HARGA KERJA-KERJA WIRING
Harga Pendawaian - Permukaan/Surface (PVC Casing/PVC Conduit/Conceal)
v Pendawaian Lampu - RM 100.00 > RM 130.00
v Pendawaian Looping Dari Lampu Ke Lampu – RM 40.00/Point
v Pendawaian Point Tandas/Tangga 2 Way – RM 200 > RM 250
v Pendawaian Looping Dari Suis Ke Lampu/Kipas – RM 80.00 > RM 120.00
v Pendawaian Socket 13A - RM 120.00 > RM 220.00
v Pendawaian Exhaust Fan - RM 120.00
v Pendawaian Kipas - RM 100.00
v Pendawaian Kipas Termasuk Hook - RM130.00
v Pendawaian Soket 15A/20A (4mm) - RM 200.00 > RM 300.00
v Pendawaian Point Aircond (2.5mm) – RM 120.00 > RM 200.00
v Pendawaian Point Aircond (4.0mm) – RM 300 > RM 380
v Pendawaian Door Bell – RM 240 >
v Pendawaian Armored Cable (Bawah Tanah) – RM 700 > RM 1200
v Pendawaian Armored Cable (Surface) – RM 300 > RM 800
v Pendawaian Network Cat 6 Termasuk Face Plate – RM 350
v Pendawaian photocel – RM 150
v Pendawaian Network (Cat6) – RM 250
v Pendawaian CCTV R59 coaxial + DC Cable – RM 380
PENDAWAIAN (MEGA CABLE) - Permukaan/Surface (PVC Casing/PVC Conduit/Conceal)
v Pendawaian Lampu - RM 150.00 > RM 180.00
v Pendawaian Looping Dari Lampu Ke Lampu – RM 60.00/Point
v Pendawaian Looping Dari Suis Ke Lampu/Kipas – RM 120.00 > RM 160.00
v Pendawaian Socket 13A - RM 150.00 > RM 400.00
v Pendawaian Soket 15A/20A (4mm) - RM 480.00 > RM 550.00
v Pendawaian Point Aircond (2.5mm) – RM 350.00 > RM 400.00
v Pendawaian Point Aircond (4.0mm) – RM 450 > RM 500
v Pendawaian Point Tandas/Tangga 2 Way – RM 250 > RM 280
v Pendawaian Kipas - RM 150.00 > RM 180.00
v Pendawaian Exhaust Fan - RM 180.00 + RM 20 (Hock)
Kos Hacking & Skim
v Anggaran untuk sebuah rumah - RM 800 - RM 1500
v @ RM20/Kaki untuk harga bawah 5 point
v @ RM30/batang point untuk harga wiring sebuah rumah
~ Harga akan bertambah jika melebihi jarak standard (10 meter)
~ Tidak Termasuk Lampu/Suis/Kipas
~ Tambahan RM 100.00 untuk tebuk lubang
Caj transport/upah/troubleshooting (RM 80 > RM 150)
Kos mungkin akan berubah jika :
1.Cable wayar terlalu panjang untuk ke satu point
2.Jenis kualiti wayar (low/medium/high)
3.Jenis pendawaian sama ada menggunakan conduit/casing dan lain-lain
4.tahap kesukaran dan keselamatan tempat kerja
5.Perubahan wiring @ re-wiring
Anggaran Kasar Untuk Pendawaian Conceal Mengikut Point
Pendawaian Lampu / Kipas (1.5mm) - RM 130 > RM 180
Pendawaian Socket Plug 13A/15A (2.5mm) - RM 240 > RM 280
Pendawaian Water Heater / Aircond (2.5mm) - RM 350 > RM 380
ANGGARAN PENDAWAIAN ASAS
~ Pangsapuri / Flat - RM 2,500.00 > RM 3,500.00 (Untuk 25 > 35 Point)
~ Rumah 1 Tingkat - RM 4,000.00 > RM 6,000.00 (Untuk 40 > 60 Point)
~ Rumah 2 Tingkat - RM 7,000.00 > RM 10,000.00 (Untuk 70 > 90 Point)
~ Semi D/ Banglo - RM 10,000.00 > RM 18,000.00 (Untuk 100 > 150 Point)
Kos mungkin akan berubah jika :
1.Cable wayar terlalu panjang untuk ke satu point
2.Jenis kualiti wayar (low/medium/high)
3.Jenis pendawaian sama ada menggunakan conduit/casing dan lain-lain
4.tahap kesukaran dan keselamatan tempat kerja
5.Perubahan wiring @ re-wiring
6.tidak termasuk barang suis/socket/lampu & upah pasang peralatan
Harga Upah Pemasangan Suis,Soket,Lampu,Kipas,Water Heater,TV Bracket & Exhaust Fan
v Upah Pemasangan Suis 1G/2G - RM 20.00
v Upah Pamasangan Suis 3G/4G – RM 30.00
v Upah Pemasangan Soket 13A - RM 20.00
v Upah Pemasangan Lampu Solar - RM 150.00 > RM 250
v Pemasangan Socket Looping Sebelah – RM 50.00/Point
v Pemasangan Socket Looping + Casing/Paip – RM 80.00 > 200.00
v Pemasangan Socket Dari DB + Casing/Paip – RM 150.00 > RM 250.00
v Pemasangan Lampu Filman - RM 15.00 > RM 25.00
v Pemasangan Lampu Kalimantang/LED T8@T5 – RM 20
v Pemasangan DownLIght – RM 20.00 > RM 35
v Pemasangan Kipas 3 Bilah - RM 40.00
v Pemasangan Kipas 4 Bilah – RM 50.00
v Pemasangan Kipas besar 72" - RM 200.00 > RM 500.00
v Pemasangan Exhaust Fan - RM 50.00 > RM 70.00 ( tidak termasuk tebuk lubang, Power point )
v Pemasangan Lampu Perhiasan RM 60.00 > RM 150.00
v Wiring Kipas Baru Dari Socket terdekat + Suis + Hook + Casing - RM 200.00
v Wiring Looping Dari Lampu Ke Lampu - RM 40/Point
v Wiring Dari Suis/Kipas Ke Lampu - RM 70.00 > RM 100.00
v Pemasangan Hook Kipas - RM 30.00
v Pasang Mentol Lampu - RM 20.00
v Pasang Kipas Dinding Ke Plug atau Socket Terdekat - RM 30.00
v Tukar Kapasitor Kipas - RM 40 > RM 60
v Buka Kipas Lama - RM 20.00
v Upah Pasang DOL Starter - RM 50.00
v Upah Pasang Wifi CCTV - RM 70.00 (Tidak termasuk point)
Caj transport/upah/troubleshooting (RM 80 > RM 150) akan dikenakan jika buat kerja sedikit
Harga akan berubah mengikut harga barang/Jenama & kesukaran tempat kerja
Exchause Fan
Upah pasang sahaja - RM50 > RM70
Upah tebuk + pasang - RM 350
Upah Tebuk Sahaja - RM250 > RM300 (Mengikut keadaan tempat)
Anggaran harga Exchause fan siap pasang sekali Barang (KDK) - RM450
Water Heater
v Upah Pasang Water Heater Termasuk Flexible Hose - RM 120.00 > RM 150.00
v Pendawaian Point Water Heater (4.0MM termasuk RCCB 0.001MA) - RM 580.00
v Pendawaian Point Water Heater (2.5MM tidak termasuk RCCB 0.001MA) - RM 180.00 > RM 300.00(Bergantung pada jarak Dari DB)
v Pendawaian Water Heater Termasuk Suis Depan Pintu ( Looping Socket Terdekat) - RM 120.00 > RM 180.00
v RCCB Water Heater (0.001)MA – RM 250 (Perlu ada MCB 20A)
v RCBO Water Heater (0.001)MA /20A - RM 180 > RM 250 (Tak Perlu MCB sambung terus dari busbar)
Termasuk Electrical Testing
Tidak termasuk Water Heater
Harga untuk wiring 10 meter
Harga Pemasangan Distribution Board (DB) - Single Phase
v DB (Single Phase) 08 way - RM 500.00
v DB (Single Phase) 10 way - RM 550.00
v DB (Single Phase) 12 way - RM 650.00
v DB (Single Phase) 14 way - RM 750.00
v DB (Single Phase) 20 way - RM 850.00
v DB (Three Phase) - RM 1450.00 > RM 2500.00
DB jenis PVC
Tambahan RM 300.00 jenis DB Metal
Termasuk Elektrikal testing
Barang-Barang DB
v Membekal dan menganti MCB 6A,16A,20A ,32A - RM 50/per unit
v Membekal dan menganti ELCB(automatik) 40A single phase 100ma - RM 100
v Membekal dan menganti ELCB(automatik) 63A single phase 100ma - RM 150
v Membekal dan menganti ELCB(automatik) 63A three phase 100ma - RM 250
v Membekal dan menganti ELCB(automatik) 63A three phase 300ma - RM 200
v Membekal dan menganti Main switch double pole single phase 40A - RM 150
v Membekal dan menganti main switch double pole single phase 63A - RM 150
v Membekal dan menganti main switch three phase 63A - RM 180
v Membekal dan menganti main switch three phase 100A - RM 200
v Membekal dan memasang neutral / earth Link - RM 100
v Membekal dan menganti Cutout / Main Fius - RM 100
v Membekal dan Memasang Timmer – RM 430
v Membekal dan Memasang SPD – RM 300
Caj transport/upah/troubleshooting (RM 80 > RM 150) akan dikenakan jika buat kerja sedikit
Harga akan berubah mengikut harga barang/Jenama & kesukaran tempat kerja
Upah Pasang DB
Ø Singla Phase
v 8 Way > 20 Way – RM200.00
v 20 Way > - RM 300.00
Ø 3 Phase
v RM 300.00
Termasuk Electrical Testing
Harga akan berubah mengikut kesukaran & keselamatan tempat kerja
Caj Tambahan untuk metal DB - RM 150
Upah Pemasangan TV
v Pemasangan TV Bracket - RM 80.00 > RM 250.00
Caj transport/upah/troubleshooting (RM 80 > RM 150) akan dikenakan jika buat kerja sedikit
Harga akan berubah mengikut harga barang/Jenama & kesukaran tempat kerja
Tukar Suis (Termasuk Barang)
v 1(G) - RM 50.00
v 2(G) - RM 60.00
v 3(G) - RM 75.00
v 4(G) - RM 80.00
v Water Heater / Aircond - RM 70.00
v Socket Plug 13A – RM 60.00
v Socket Plug 15A/20A – RM 70.00
v DOL Starter – RM 160.00
v Lampu Kalimantang /T5/LED Panjang – RM 50.00
v Kipas KDK (Siling) – RM 300.00
v Kipas KDK (Dinding) – RM 230.00
v Kipas Biasa (Siling) – RM 250.00
v Kipas Biasa (Dinding) – RM 60.00
Caj transport/upah/troubleshooting (RM 80 > RM 150) akan dikenakan jika buat kerja sedikit
Harga akan berubah mengikut harga barang/Jenama & kesukaran tempat kerja
Pembumian (Earting)
¤ Pakej Pemasangan Pembumian (Earthing) + Chamber - RM 350 (Max 3 Batang Rod)
¤ Pakej (Mega Cable) Pemasangan Pembumian (Earthing) + Chamber - RM 850 (Max 3 Batang Rod)
¤ Pemasangan pemutus litar ke bumi (Earting) mengunakan rod kuprum (Taipoly) dan penyediaan tapak rod – RM 900.00 > RM 1200.00 per lot
¤ Pemasangan pemutus litar ke bumi (Earting) mengunakan rod kuprum dan penyediaan tapak rod – RM 750.00 > RM 850.00
Max 10 Batang Rod @ Bawah 10 Ohm
Wayar 10mm @ wayar kurang dari 10 Meter
¤ Pengujian pembumian elektrik (Earth tester) – RM 200.00
Earthing Rod - RM 150/batang (5 Kaki)
Saiz Wayar 10mm
Troubleshooting & Pengujian Pendawaian (Inspension)
Pengujian pendawaian elektrik (Insulotion Resistence Tester) rumah kediaman – RM 300.00 > RM 750.00
Service DB Elektrik Check Fius/Breakar - RM 250 - RM 550
Troubleshooting untuk mengenal pasti punca masaalah Wiring Rumah / Pejabat – RM 350 > RM 600 (Bergantung keadaan)
Bil TNB Melambung
Pemeriksaan Pendawaian
Pemeriksaan Trip Bila Kilat
DB Selalu Tripping
¤ Troubleshooting (1 Fasa) – RM 150 >
¤ Troubleshooting (3 Fasa) – RM 300 >
Pengujian pendawaian elektrik rumah kediaman (1 Fasa) – RM 100
Pengujian pendawaian elektrik rumah kediaman (3 Fasa) – RM 160
¤ Pengujian pendawaian elektrik rumah kediaman (1 Tingkat) – RM 100
¤ Pengujian pendawaian elektrik rumah kediaman (2 Tingkat) – RM 150
¤ Pengujian pendawaian elektrik rumah kediaman (Banglo) – RM 300 > RM 500
Harga Pemeriksaan Pendawaian Elektrik (Rumah Baru)
Teres | Condo | Apartment | Flat : RM650
Semi D : RM750
Bunglow : RM850
Commercial : RM1,100
Super Bunglow : RM2,300
Bangunan : RM3,500
Papan Meter & Submain
v Membekal dan memasang Papan Meter (1 Fasa) - RM 150
v Membekal dan memasang Papan Meter (3 Fasa) - RM 300
Upah Tarik Kabel
1.5mm - RM 23/Meter
2.5mm - RM 25/Meter
4mm - RM 28/Meter
6mm - RM 30/Meter
10mm - RM 43/Meter
16mm - RM 55/Meter
25mm - RM 66/Meter
35mm - RM 83/Meter
50mm - RM 100/Meter
70mm - RM 146/Meter
95mm - RM 184/Meter
120mm - RM 230/Meter
150mm - RM 280/Meter
185mm - RM 483/Meter
240mm - RM 483/Meter
300mm - RN530/Meter
~Harga untuk 3 Fasa kira X2
Caj transport/upah/troubleshooting (RM 80 > RM 150) akan dikenakan jika buat kerja sedikit
Harga akan berubah mengikut harga barang/Jenama & kesukaran tempat kerja
Terma Dan Syarat
ü Harga yang ditawarkan di atas mungkin akan berubah mengikut harga pasaran.
ü Harga yang ditawarkan adalah untuk kegunaan rumah & pejabat dan kedai sahaja.
ü harga di atas adalah harga keseluruhan ( kerja banyak ) bukan harga jika kerja sedikit.
ü Harga yang ditawarkan adalah untuk kawasan di sekitar Kelantan sahaja.
ü Harga yang ditawarkan mengikut Material yg digunakan
ü Kerja akan dimulakan apabila kedua-dua pihak (Pihak Syarikat/Pihak Pelanggan) bersetuju dengan sebut harga yang dikemukakan.
Tempoh jaminan terhadap sebarang pemasangan dan pendawaian adalah 1 ke 5 tahun.