Co-editor of the special issue of International Journal of Technology Management on "Competitiveness Assessment and Enhancement in Virtual Organizations", 2016, 70(1), jointly with Toly Chen (Taiwan)
3. Co-editor of the special issue of Journal of Applied Mathematics on "Fuzzy Nonlinear Programming with Applications in Decision Making", 2014, jointly with Toly Chen (Taiwan), Deng-Feng Li (China) and Warren Liao (U.S.A.)
4. Co-editor of the special issue of Flexible Services and Manufacturing on "Semiconductor Manufacturing", 2013, 25(3), jointly with F. Frank Chen (U.S.A.) and Chen-Fu Chien (Taiwan).
5. Co-ediitor of the special issue of Robotics and Computer-Integrated Manufacturing on "The 21st International Conference on Flexible Automation and Intelligent Manufacturing", 2013, 29(3), jointly with F. Frank Chen (U.S.A.)
6. Associate Editor of the Journal "International Journal of Lean Enterprise Research" Published by Inderscience Publisher (Since 2012)
7. Associate Editor of the Journal "International Journal of Fuzzy System Application" Published by IGI Global (2010-2014)
Referred Journal Articles
Wang, Y.-C., Chiu, M.-C., and Chen, T., (2020), "A fuzzy nonlinear programming approach for planning energy-efficient wafer fabrication factories," Applied Soft Computing, 95. on-line published. (SCI)
Chen, T. and Wang, Y.-C., (2019), "An incremental learning and integer-nonlinear programming approach to mining users’ unknown preferences for ubiquitous hotel recommendation," Journal of Ambient Intelligence and Humanized Computing, 10(7), 2771-2780. (SCI)
Wang, Y.-C., Kim, D.-W., Katayama, H., Hsueh, W.-C., (2018), "Optimal Machining Economics and Energy Consumption for Face Milling Operations," International Journal of Advanced Manufacturing Technology, 99(9-12), 2093-2100. (SCI, EI)
Chen, T., Wang, Y.-C., and Lin, Z., (2017), "Predictive Distant Operation and Virtual Control of Computer Numerical Control Machines," Journal of Intelligent Manufacturing, 28(5), 1061-1077. (SCI, EI)
Chen, T. and Wang, Y.-C., (2017), "A Nonlinear Normalized Back Propagation Network and Cloud Computing Approach for Determining Cycle Time Allowance During Wafer Fabrication," Robotics and Computer-Integrated Manufacturing, 45, 144-156. (SCI, EI).
Wang, Y.-C., Wang, M.-J., and Lin, S.-C., (2017), "Selection of Cutting Conditions for Power Constrained Parallel Machine Scheduling," Robotics and Computer-Integrated Manufacturing, 43, 105-110. (SCI, EI).
Wang, Y.-C., Chen, T., Chiang, H., and Pan, W.-C. (2016), "A Simulation Analysis of Part Launching and Order Collection Decisions for a Flexible Manufacturing System," Simulation Modeling Practice and Theory, 69, 80-91. (SCI, EI)
Chen, T. and Wang, Y.-C. (2014), "An Agent-based Fuzzy Collaborative Intelligence Approach for Precision and Accurate Semiconductor Yield Forecasting," IEEE Transaction on Fuzzy Systems, 22(1), 201-211. (SCI, EI)
Wang, Y.-C., Wu, C.-W., and Chen, T. (2013), "A Fuzzy and Neural Approach for Optimizing the Performance of Job Dispatching in a Wafer Fabrication Factory," International Journal of Advanced Manufacturing Technology, 67(1-4), 289-202. (SCI, EI)
Wang, Y.-C., Chen, T., and Lin, C.-W., (2013), "Slack-Diversifying Nonlinear Fluctuation Smoothing Rule for Job Dispatching in a Wafer Fabrication Factory," Robotics and Computer-Integrated Manufacturing, 29(3), 41-47. (SCI, EI).
Wang, I-L., Wang, Y.-C., and Chen, C.-W., (2013), "Scheduling Unrelated Parallel Machines in a Semiconductor Manufacturing by Problem Reduction and Local Search Heuristics," Flexible Services and Manufacturing, 25(3), 343-366. (SCI, EI)
Chen, T., Lin, C.-W., and Wang, Y.-C., (2013), "A Fuzzy Collaborative Forecasting Approach for WIP Level Estimation in a Wafer Fabrication Factory," Applied Mathematics and Information Sciences, 7(4), 1461-1466. (SCI )
Chen, T. and Wang, Y.-C., (2011), "A Fuzzy-Neural Approach for Global CO2 Concentration Forecasting," Intelligent Data Analysis, 15(5), 763-777. (SCI)
Wang, Y.-C., Chiu, Y.-C., and Hung, Y.-P, (2011), "Optimization of Multi-task Turning Operations under Minimum Tool Waste Consideration," Robotics and Computer-Integrated Manufacturing, 27(4), 674-680. (SCI, EI)
Chen, T. and Wang, Y.-C., (2011), "A Hybrid Fuzzy and Neural Approach for Forecasting the Book-to Bill Ratio in the Semiconductor Manufacturing Industry," International Journal of Advanced Manufacturing Technology, 54(1-4), 377-389 (SCI, EI)
Chen, T., Wang, Y.-C., and Lin, Y.-C., (2010), "A Fuzzy-Neural System for Scheduling a Wafer Fabrication Factory," International Journal of Innovative Computing, Information and Control, 6(2), 687-700. (SCI, EI)
Jeang, A., Li, H.-C., and Wang, Y.-C., (2010), "A Computational Simulation Approach for Optimising Process Parameters in Cutting Operations," International Journal of Computer Integrated Manufacturing, 23(4), 325-340. (SCI, EI)
Chen, T. and Wang, Y.-C., (2010), "A Bi-Criteria Nonlinear Fluctuation Smoothing Rule Incorporating the SOM-FBPN Remaining Cycle Time Estimator for Scheduling a Wafer Fab - A Simulation Study," International Journal of Advanced Manufacturing Technology, 49(5-8), 709-721. (SCI, EI)
Chen, T. and Wang, Y.-C., (2010), "Incorporating the FCM-BPN Approach with Nonlinear Programming for Internal Due Date Assignment in a Wafer Fabrication Plant," Robotics and Computer-Integrated Manufacturing, 26(1), 83-91. (SCI, EI)
Chen, T. and Wang, Y.-C., (2010), "An Evolving Hybrid Neural Approach for Predicting Job Completion Time in a Semiconductor Fabrication Plant," European Journal of Industrial Engineering, 4(3), 336-353. (SCI, EI)
Chen, T. and Wang, Y.-C., (2009), "A Non-linear Scheduling Rule Incorporating Fuzzy-Neural Remaining Cycle Time Estimator for Scheduling a Semiconductor Manufacturing Factory," International Journal of Advanced Manufacturing Technology, 45(1-2), 110-121. (SCI, EI)
Chou, C.-H., Wang, Y.-C., Tsai, H.-J, Lin, K.-J., Lai, J.-M., and Chen, T.-H., (2009), "Evaluating and Modeling the Flow Line and Operations of a Real Swine Abattoir in Central Taiwan: a Simulation Study," Taiwan Veterinary Journal, 35(3), 209-216. (in Chinese)
Chen, T., Wu, H.-C., and Wang, Y.-C., (2009), "Fuzzy-neural Approaches with Example Post-Classification for Estimating Job Cycle Time in a Wafer Fab," Applied Soft Computing, 9(4), 1225-1231. (SCI, EI)
Chen, T., Wang, Y.-C., and Tsai, H.-R., (2009), "Lot Cycle Time Prediction in a Ramping-up Semiconductor Manufacturing Factory with a SOM-FBPN-ensemble Approach with Multiple Buckets and Partial Normalization," International Journal of Advanced Manufacturing Technology, 42(11-12), 1206-1216. (SCI, EI)
Chen, T., Wang, Y.-C., and Wu, H.-C., (2009), "A Fuzzy-Neural Approach for Remaining Cycle Time Estimation in a Semiconductor Manufacturing Factory - A Simulation Study," International Journal of Innovative Computing, Information and Control, 5(8), 2125-2139. (SCI, EI)
Chen, T. and Wang, Y.-C., (2009), "A Fuzzy Set Approach for Evaluating and Enhancing the Mid-term Competitiveness of a Semiconductor Factory," Fuzzy Sets and Systems., 160(5), 569-585. (SCI, EI)
Wang, Y.-C. and Chen, T., (2008), "Modeling and Optimization of Machining Conditions for the Multi-pass Dry Turning Process," Proceedings of Institution of Mechanical Engineers, Part B, Journal of Engineering Manufacture, 222(11), 1381-1394. (SCI, EI)
Wang, Y.-C., (2008), "Evaluating Flexibility on Order Quantity and Delivery Lead Time for a Supply Chain System," International Journal of Systems Science, 39(12), 1193-1202. (SCI, EI)
Wang, Y.-C., Chen, T., and Li, K.-T., (2008), "Enhancing the Mid-term Competitiveness of a Semiconductor Manufacturing Factory through Collaborative Yield Learning Planning, Materials Science Forum, 594, 475-480. (EI)
Chen, T., Wang, Y.-C., Lin, Y.-C., and Yang, K.-S., (2008), "Estimating Job Cycle Time in Semiconductor Manufacturing with an ANN Approach Equally Dividing and Post-classifying Jobs," Materials Science Forum, 594, 469-474. (EI)
Wang, Y.-C. and Cheng, W.-T., (2008), "A Sensitivity Analysis of Solving Joint Replenishment Problems using the RAND Method under Inaccurate Holding Cost Estimates and Demand Forecasts," Computers & Industrial Engineering, 55(1), 243-252. (SCI, EI)
Chen, T., Jeang, A., and Wang, Y.-C., (2008), "A Hybrid Neural Network and Selective Allowance Approach for Internal Due Date Assignment in a Wafer Fabrication Plant," International Journal of Advanced Manufacturing Technology, 36(5-6), 570-581. (SCI, EI)
Chen, T. and Wang, Y.-C., (2008), "A Hybrid Intelligent Approach for Output Projection in a Semiconductor Fabrication Plant, Intelligent Data Analysis, 12(1), 129-144. (SCI)
Wang, Y.-C., (2007) "A Note on 'Optimization of Multi-pass Turning Operations using Ant Colony System'," International Journal of Machine Tools and Manufacture, 47(12-13), 2057-2059. (SCI, EI)
Wang, Y.-C. and Usher, J. M., (2007) "A Reinforcement Learning Approach for Developing Routing Policies in a Multi-Agent Production Scheduling," International Journal of Advanced Manufacturing Technology, 33(3-4), 323-333. (SCI, EI).
Chen, T. and Wang, Y.-C., (2007) "A Fuzzy-neural System with Error Feed-back to Adjust Classification for Forecasting Wafer Lot Flow Time - A simulation Study," Proceedings of Institution of Mechanical Engineers, Part I, Journal of Systems and Control Engineering, 221(5), 807-817. (SCI, EI)
Wang, Y.-C. and Usher, J. M., (2005) "Application of Reinforcement Learning for Agent-Based Production Scheduling," Engineering Applications of Artificial Intelligence, 18(1), 73-82 (SCI, EI).
Wang, Y.-C. and Usher, J. M., (2004) "Learning Policies for Single Machine Job Dispatching," Robotics and Computer Integrated Manufacturing, 20(6), 553-562. (SCI, EI).
Referred International Conference Articles
1. Kwan, K. W., Chan, S. H. G., Chiang, C.-C., and Wang, Y.-C. (2023), "Making Flow in Machining and Non-Machining Processes with Leveling and Small Lot Sizing : a Kaizen Case Study," Lecture Notes in Mechanical Engineer, 136-144. (The 32nd International Conference on Flexible Automation and Intelligent Manufacturing, Porto, Portugal, June, 2023)
2. Wang, Y.-C. and Chen, T. (2019), "An FNLP Approach for Planning Energy-efficient Manufacturing: Wafer Fabrication as an Example," Procedia Manufacturing, 38, 439-446. (The 29th International Conference on Flexible Automation and Intelligent Manufacturing, Limerick, Ireland, June, 2019)
3. Wang, Y.-C., and Chen, T., (2018), "A Direct-Solution Fuzzy Collaborative Intelligence Approach for Yield Forecasting in Semiconductor Manufacturing," Procedia Manufacturing, 17, 110-117. (The 28th International Conference on Flexible Automation and Intelligent Manufacturing, Columbus, Ohio, June, 2018 )
4. Wang, Y.-C., Chen, T., and Wang, L.-C., (2017), "Simulating a Semiconductor Packaging Facility: Sustainable Strategies and Short-time Evidences," Procedia Manufacturing, 11, 787-795. (The 27th International Conference on Flexible Automation and Intelligent Manufacturing, Modena, Italy, June, 2017)
5. Wang, Y.-C., Kim, D.-W., Katayama, H., Hsueh, W.-C., "Optimal Machining Economics and Energy Consumption for Face Milling Operations," Proceedings of the 26th International Conference on Flexible Automation & Intelligent Manufacturing, Seoul, South Korea, June, 2016.
6. Cuka, B., Kim, D.-W., Wang, Y.-C., Cho, M., and Cho, G., "Machined Surface Roughness Evaluation by Image Processing," Proceedings of the 26th International Conference on Flexible Automation & Intelligent Manufacturing, Seoul, South Korea, June, 2016.
7. Cuka, B., Kim, D.-W., Heo, E.-Y. and Wang, Y.-C., "Multi-Sensor Tool Condition Monitoring based on Fuzzy Logic," Proceedings of the 25th International Conference on Flexible Automation & Intelligent Manufacturing, Wolverhampton, U.K., June, 2015.
8. Katayama, H., Lin, J.-C., and Wang, Y.-C., "On Development of Karakuri Contrivance for Green-lean Production- Through Manual Work Evaluation by Operations Experts with AHP Logic," Proceedings of the 25th International Conference on Flexible Automation & Intelligent Manufacturing, Wolverhampton, U.K., June, 2015.
9. Wang, Y.-C., Wang, M.-C., and Lin, S.-C., "Optimization of Cutting Parameters for Parallel Machine Scheduling with Constrained Power Demand Peak," Proceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing, San Antonio, U.S.A., May, 2014.
10. Wang, Y.-C., Chen, T., and Chuang, F.-C., "A Simulation Study on Assemble-to-Order Production for a Machine Tools Manufacturer," Proceedings of the 23rd International Conference on Flexible Automation & Intelligent Manufacturing, Porto, Portugal, June, 2013.
11. Wang, Y.-C., Chen, T., Pan, H.-C., and Chuang, F.-C., "Simulation Analysis of Part Launch and Order Collection Decisions for a Flexible Manufacturing System," Proceedings of the 22nd International Conference on Flexible Automation & Intelligent Manufacturing, Helsinki, Finland, June, 2012.
12. Wang, Y.-C., Chen, T., and Lin, C.-W., "A Slack-Diversifying Nonlinear Fluctuation Smoothing Rule for Job Dispatching in a Wafer Fabrication Factory," The 21st International Conference on Flexible Automation & Intelligent Manufacturing, Taichung, Taiwan, June, 2011.
13. Wang, Y.-C., Chiu, Y.-C., and Hung, Y.-P., "Optimization of Multi-Task Turning Operation under Minimal Tool Waste Consideration," The 20th International Conference on Flexible Automation & Intelligent Manufacturing, Oakland, CA, July, 2010.
14. Wang, Y.-C., Wang, Y., and Chang, S.-C., "Order Commitment Contracts in a Collaborative Supply Chain," International Symposium on Scheduling 2009, Nagoya, Japan, July, 2009.
15. Wang, Y.-C. and Li, W.-J., "Joint Replenishment and Supplier Selection using Particle Swarm Optimization," The 19th International Conference on Flexible Automation & Intelligent Manufacturing, Middlesbrough, UK, July, 2009.
16. Wang, Y.-C. and Chiu, Y.-C., "An Evolutionary Strategy for Optimizing Multi-pass Turning Operation under Dry Machining Conditions," The 41th CIRP Conference on Manufacturing Systems, Tokyo, Japan, May, 2008.
17. Wang, Y.-C., "A Simulation Study of Measuring Supply Chain Performances under Unbalanced Retailer Demand Variability," IIE Annual Conference and Expo 2007, Nashville, TN, May, 2007.
18. Wang, Y.-C., Kuo, H.-W., and Cheng, W.-T., "A Study of Solving the Joint Replenishment Problem using the RAND Method under Uncertain Holding Cost," The 4th International Conference on Supply Chain Management & Information Systems, Taichung, Taiwan, July, 2006.
19. Wang, Y.-C. and Hung, C.-C., "Parallel Replenishment Policies between Collaborating Retailers," The 16th International Conference on Flexible Automation & Intelligent Manufacturing, Limerick, Ireland, June, 2006.
20. Wang, Y.-C. and Yen, K.-N., "Exploring and Evaluating Flexibilities of a Supply Chain," The 36th International Conference on Computers & Industrial Engineering, Taipei, Taiwan, June, 2006.
21. Wang, Y.-C. and Usher, J. M., “A Reinforcement Learning Approach for Developing Routing Policies in a Multi-Agent Production Scheduling,” The 13th Industrial Engineering Research Conference, Houston, TX, May, 2004.
22. Wang, Y.-C. and Usher, J. M., “Learning Policies for Single Machine Job Dispatching,” The 13th International Conference on Flexible Automation & Intelligent Manufacturing, Tampa, FL, June, 2003.
23. Wang, Y.-C. and Usher, J. M., “A Study of Reinforcement Learning Applied to Dynamic Single-Machine Job Dispatching,” The 6th International Engineering Design and Automation Conference, Maui, Hawaii, August, 2002.
24. Wang, Y.-C. and Usher, J. M., “An Agent-Based Approach for Flexible Routing in Dynamic Job Shop Scheduling,” The 11th Industrial Engineering Research Conference, Orlando, FL, May, 2002.
25. Usher, J. M. and Wang, Y.-C., “Judging the Values of Additional Information on the Performance of Intelligent Agents in Manufacturing Control,” Conference on Intelligent Systems in Design and Manufacturing II, SPIE, Boston, MA, November, 2000.
26. Usher, J. M. and Wang, Y.-C., “Negotiation Between Intelligent Agents for Manufacturing Control,” The 4th International Engineering Design and Automation Conference, Orlando, FL, August, 2000.
27. Usher. J. M. and Wang, Y.-C., “Intelligent Agent Architectures for Manufacturing Control,” The 9th Industrial Engineering Research Conference, Cleveland, OH, May, 2000.
FAIM2026
(Paris, France)
FAIM2025
(New York, U.S.A.)
FAIM2024
(Taichung, Taiwan)
FAIM2023
(Porto, Portugal)
FAIM2019
(Limerick, Ireland)
FAIM2018
(Columbus, U.S.A.)
FAIM2017
(Modena, Italy)
FAIM2016
(Seoul, South Korea)
FAIM2015
(Wolverhampton, U.K.)
FAIM2014
(San Antonio, U.S.A.)
FAIM2013
(Porto, Portugal)
FAIM2012
(Helsinki, Finland)
FAIM2011
(Taichung, Taiwan)
FAIM2010
(Oakland, U.S.A.)
FAIM2009
(Middlesbrough, U.K.)
FAIM2006
(Limerick, Ireland)
FAIM2003
(Tampa, U.S.A.)