Client: Hotel Rama International (ITC Group), Aurangabad.
Structure design: Conical tensile membrane structure.
Area: 10600 sqft. approx.
Steel: MS dual epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: 1050GSM Mehler (German) PVDF-coated FR Fabric.
Project completion time: 65 days.
Client: ICAR.
Structure design: Dome tensile membrane structure.
Area: 2700 sqft. approx.
Steel: MS dual epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: 900GSM Sioen(Belgium) PVDF-coated FR Fabric.
Project completion time: 65 days.
Client: Jindal Maharshtra Shamless.
Structure design: Conical Tensile Membrane structure.
Area: 2830sqft.
Steel: MS Structure.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: 900GSM, Serge Ferrari (French) PVDF coated FR Fabric.
Project completion time: 30 days.
Client: L&T Infrastructure.
Structure design: Arch
Area:540sqft.
Steel: MS epoxy coated
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: 750GSM, Serge Ferrari (French) PVDF-Coated FR Fabric.
Project completion time:20 days
Client: Adil Badai.
Structure design: Conical tensile structure.
Area: 2400sqft.
Steel: MS epoxy coated.
Fabric: 750GSM, Serge Ferrari (French) PVDF coated FR Fabric.
Project completion time: 20 days.
Client: Sundar Niwas CHS.
Structure design: Arch car parking structure.
Area: 1465sqft
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Sioen (Belgium) PVDF Coated FR fabric.
Project completion time: 20 days.
Client: Regent First Private Limited.
Structure design: Cantilever car parking structure.
Area: 1465 sqft.
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Sioen (Belgium) PVDF Coated FR fabric.
Project completion time: 20 days.
Client: Ruchira Farm.
Structure design: Dome tensile structure.
Area: 2050 sqft.
Steel: MS epoxy coated.
Fabric: Sioen 650GSM (Belgium) PVDF-Coated FR fabric.
Project completion time: 30 days
Client: Malhari.
Structure design: Arch swimming pool structure.
Area: 690 sqft.
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Sioen 650GSM (Belgium) PVDF-Coated FR fabric.
Project completion time: 20 days.
Client: Ajwa House of Dry fruits.
Structure design: Umbrella.
Area: 370 sqft.
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Sioen (Belgium) PVDF-Coated FR fabric.
Project completion time: 15 days.
Client: Vijay Sutar.
Structure design: Umbrella.
Quantity: 5.
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Sioen 650GSM (Belgium) PVDF Coated FR fabric.
Project completion time: 25 days.
Client: Perfect Engineering industries.
Structure design: Conical Structure.
Area: 1200 sqft.
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Serge Ferrari (French) PVDF-coated FR Fabric.
Project completion time: 45 days.
Client: Sanjay Sir
Structure design: Conical structure
Area: 2350sqft.
Steel: MS structure.
Paint: One coat of Epoxy primer and two coats of epoxy paint (Asian Paint).
Fabric: Serge Ferrari (French) PVDF-coated FR Fabric.
Project completion time: 20 days.
Client: Khanvel Resort
Structure design: Arch shape Structure.
Area: 1850sqft.
Steel: MS.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Serge Ferrari (French) PVDF-coated FR Fabric.
Project completion time: 20 days.
Client: Godfrey Phillips India Limited
Structure design: Tunnel
Area: 270sqft
Steel: MS.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: CSC 650GSM (Indian) PVC-coated Fabric
Project completion time: 15 days