PHASE I
PHASE I. Treatment of the foundation excavation prior to cementing with MAPECON F-3D. This includes the whole interior soil surfaces and the area along the outside perimeter of the building or home.
PHASE II
PHASE II. Skeletal framework including rough hollow block wallings, floor beams, joints, girders, frames, windows, doors, ceiling frames with MAPECON F-D. .
PHASE III
PHASE III. Treatment includes applications of MAPECON F-3 powder termicide in all places susceptible to termite passages. This is done after the building or home is completed and ready for occupancy.