產業發表

王逸琦. 品質在工程內製造出來 - 鍠龍機械對於改善的堅持. 臺灣機械工業同業公會機械資訊月刊 803期.

王逸琦. 百盛鐵氟龍追求企業的幸福競爭力  推動TPS營造持續改善的製造現場. 臺灣機械工業同業公會機械資訊月刊 801期.

王逸琦. 數位先行 精實在後 倢鋒科技TPS的實踐. 臺灣機械工業同業公會機械資訊月刊 798期.

王逸琦. 企業推動TPS精實管理的起手式: 回歸Toyota Way. 臺灣機械工業同業公會機械資訊月刊 792期.

王逸琦. 落實生產現場管理的基礎 華嶸精機推動TPS精實管理的起手式. 臺灣機械工業同業公會機械資訊月刊 787期.

王逸琦,片山博,陳亭志 .  不一樣的智慧製造之路-からくり改善 .   臺灣機械工業同業公會機械資訊月刊 772期.


Journal and Special Issue Editorship

1.  Co-editor of the special issue of International Journal of Lean Six Sigma on "See Green: Achieving Environmental Sustainability Through Lean and Six Sigma", 2017, 8(1), jointly with Jose Arturo Garza-Reyes (U.K.), Vikas Kumar (U.K.), and F. Frank Chen (U.S.A.)

2. Co-editor of the special issue of International Journal of Technology Management on "Competitiveness Assessment and Enhancement in Virtual Organizations", 2016, 70(1), jointly with Toly Chen (Taiwan)

3. Co-editor of the special issue of Journal of Applied Mathematics on "Fuzzy Nonlinear Programming with Applications in Decision Making", 2014, jointly with Toly Chen (Taiwan), Deng-Feng Li (China) and Warren Liao (U.S.A.)

4. Co-editor of the special issue of Flexible Services and Manufacturing on "Semiconductor Manufacturing", 2013, 25(3), jointly with F. Frank Chen (U.S.A.) and Chen-Fu Chien (Taiwan).

5. Co-ediitor of the special issue of Robotics and Computer-Integrated Manufacturing on "The 21st International Conference on Flexible Automation and Intelligent Manufacturing", 2013, 29(3), jointly with F. Frank Chen (U.S.A.)

6. Associate Editor of the Journal "International Journal of Lean Enterprise Research" Published by Inderscience Publisher (Since 2012) 

7. Associate Editor of the Journal "International Journal of Fuzzy System Application" Published by IGI Global (2010-2014)

 

Referred Journal Articles

 

Referred International Conference Articles

1. Kwan, K. W., Chan, S. H. G., Chiang, C.-C., and Wang, Y.-C. (2023), "Making Flow in Machining and Non-Machining Processes with Leveling  and Small Lot Sizing : a Kaizen Case Study," Lecture Notes in Mechanical Engineer, 136-144. (The 32nd International Conference on Flexible Automation and Intelligent Manufacturing, Porto, Portugal, June, 2023)

2. Wang, Y.-C. and Chen, T. (2019), "An FNLP Approach for Planning Energy-efficient Manufacturing: Wafer Fabrication as an Example," Procedia Manufacturing, 38, 439-446.  (The 29th International Conference on Flexible Automation and Intelligent Manufacturing, Limerick, Ireland, June, 2019)

3. Wang, Y.-C., and Chen, T., (2018), "A Direct-Solution Fuzzy Collaborative Intelligence Approach for Yield Forecasting in Semiconductor Manufacturing," Procedia Manufacturing, 17, 110-117. (The 28th International Conference on Flexible Automation and Intelligent Manufacturing, Columbus, Ohio, June, 2018 )

4. Wang, Y.-C., Chen, T., and Wang, L.-C., (2017), "Simulating a Semiconductor Packaging Facility: Sustainable Strategies and Short-time Evidences," Procedia Manufacturing, 11, 787-795. (The 27th International Conference on Flexible Automation and Intelligent Manufacturing, Modena, Italy, June, 2017)

5. Wang, Y.-C., Kim, D.-W., Katayama, H., Hsueh, W.-C., "Optimal Machining Economics and Energy Consumption for Face Milling Operations," Proceedings of the 26th International Conference on Flexible Automation & Intelligent Manufacturing, Seoul, South Korea, June, 2016.

6. Cuka, B., Kim, D.-W., Wang, Y.-C., Cho, M., and Cho, G., "Machined Surface Roughness Evaluation by Image Processing," Proceedings of the 26th International Conference on Flexible Automation & Intelligent Manufacturing, Seoul, South Korea, June, 2016.

7. Cuka, B., Kim, D.-W., Heo, E.-Y. and Wang, Y.-C., "Multi-Sensor Tool Condition Monitoring based on Fuzzy Logic," Proceedings of the 25th International Conference on Flexible Automation & Intelligent Manufacturing, Wolverhampton, U.K., June, 2015.

8. Katayama, H., Lin, J.-C., and Wang, Y.-C., "On Development of Karakuri Contrivance for Green-lean Production- Through Manual Work Evaluation by Operations Experts with AHP Logic," Proceedings of the 25th International Conference on Flexible Automation & Intelligent Manufacturing, Wolverhampton, U.K., June, 2015.

9. Wang, Y.-C., Wang, M.-C., and Lin, S.-C., "Optimization of Cutting Parameters for Parallel Machine Scheduling with Constrained Power Demand Peak," Proceedings of the 24th International Conference on Flexible Automation & Intelligent Manufacturing, San Antonio, U.S.A., May, 2014.

10. Wang, Y.-C., Chen, T., and Chuang, F.-C., "A Simulation Study on Assemble-to-Order Production for a Machine Tools Manufacturer," Proceedings of the 23rd International Conference on Flexible Automation & Intelligent Manufacturing, Porto, Portugal, June, 2013.

11. Wang, Y.-C., Chen, T., Pan, H.-C., and Chuang, F.-C., "Simulation Analysis of Part Launch and Order Collection Decisions for a Flexible Manufacturing System," Proceedings of the 22nd International Conference on Flexible Automation & Intelligent Manufacturing, Helsinki, Finland, June, 2012.

12. Wang, Y.-C., Chen, T., and Lin, C.-W., "A Slack-Diversifying Nonlinear Fluctuation Smoothing Rule for Job Dispatching in a Wafer Fabrication Factory," The 21st International Conference on Flexible Automation & Intelligent Manufacturing, Taichung, Taiwan, June, 2011.

13. Wang, Y.-C., Chiu, Y.-C., and Hung, Y.-P., "Optimization of Multi-Task Turning Operation under Minimal Tool Waste Consideration," The 20th International Conference on Flexible Automation & Intelligent Manufacturing, Oakland, CA, July, 2010.

14. Wang, Y.-C., Wang, Y., and Chang, S.-C., "Order Commitment Contracts in a Collaborative Supply Chain," International Symposium on Scheduling 2009, Nagoya, Japan, July, 2009.

15. Wang, Y.-C. and Li, W.-J., "Joint Replenishment and Supplier Selection using Particle Swarm Optimization," The 19th International Conference on Flexible Automation & Intelligent Manufacturing, Middlesbrough, UK, July, 2009.

16. Wang, Y.-C. and Chiu, Y.-C., "An Evolutionary Strategy for Optimizing Multi-pass Turning Operation under Dry Machining Conditions," The 41th CIRP Conference on Manufacturing Systems, Tokyo, Japan, May, 2008.

17. Wang, Y.-C., "A Simulation Study of Measuring Supply Chain Performances under Unbalanced Retailer Demand Variability," IIE Annual Conference and Expo 2007, Nashville, TN, May, 2007.

18. Wang, Y.-C., Kuo, H.-W., and Cheng, W.-T., "A Study of Solving the Joint Replenishment Problem using the RAND Method under Uncertain Holding Cost," The 4th International Conference on Supply Chain Management & Information Systems, Taichung, Taiwan, July, 2006.

19. Wang, Y.-C. and Hung, C.-C., "Parallel Replenishment Policies between Collaborating Retailers," The 16th International Conference on Flexible Automation & Intelligent Manufacturing, Limerick, Ireland, June, 2006.

20. Wang, Y.-C. and Yen, K.-N., "Exploring and Evaluating Flexibilities of a Supply Chain," The 36th International Conference on Computers & Industrial Engineering, Taipei, Taiwan, June, 2006.

21. Wang, Y.-C. and Usher, J. M., “A Reinforcement Learning Approach for Developing Routing Policies in a Multi-Agent Production Scheduling,” The 13th Industrial Engineering Research Conference, Houston, TX, May, 2004.

22. Wang, Y.-C. and Usher, J. M., “Learning Policies for Single Machine Job Dispatching,” The 13th International Conference on Flexible Automation & Intelligent Manufacturing, Tampa, FL, June, 2003.

23. Wang, Y.-C. and Usher, J. M., “A Study of Reinforcement Learning Applied to Dynamic Single-Machine Job Dispatching,” The 6th International Engineering Design and Automation Conference, Maui, Hawaii, August, 2002.

24. Wang, Y.-C. and Usher, J. M., “An Agent-Based Approach for Flexible Routing in Dynamic Job Shop Scheduling,” The 11th Industrial Engineering Research Conference, Orlando, FL, May, 2002.

25. Usher, J. M. and Wang, Y.-C., “Judging the Values of Additional Information on the Performance of Intelligent Agents in Manufacturing Control,” Conference on Intelligent Systems in Design and Manufacturing II, SPIE, Boston, MA, November, 2000.

26. Usher, J. M. and Wang, Y.-C., “Negotiation Between Intelligent Agents for Manufacturing Control,” The 4th International Engineering Design and Automation Conference, Orlando, FL, August, 2000.

27. Usher. J. M. and Wang, Y.-C., “Intelligent Agent Architectures for Manufacturing Control,” The 9th Industrial Engineering Research Conference, Cleveland, OH, May, 2000.


FAIM2026

(Paris, France)

FAIM2025

(New York, U.S.A.)

FAIM2024

(Taichung, Taiwan)

FAIM2023

(Porto, Portugal)

FAIM2019

(Limerick, Ireland)

FAIM2018

(Columbus, U.S.A.)

FAIM2017

(Modena, Italy)

FAIM2016

(Seoul, South Korea)

FAIM2015

(Wolverhampton, U.K.)

FAIM2014

(San Antonio, U.S.A.)

FAIM2013

(Porto, Portugal)

FAIM2012

(Helsinki, Finland)

FAIM2011

(Taichung, Taiwan)

FAIM2010

(Oakland, U.S.A.)

FAIM2009

(Middlesbrough, U.K.)

FAIM2006

(Limerick, Ireland)

FAIM2003

(Tampa, U.S.A.)