Part of a multi-billion pound investment at their existing plant near Dublin, included the design and construction of a new fab to produce the latest in micro-chip technology.
The design and construction process of the project is expected to be 5 years
The Dreadnought Class of submarines are the replacement for the Vanguard Class Nuclear Submarine.
One of the most complex engineering projects to be delivered in the United Kingdom.
The Type 26 Frigate will be at the centre of the Royal Navy's fleet. The ship will undertake the Royal Navy's three core roles - Warfighting, Maritime Security and International Engagement.
The design of the ship is a complex process, Naval Standards, Noise Reduction and Shock have to be incorporated into the design process.
The project included extensive work in Zone 5 of the vessel including the Gearbox and Forward Engine Room, ensuring plant layout was efficient.
Statoil's Mariner Area Development project, located in the northern North Sea, calls for the development of Mariner and Mariner East ultra-heavy oil fields with an estimated investment of $7bn.
The project lies at water depths that range between 97m and 112m. It is located approximately 130km off the nearest British coast and 40km north-west from the UK / Norway international boundary.
The project conducted at CB&I, involved the design of Pipe Supports using MDS and all relevant calculations.
The supports were designed to satisfy Pipe Stress information and were completed on schedule.
Leading a Team of Pipe Support Designers and Engineers to produce both Brownfield and Greenfield Pipe Supports on the Talisman Claymore Compression Upgrade Project.
All Pipe Supports were verified for their functionality and relevant calculations carried out.
The project was run on schedule and delivered on time