District: Bywater - Full Control
Owner: Antonine House LLC
HDLC Staff: Chase Klugh
Rating: Contributing
Applicant: Group IV LLC
Permit #: 23-29086-HDLC
Description: Demolition of 49% of roof at rear roof line and new construction of rear addition at Contributing rated, two-story, two-family residential building.
Previous ARC Recommendations:
02/20/24: The ARC voted to defer the application for additional review: The ARC agreed that:
The proposed exterior stair at the CMU addition at the right-side elevation should be moved to the interior of the building to maintain the façade of the CMU addition.
Match the roof pitch of the rear addition with that of the main roof.
Provide additional details for windows and doors at the rear addition.