PT Mikael Fortuna Optima (MFO) as a main contractor for the building of factory "PT Total Pack Solution" project. There are 9 building parts in this project (Building A, B, C, D, E, TPS, MFB, Pos). I have contribute as a site logistic officer of MFO team to make sure material and another support item ready on site.
I was a Site Logistic Officer at Contractor. I have responsibility for ensuring that material procurement are in accordance with the project schedule and requirements.
Industrial fans are designed to circulate air in warehouses, factories, large open buildings, and other applications. in that project i calculate the need for big fan based on SNI and also integrated this project to simulation with Autodesk Computational Fluid Dynamic (CFD)
SGE is a training room to educate employee about SDGS. There are Some facility in SGE (infographics, moduls, etc)
Redesign landfill to diverting organic, non organic and B3 trash, complete infographics about trash education (waste diverted, reduce, recycle and reuse waste) for users.