Lock 3 Final Proposal
Each Team was tasked with modifying the current park plan by implementing a boardwalk, cafeteria building, slide, and splash pad while adhering to all as many possible ages and ADA compliance.
Lock 3 Park Final Report
The final design report which includes a report section, 3D models, plan sheets, cost estimates, and engineering calculations.
Lock 3 Final Presentation
Powerpoint presentation that was presented to the City of Akron.