Dang, T. M., Ju-Yong Lee, Jun-Hee Han*. Temporary Capacity Expansion Policy for Multiple Lines in Semiconductor Fabrication Using Reinforcement Learning. 1st revision.
Ju-Yong Lee and BongJoo Jeong*. Algorithms for a 2-stage hybrid flow shop scheduling problem with two classes of jobs. submitted.
Kyu-Tae Park., Ju-Yong Lee*, and Park, Y., 2025. Digital Twin-based Cyber-Physical System for Resilient Short-term Equipment Leasing. International Journal of Production Research, published online. (Link1, Link2)
Kyu-Tae Park, Chiho Lim, Ju-Yong Lee*, 2025. Production Scheduling for Human-Robot Collaborative Assembly Workstations under Constraints of Ergonomic Fatigue and Simultaneous Cooperation. Journal of Manufacturing Systems (IF 14.2, <1% in OR/MS, 2024), Vol. 83, 337-356. (Link)
Ju-Yong Lee, I-C. Jeon, Jun-Hee Han*, 2025. Scheduling for two stages with a single machine and a job shop. Computers and Operations Research, Vol. 183, 107167. (Link)
Jun-Hee Han, Sung-hoon Jeong, Gyusun Hwang*, Ju-Yong Lee*, 2024. Machine learning-based dispatching for a wet clean station in semiconductor manufacturing. Journal of Manufacturing Systems (IF 12.2, <1% in OR/MS, 2023), Vol. 77, 341-355. (Link)
Kyu-Tae Park*, Ju-Yong Lee*, Moon-Won Park, Yang Ho Park, Joung-Yun Lee, Yun-Hyok Choi, 2024. Models and P4R asset description for digital twin-based advanced planning and scheduling for resilient production operation. Journal of Manufacturing Systems (IF 12.2, <1% in OR/MS, 2023), Vol. 77, 127-153. (Link)
Jun-Hee Han, Ju-Yong Lee*, 2023. Genetic algorithm-based approach for makespan minimization in a flow shop with queue time limits and skipping jobs. Advances in Production Engineering & Management, 18(2), 152-162. (Link, pdf)
Jun-Hee Han, Ju-Yong Lee*, 2023. Scheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturing. Engineering Optimization, 55(10), 1742-1759. (Link, pdf)
Jun-Hee Han, Ju-Yong Lee*, 2021. Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints. Applied Sciences, 11(23): 11240. (Link)
Jun-Hee Han, Ju-Yong Lee*, BongJoo Jeong*, 2021. Production planning problem of a two-level supply chain with production-time-dependent products. Applied Sciences, 11(20): 9687. (Link)
Ju-Yong Lee, 2020. A genetic algorithm for a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times. Mathematical Problems in Engineering, Article ID 8833645, 13 pages. doi.org/10.1155/2020/8833645. (Link)
Jun-Hee Han, Ju-Yong Lee*, Y-D. Kim, 2019. Production planning in a two-level supply chain for production-time-dependent products with dynamic demands. Computers and Industrial Engineering, Vol. 135, pp. 1-9. (Link)
Ju-Yong Lee*, Y-D. Kim and T-E. Lee, 2018. Minimizing total tardiness on parallel machines subject to flexible maintenance. International Journal of Industrial Engineering: Theory, Applications and Practice, Vol. 25, No.4, pp. 472-489. (Link)
Ju-Yong Lee* and Y-D. Kim, 2017. Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine. Computers and Industrial Engineering, Vol. 114, pp. 22-30. doi: 10.1016/j.cie.2017.10.004 (Link)
Dong-Hoon Lee, Bong-Joo Jeong, Bong-Kyun Kim, Ju-Yong Lee, Sebong Jang, and Y-D. Kim*, 2016. Algorithms for aircraft flight and maintenance scheduling in an army aviation unit. Military Operations Research Journal, Vol. 21, No. 3, pp. 5-17. doi: 10.5711/1082598321305 (Link)
Ju-Yong Lee and J-Y. Bang*, 2016. A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness. Mathematical Problems in Engineering, Vol. 2016, Article ID 6409321, 10 pages. DOI:10.1155/2016/6409321 (Link)
Ju-Yong Lee and Y-D. Kim*, 2015. A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint. Journal of the Operations Research Society, Vol. 66, No. 9, pp. 1542–1554. DOI: 10.1057/jors.2014.122 (Link)
Du-Hyun Han, Y-D. Kim*, and Ju-Yong Lee, 2014. Multiple-criterion Shortest Path Algorithms for Global Path Planning of Unmanned Combat Vehicles. Computers and Industrial Engineering, Vol. 71, pp. 57-69. DOI: 10.1016/j.cie.2014.02.013 (Link)
Ju-Yong Lee and Y-D. Kim*, 2012. Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance. Computers and Operations Research, Vol. 39, No. 9, pp. 2196-2205. DOI: 10.1016/j.cor.2011.11.002 (Link)
BongJoo Jeong, Jun-Hee Han, Ju-Yong Lee*, 2021. Metaheuristics for a flow shop scheduling problem with urgent jobs and limited waiting times. Algorithms, Vol. 14, No. 11, 323. (Link)
June-Young Bang, Ju-Yong Lee, BongJoo Jeong*, 2020. Real time algorithms for scheduling problem in unplanned firing operation. ICIC Express Letters, Vol. 14, No. 6, pp. 577-583. (Link)
이주용, 이재영, 이지우, 신상문, 장준혁, 한준희*, 2023. 해양기상부표의 센서 데이터 품질 향상을 위한 프레임워크 개발, 한국산업경영시스템학회지, Vol. 46, No. 3, pp. 186-197. (Link)
이주용, 조광진, 한준희*, 2023. 소규모 제조업의 생산 성과지표 개발, 경영교육연구, Vol. 38, No. 2, pp. 179-196. (Link)
정준일, 이주용, 한준희*, 2021. Kano 모델 및 Timko의 계수를 활용한 자재 관리 품질 특성 연구, 한국경영공학회지, Vol. 26, No. 3, pp. 87-97. (Link)
정봉주, 이주용*, 2020. 시간 제약과 순서 의존 준비시간이 있는 흐름 공정에서의 총 납기지연 최소화. 경영과학, Vol. 37, No. 3, pp. 99-111. (Link)
이주용, 정봉주*, 2020. 긴급주문과 순서의존준비시간이 있는 흐름공정의 일정계획 휴리스틱 알고리즘 연구. 경영과학, Vol. 37, No.1, pp. 47-60 (Link)
한준희, 정봉주, 이주용*, 심상오, 2019. 대기시간을 허용하지 않는 두 단계 조립시스템에서 총 작업완료시간 최소화를 위한 일정계획 연구. 경영과학, Vol. 36, No.4, pp. 1-12 (Link)
한준희(70%), 이주용(30%), 이상 데이터 탐지 및 보간 방법과 이를 수행하는 전자 장치(출원 10-2024-0003994)
생산운영관리 Joel D. Wisner 저, 안재형, 김보성, 김기태, 김대철, 심재훈, 엄기현, 이종태, 이주용, 정철호, 정태수, 최영근 역, 한올출판사 (Link)