New SEM-Version - 3 (JULY'2021) (Corrected upto 9)
IRSEM Appendix - II (DRWING for Guidance)
Maintenance Schedule for Signaling Equipment's (Revision 1.0) (October 2021)
Maintenance Schedule of FIRE ALARM SYSTEM
SEM APPENDIX_I FINAL 02.7.21 OLD (1) (NEW)
P-Way Manual - (Corrected upto Amenment No. 21)
Operating Manual- Eng.-updated upto AS-16
Accident Manuals (Corrected upto Amendment No. 17)
S30_Signalling Data Hand Book
GR & SR Corrected upto Amendment no. 106
SEM PART-1 (OLD) (Corrected upto Amendment no. 25)
SEM Part - II (OLD) (Corrected upto Amendment No. 14)
Block working Manual (English - 2013) With A.S 1
ब्लाक संचालन नियमावली - 2015
SOD (REVISED)
Material Test Report
Standardization of CIRCUITS
STANDARDIZATION CIRCUITS REPORT ON STANDARDIZATION OF FOR E.I
AMC & ARC
Hiring of Vehicles
IMP Letters
JOINT PROCEDURE ORDER - (JPO)
Letter & New Format of JOINT POINT & CROSSING
HBL make IPS
STATCON make IPS
Pocket book on Integrated power supply
Fire Alarm Maint. System (Vighnaharta)
ELD Manual (Reliance)
Pocketbook on Fuse Auto Changeover System
Maintenance handbook on AFTC
RAVEL Main Fire alarm system
Gallant IPS Manual
Microlock - II E.I system maintenance instruction series I
Deltron UFSBI
Handbook of Data logger reports
FRAUSCHER make Axle Counter
Insta. of Eldyne maek DAC with pre-commissioning checklist Eldyne
CEL make Installion MSDAC DACF-730P V2.6
Maintenance Handbook on CEL HASSDAC
Handbook on Maintenance of DAC
Maintenance handbook on MSDAC
Handbook on Troubleshooting of DAC
Three Layer Earthing (VIDEO)
Copendium LETTER
Compendium IPS
Copendium_UFSBI
Copendium_Relay
Copendium_EI
Compendium_DAC
AWS
AUTO SIGNALING
AMC - SIGNAL
AFTC
AXELE COUNTERS
ACCIDENT POLICY
CONSTRUCTION
CABELS
CRS
DATALOGGERS
Drawings
EI
FUSES
RE
RELAYS
RDPMS
SIGNAL
TRACK CIRCUIT
UFSBI/BPAC
Fire Extinguisher Circular
Inspection of Fire Extinguisher
INTERLOCKING CLASSIFICATION ETC
INSPECTIONS
JOINT CIRCULARS
LC GATES
LED SIGNALS
MISC
MAINTENANCE SCHEDULE
PI-RRI
POINT
POWER SUPPLY / IPS
PASSENGER AMENITIES
RELIABILITY IMPROVEMENT
SLIDING BOOM
SIGNAL WORKS
Terminals - (Elmex, WAGO, Phonix etc)
TSAA & NI
Compendium for Policy Guidelines for Signalling Installations
List of documents available at STATIONS
VDU
Codes for reasons for Relay Room Opening
Auditing of Power Supply (Format)
Opening of Relay Room by S&T Staff Other Than Group 'D' Staff
CT_PTX_TWS_Design_dated_20.09.2024 (Along with annexures)
RDSO TWS letter Retro fitment letter to Zonal Railways (PCSTE)
Maintenace realted to TWS (27.11.2024)
TWS checklist_May 2024
TWS SSD checklist
Flyer on Spring Setting Device (SSD)
Opening of Minor works -Gazette Notification Amendment Rules, 2024, 18.04.2024
Station Commisioning checklist
Pre commissioning checklist of Kyosan
Automatic Checklist
Dimension of Standard Push Trolley wheels.
CEL - Pre Commission Checklist
FIRE ALARM - TAN
Medha - Pre Commission Checklist
TAN - for E.I Installation (28.06.2021)
TSAA - of Digital Axle Counter system
Revised TAN for E.I dtd 23.07.2025
ELB Drawing - RDSO S-11600 Ver 2.0
Check list - Safety integrity test of LC gate
Cyber security TAN with Format
Power Supply to the Datalogger Reg
DIRTY CLEAN SEGREGATION of E.I wiring
ELB - RDSO TAN with letter 02 02 2026
MSDAC TAN Format
Pre Commission Check List of IPS
OEM certification before commissioning of S&T Gears
Pre-commissioning check list for data logger- RDSO
Revised E.I - TAN STS-E-TAN-3012 Ver 2.0 (2016)
Pre Comm.Check lisit for Ansaldo Microlok-II_Ver__4
TAN_Industrial_Computer_and_Earthing_For_EI
Checklist for Negative Testing of New EI/PI/Auto Commissioning and Alterations (FAT TESTING)
Replacement of electrolytc capacitor in modules of MEI633 El system.
TAN 3006 ver 3.0 on Earthing , Bonding, SPD System for S&T Inst. 08.01.2025
Revised TAN 3.1 for Earthing, Bonding, Surge & Lightning Protection System for S&T Installation
Guidelines on Earthing , Bonding, Surge & Lightning Protection System for S&T Installation
Pre-Commissioning check List - Frauscher make MSDAC
Revised TSAA CHECKLIST VER2 for E.I dated 23.7.2025
LED specs RDSO/Spn/199/2025 composite dtd - 08.08.25
Revised - Regarding use of Embedded PC for EI TAN - STS/E/TAN/3007 Ver 2.0
ELB - Pre Commissioning Checklist (PCCL) with letter 02 02 2026
Pre-commissioning Check list for MSDAC-G39 of G.G. Tronics (04.12.2024)
Codal Life (24.05.2006)
Codal Life of ELB (20.05.2015)
Codal Life of LED (20.05.2015)
Codal life of Electrolytic Condenser (11.06.2015)
Codal life of signaling assets. (15.06.2015.)
Codal life - ELB SP PART CODAL LIFE (23.02.16)
Codal life ( Revised ) 18.08.2016
Codal Life (17.04.2018)
Codal Life (18.05.2020)
Codal Life of - POINT MCH & DG SET (14.06.2020)
Revised Codal life of Assets (24.03.22)
Revised Assest Codal Life (SMMS)
STATION DETAILS (HQ Link)
BLOCK SECTION DETAIL (HQ Link)
LC gate Details (HQ Link)
Relay Hut & OC details
Testing and Overhauling Data
Signalling Data BOOKLET
Point Detail
Div. Equipment Detail (MASTER SHEET)
Division Signal No. Detail
Signal distance less than 1km.
PME - Rules
Apprentice Detail
PME due from March'25 to April'26
PME Due for 2026-2027
PME Data of Supervisors (Signal)
Signal - SUPERVISORS TRAINING DETAIL
ESM/MCF data + Refresher Due for 2025-26
STATION - Snction + Safety Certificate
LC gate Sanction + Safety Certificate
Dispensation
PCE Sanction
CRC/CHECKSUM CERTIFICATES
Station wise Plans & Diagrams
ALL TYPICAL DRAWING LINKED
TYPICAL DRAWINGS - 1
TYPICAL DRAWINGS - 2
Typical Drg. of STOP BOARD (26.11.24)
CTR & JB DETAIL PRINTING SUMMARY
Sliding Boom Drawing
E.I Standard Drawings
Typical Drg. of Full Loction BOX (SS-304)
Typical drg. "Full location box''
All Signalling and Telecom Notes
SWR Correction Slip DONE/NOT DONE
RDSO - Standard Drawing of Calling on borad
E.I JB concept Point Wiring with X-PROTECTION
PACT - ADSTE wise (2026-27) and (Old 2025-26)
PCDO FORMAT
3rd Battery Position
DCTC Battery Due + 3rd Battery Provision
FERRUL - Work Progress
Defective GJ position 19.02.2026
HQ Safety Action Plan 2025-26 (For MONDAY MEETING)
S3 - Repeated Failure + Month wise Failure
DESU of BRC Division
Sr.DSTE AGENDA ITEMS
HQ TARGET FOR 2025-26
Action Plan to reduce AFTC failures in ST - BRC section
Agenda item for Co-ordination meeting with CRS
Point Machine Sealing DATA
PRIME TARGET 2025-26 (LAST YEAR)