PWD Allahabad, PMGSY Division
Construction of Road under PMGSY Scheme. [25 Days]
Road design and construction practices that are cost-effective and address environmental impacts;Environmental concerns during project planning, design and implementation and stage; Technical & safety requirements for the project.
IIT ROORKEE
Conservation Plan for Hindon River in-between Ghaziabad and Delhi. [1 Year]
Identification and quantification of point and non-point sources of pollution, pollution load and water quality analysis of Hindon river at different locations, Identification of drains and tributaries in the study stretch, Conservation plan for the river suggesting sewage treatment plants, solid waste management, public participation, river front development, etc.
NIT SURAT
Use of Sludge as Coagulant. [1 Year]
The main objective of project was to recycle and reuse sludge [collected from Water Treatment Plant] as coagulant also impact of sludge discharge on Tapi river [Surat, Guj.] was analyzed and recovery of Aluminium content from sludge was carried out, which was used as an coagulant, later.