LLE&C as an engineering and construction company that provides solutions to support all your construction needs. We can also exemplify the posibilities of what your project would look like as a standard evolution.

FIRSTLY: We produce a FREE estimate that can give the client a general idea of the project depth and involvement.

SECONDLY; We perform an initial assesment. The constructabilities are endless, and because of this, we take the aproach of getting to know the project scope as expanded as possible to grasp the most value alonside the clients maximum satisfaction.

THIRDLY: We tailor the needs and requirements for partial or complete job awards. We are very flexible and can source different approaches to accomodate the specifics of every project.

We show next what a typical project could develop as following:

ENGINEERING:

Define Project Requirements: Determine the purpose, scope, and objectives of the project. Identify specific needs, constraints, and desired outcomes.

Site Analysis: Conduct a thorough analysis of the site, including topography, soil conditions, environmental factors, and utility access.

Conceptual Design: Develop a preliminary design that aligns with the project requirements, considering functionality, aesthetics, and sustainability.

Detailed Design: Create a comprehensive design plan, including architectural, structural, mechanical, electrical, and plumbing aspects. Incorporate feedback from stakeholders and address any potential issues.

Permitting and Approvals: Obtain the necessary permits and approvals from local authorities, ensuring compliance with regulations and codes.

DEMOLITION

Survey and Assessment: Assess the existing structure(s) to be demolished, identifying potential hazards, salvageable materials, and utilities to be disconnected.

Hazard Mitigation: Implement safety measures to protect workers, neighboring properties, and the environment during the demolition process.

Utility Disconnection: Disconnect and cap off utilities, such as water, gas, electricity, and telecommunications, following established protocols.

Demolition Method Selection: Choose the appropriate demolition method based on factors like site conditions, structure type, and surrounding environment. Options include implosion, mechanical demolition, or deconstruction.

Demolition Execution: Safely and systematically carry out the demolition, adhering to established safety protocols. Properly dispose of or recycle debris and materials as required.

CONSTRUCTION

Site Preparation: Clear the site, level the ground, and establish temporary facilities, such as fencing, access roads, and utilities required during construction.

Foundation and Structure: Begin construction by laying the foundation, which may involve excavation, forming, and pouring concrete. Proceed with erecting the structure, including framing, roofing, and exterior walls.

Mechanical and Electrical Systems: Install essential systems, such as HVAC (heating, ventilation, and air conditioning), plumbing, electrical wiring, and fire protection.

Interior Construction: Carry out interior work, including partition walls, flooring, ceilings, doors, windows, and any other necessary features or finishes.

Exterior Construction: Focus on exterior elements, such as landscaping, paving, exterior wall finishes, windows, doors, and roofing.

Inspections: Conduct regular inspections at key milestones to ensure compliance with building codes, safety regulations, and quality standards.

Testing and Commissioning: Test and commission installed systems to verify functionality, safety, and performance.

Finalize Building Enclosure: Complete the building enclosure, including insulation, weatherproofing, and installation of windows, doors, and seals.

FINISHING

Interior Finishes: Install interior finishes, such as paint, wallpaper, flooring, cabinetry, countertops, fixtures, and lighting.

Exterior Finishes: Apply exterior finishes, such as paint, siding, stucco, or other desired cladding materials.

Landscaping and Site Development: Design and implement landscaping features, outdoor amenities, walkways, parking lots, and other site development elements.

Systems and Equipment: Install and connect appliances, fixtures, and equipment, such as HVAC controls, electrical devices, plumbing fixtures, and any other necessary systems.

Final Inspections: Schedule final inspections to obtain necessary certifications and ensure compliance with all regulations.

Cleaning and Commissioning: Perform thorough cleaning of the premises, including removal of construction debris and a detailed cleaning of interior spaces.

Punch List and Corrections: Create a punch list of any remaining issues or deficiencies and rectify them promptly.

Handover and Occupancy: Officially hand over the completed project to the client, obtain necessary certifications, and facilitate the transition to occupancy.