Search this site
Embedded Files
Skip to main content
Skip to navigation
Kemp Rosena Residence
Our Home
New Concrete
Location
Recreation Center
Construction
Move-in Schedule 2019
Kemp Rosena Residence
Our Home
New Concrete
Location
Recreation Center
Construction
Move-in Schedule 2019
More
Our Home
New Concrete
Location
Recreation Center
Construction
Move-in Schedule 2019
New Concrete
The Concrete Truck arrives and the pouring begins -
Saturday, April 25 7AM
Concrete Improvements
April 2020
Here is the plan we sketched - including:
Widening of the driveway
Sidewalk from front, through the gate to the back yard.
Pad for shed
24" retaining wall along the back yard
Concrete stairs to the top of the slop
Lapis Lane Concrete
Photo Gallery
Google Sites
Report abuse
Google Sites
Report abuse