Activities during 2013 - '16
2013
2013
1. Subscription to INFLIBNET.
1. Subscription to INFLIBNET.
2. Opening M.Sc. Courses in Geography and DCNM.
2. Opening M.Sc. Courses in Geography and DCNM.
3. Subdividing the Academic subcommittee into Routine, Examination and Results subcommittees.
3. Subdividing the Academic subcommittee into Routine, Examination and Results subcommittees.
2014
2014
1. Flooring of Central Library with marble stones.
1. Flooring of Central Library with marble stones.
2. Change in working hours of the College.
2. Change in working hours of the College.
3. Introduction and installation of biometric attendance system in the old building.
3. Introduction and installation of biometric attendance system in the old building.
4. Installation of CCTV in the new building.
4. Installation of CCTV in the new building.
5. Introduction of fire safety system in the new building.
5. Introduction of fire safety system in the new building.
6. Formation of Students’ Activity Clubs under the supervision of teachers.
6. Formation of Students’ Activity Clubs under the supervision of teachers.
7. Proposal for introduction of Value Education Programs for students and staff.
7. Proposal for introduction of Value Education Programs for students and staff.
8. Installation of AC machines in the labs, staff room, office and Principal’s room in the 2nd floor.
8. Installation of AC machines in the labs, staff room, office and Principal’s room in the 2nd floor.
9. Renovation of Auditorium with sound absorbing wall and installation of improved sound system and overhead projection system.
9. Renovation of Auditorium with sound absorbing wall and installation of improved sound system and overhead projection system.
10. Arrangement of Wi-fi facility in the 2nd floor of new building.
10. Arrangement of Wi-fi facility in the 2nd floor of new building.
11. Purchase of students’ data management software to be used for ready reckoning.
11. Purchase of students’ data management software to be used for ready reckoning.
12. Software training for office staff.
12. Software training for office staff.
13. Installation of rooftop solar PV system for the purpose of lighting the stairs, toilets and corridors in the new building.
13. Installation of rooftop solar PV system for the purpose of lighting the stairs, toilets and corridors in the new building.
14. Installation of LED lights in the stairs, toilets and lobbies in the new building.
14. Installation of LED lights in the stairs, toilets and lobbies in the new building.
15. To adopt new work plan by the library with extension of library working hours.
15. To adopt new work plan by the library with extension of library working hours.
16. Installation of additional AC machines in the 2nd floor (office, staff room and labs) in the new building to optimize cooling.
16. Installation of additional AC machines in the 2nd floor (office, staff room and labs) in the new building to optimize cooling.
17. Making an arrangement for regular Health Monitoring of college staff / students through appointment of a qualified medical personnel and availing the facilities lying with the Physiology department.
17. Making an arrangement for regular Health Monitoring of college staff / students through appointment of a qualified medical personnel and availing the facilities lying with the Physiology department.
18. IQAC authorizes the coordinator to check the PBAS relating to promotion of the Teachers and forward the PBAS contents to the Principal for further action.
18. IQAC authorizes the coordinator to check the PBAS relating to promotion of the Teachers and forward the PBAS contents to the Principal for further action.
2015
2015
1. Introduction of feedback collection system from the 1st year students to improve faculty performance.
1. Introduction of feedback collection system from the 1st year students to improve faculty performance.
2. Broadening of working space in the office of the new building, if possible, for comfortable interaction of the office staff with the students.
2. Broadening of working space in the office of the new building, if possible, for comfortable interaction of the office staff with the students.
3. Introduction of smart classroom facility in the newly set up auditorium.
3. Introduction of smart classroom facility in the newly set up auditorium.
4. Setting up a rooftop herbal garden.
4. Setting up a rooftop herbal garden.
5. Creation of an interdisciplinary Study Circle to broaden the fields of research activities among the faculties.
5. Creation of an interdisciplinary Study Circle to broaden the fields of research activities among the faculties.
6. Proposal of arranging a joint seminar among the departments of Physics of the three Colleges (VCFW, VC and VEC).
6. Proposal of arranging a joint seminar among the departments of Physics of the three Colleges (VCFW, VC and VEC).
7. Proposal to arrange a seminar on Consumer Affairs and Fair Business Practice through the departments of Economics and Commerce.
7. Proposal to arrange a seminar on Consumer Affairs and Fair Business Practice through the departments of Economics and Commerce.
8. Arranging an awareness Program on Environment and Cancer.
8. Arranging an awareness Program on Environment and Cancer.
9. Flooring of staff room in the new building using marble stones.
9. Flooring of staff room in the new building using marble stones.
10. To conduct workshop on Pain Management.
10. To conduct workshop on Pain Management.
11. To arrange separate reading space for teachers in the Central Library.
11. To arrange separate reading space for teachers in the Central Library.
12. Final review of SSR and making necessary corrections before submission.
12. Final review of SSR and making necessary corrections before submission.
13. Final drafting of IEQA for its inclusion in the SSR.
13. Final drafting of IEQA for its inclusion in the SSR.
14. Taking long term plan to introduce honours course in Chemistry and Economics.
14. Taking long term plan to introduce honours course in Chemistry and Economics.
15. Making provision for rain water harvesting.
15. Making provision for rain water harvesting.
2016
2016
1. Installation of sanitary napkin vending machine and incinerator in lady’s wash room.
1. Installation of sanitary napkin vending machine and incinerator in lady’s wash room.
2. Purchase of an Identity card printer.
2. Purchase of an Identity card printer.
3. Installation of a colour printer and a photocopier for staff and student’s use at college library / computer laboratory.
3. Installation of a colour printer and a photocopier for staff and student’s use at college library / computer laboratory.
4. Departmental organization of last five years data for presentation before NAAC peer team along with a brief power point presentation.
4. Departmental organization of last five years data for presentation before NAAC peer team along with a brief power point presentation.
5. Resolved that notice to be issued mentioning dates for department wise presentation of departmental profile before the IQAC.
5. Resolved that notice to be issued mentioning dates for department wise presentation of departmental profile before the IQAC.
6. Electrical wiring and renovation works in the old building to be completed by July, 15th, 2016.
6. Electrical wiring and renovation works in the old building to be completed by July, 15th, 2016.
7. IQAC requested the campus development committee to speed up campus beautification work immediately after the election embargo is withdrawn.
7. IQAC requested the campus development committee to speed up campus beautification work immediately after the election embargo is withdrawn.