New SEM-Version - 3 (JULY'2021) (Corrected upto 8)
IRSEM Appendix - II (DRWING for Guidance)
Maintenance Schedule for Signaling Equipment's (Revision 1.0) (October 2021)
Maintenance Schedule of FIRE ALARM SYSTEM
SEM APPENDIX_I FINAL 02.7.21 OLD (1) (NEW)
P-Way Manual - (Corrected upto Amenment No. 21)
Operating Manual- Eng.-updated upto AS-16
Accident Manuals (Corrected upto Amendment No. 17)
GR & SR Corrected upto Amendment no. 104
SEM PART-1 (OLD) (Corrected upto Amendment no. 25)
SEM Part - II (OLD) (Corrected upto Amendment No. 14)
Block working Manual (English - 2013) With A.S 1
ब्लाक संचालन नियमावली - 2015
SOD (REVISED)
Material Test Report
Standardization of CIRCUITS
STANDARDIZATION CIRCUITS REPORT ON STANDARDIZATION OF FOR E.I
IMP Letters
JOINT PROCEDURE ORDER - (JPO)
Letter & New Format of JOINT POINT & CROSSING
HBL make IPS
STATCON make IPS
FRAUSCHER make Axle Counter
Microlock - II E.I system maintenance instruction series I
WTT - BRC Division
WTT - BCT Division
WTT - RTM Division
WTT ADI - Division
WTT - BVC Division
WTT - RJT Division
Copendium LETTER
Compendium IPS
Copendium_UFSBI
Copendium_Relay
Copendium_EI
Compendium_DAC
AWS
AUTO SIGNALING
AMC - SIGNAL
AFTC
AXELE COUNTERS
ACCIDENT POLICY
CONSTRUCTION
CABELS
CRS
DATALOGGERS
Drawings
EI
FUSES
RE
RELAYS
RDPMS
SIGNAL
TRACK CIRCUIT
UFSBI/BPAC
Fire Extinguisher Circular
Inspection of Fire Extinguisher
INTERLOCKING CLASSIFICATION ETC
INSPECTIONS
JOINT CIRCULARS
LC GATES
LED SIGNALS
MISC
MAINTENANCE SCHEDULE
PI-RRI
POINT
POWER SUPPLY / IPS
PASSENGER AMENITIES
RELIABILITY IMPROVEMENT
SLIDING BOOM
SIGNAL WORKS
Terminals - (Elmex, WAGO, Phonix etc)
TSAA & NI
Compendium for Policy Guidelines for Signalling Installations
List of documents available at STATIONS
12 Hrs VDU Changeover Letter
CT_PTX_TWS_Design_dated_20.09.2024 (Along with annexures)
RDSO TWS letter Retro fitment letter to Zonal Railways (PCSTE)
Maintenace realted to TWS (27.11.2024)
Opening of Minor works -Gazette Notification Amendment Rules, 2024, 18.04.2024
TWS checklist_May 2024
Station Commisioning checklist
OEM certification before commissioning of S&T Gears
Pre commissioning checklist of Kyosan
Pre Comm.Check lisit for Ansaldo Microlok-II_Ver__4
Checklist for Negative Testing of New EI/PI/Auto Commissioning and Alterations (FAT TESTING)
Dimension of Standard Push Trolley wheels.
CEL - Pre Commission Checklist
FIRE ALARM - TAN
Medha - Pre Commission Checklist
Revised TAN for E.I dtd 23.07.2025
ELB Drawing - RDSO S-11600 Ver 2.0
Pre Commission Check List of IPS
Automatic Checklist
Pre-commissioning check list for data logger- RDSO
Revised TAN STS-E-TAN-3012 Ver 2.0 (2016)
TAN_Industrial_Computer_and_Earthing_For_EI
Replacement of electrolytc capacitor in modules of MEI633 El system.
TAN 3006 ver 3.0 on Earthing , Bonding, SPD System for S&T Inst. 08.01.2025
Revised TAN 3.1 for Earthing, Bonding, Surge & Lightning Protection System for S&T Installation
Guidelines on Earthing , Bonding, Surge & Lightning Protection System for S&T Installation
TSAA - of Digital Axle Counter system
Pre-Commissioning check List - Frauscher make MSDAC
Revised TSAA CHECKLIST VER2 for E.I dated 23.7.2025
LED specs RDSO/Spn/199/2025 composite dtd - 08.08.25
Codal Life (24.05.2006)
Codal Life of ELB (20.05.2015)
Codal Life of LED (20.05.2015)
Codal life of Electrolytic Condenser (11.06.2015)
Codal life of signaling assets. (15.06.2015.)
Codal life - ELB SP PART CODAL LIFE (23.02.16)
Codal life ( Revised ) 18.08.2016
Codal Life (17.04.2018)
Codal Life (18.05.2020)
Codal Life of - POINT MCH & DG SET (14.06.2020)
Revised Codal life of Assets (24.03.22)
Revised Assest Codal Life (SMMS)
STATION DETAILS (HQ Link)
BLOCK SECTION DETAIL (HQ Link)
LC gate Details (HQ Link)
Reay Hut & OC details
Testing and Overhauling Data
Signalling Data BOOKLET
Point Detail
STATION DETAIL
Div. Equipment Detail (MASTER SHEET)
Division Signal No. Detail
PME - Rules
Apperintice Detail
PME due from March'25 to April'26
PME Data of Supervisors (Signal)
Signal - SUPERVISORS TRAINING DETAIL
ESM/MCF data + Refresher Due for 2025-26
STATION - Snction + Safety Certificate
LC gate Sanction + Safety Certificate
Dispensation
PCE Sanction
CRC/CHECKSUM CERTIFICATES
Station wise Plans & Diagrams
ALL TYPICAL DRAWING LINKED
TYPICAL DRAWINGS - 1
TYPICAL DRAWINGS - 2
Typical Drg. of STOP BOARD (26.11.24)
CTR & JB DETAIL PRINTING SUMMARY
E.I Standard Drawings
Typical Drg. of Full Loction BOX (SS-304)
Typical drg. "Full location box''
All Signalling and Telecom Notes
SWR Correction Slip DONE/NOT DONE
RDSO - Standard Drawing of Calling on borad
E.I JB concept Point Wiring with X-PROTECTION
PCDO FORMAT
Point Machine Sealing DATA
DCTC Battery Due + 3rd Battery Provision
FERRUL - Work Progress
PACT - Performance Agreement DRM
HQ Safety Action Plan 2025-26 (For MONDAY MEETING)
Pending Discrepancies Noted During JPC (2023-24)
S2 - Joint Insp. with Electrical Department.
S3 - Repeated Failure + Month wise Failure 2024-25
S4 - Exception report of Joint Fool Plate inspection
S5 - Maintenance Arrears 2024-25
S6 - Joint Plan with Sr.DOM 2024-25
S8 - Disconnection (2024-25) + S9 - Relay Room Position
S-9 RELAY ROOM (NEW format)
S-8 disconnection (NEW FORMAT)
S7- Interl. LC gates Status + S10 - Status of Joint Work
DESU of BRC Division
Sr.DSTE AGENDA ITEMS
HQ TARGET FOR 2025-26
Action Plan to reduce AFTC failures in ST - BRC section
Agenda item for Co-ordination meeting with CRS