A detailed soil investigation and site survey is carried out to analyze soil behavior, ensuring strong foundations and enhancing building strength.
Proper demarcation reference points are provided on site to help contractors start construction work smoothly and with accuracy.
Center line marking is done for columns and footings, ensuring precise excavation and structural stability.
We strictly check shuttering levels in column and footing works to maintain accuracy as per design.
Reinforcement work in columns and footings is thoroughly checked as per structural drawings for safety and strength.
Concrete grade ratio in columns and footings is verified to ensure high strength and durability in the building structure.
Plinth beam and D.P.C. casting is checked to avoid cracks and maintain the longevity of the building.
Plot layout and symmetry (Gunia) is checked carefully before starting the brick work to ensure accuracy.
Every stage of brick work and landscaping is supervised to achieve quality finish and durability.
Ground floor activities such as shuttering level, reinforcement, electrical conduits with fan box points, concealed lighting, and concrete grade ratio are verified for smooth execution.
Electrical wiring layouts inside walls are checked thoroughly before plastering to avoid errors.
All plumbing lines are inspected before plaster to ensure leakage-free performance.
Firefighting systems and MEP services are checked to ensure safety and compliance.
False ceiling work is examined to maintain aesthetic appeal and durability.
Both interior and exterior plaster work are monitored for a smooth and crack-free finish.
Flooring and tile installations are inspected to achieve perfect leveling and long-lasting performance.
Installation of doors and windows is checked as per the architectural schedule and design.
High-quality waterproofing is ensured in toilets and terrace areas to prevent leakage.
Staircases and kitchen counters are checked for structural safety and design accuracy.
Lift installation is supervised for safety, precision, and code compliance.
Final painting and color combinations are verified to enhance aesthetics and interior beauty.
Regular training is provided to contractors, labor, and site staff to achieve quality work while reducing building costs.
Soil sample collection and testing in laboratory for Multistory building
Excavation, soiling, pcc, reinforcement laying and casting
Plinth beam casting at Ground level
Load bearing and partition wall with bond beam for strength
Column casting & brick masonry
Front view shuttering
Ground floor shuttering
Ground floor reinforcement laying
Residence Ground floor steel with electric conducting checking as per drawing by RS Architect and Engineers team
Ground floor casting Started at Intial stage
School Reinforcement checking as per the drawing by RS Architect and Engineers team in kotputli
Concrete quality checking
Aggregate quality checking
Duplex project casting and checking ratio
Modern 3d view
Living Room Interior
Kid's Bed Room Interior
Render floor plan
kid's bed room Interior
Modular kitchen
Luxury modular kitchen with interior
Luxury drawing cum living room interior
Bed room Interior
bed room Interior with false ceiling
Modern duplex 3d view
Kamlesh ji G+1, Traditional 3d view