Publications
2024
Sugianto, W. C. and Kim, B. S.*, (2024). Particle swarm optimization for integrated scheduling problem with batch additive manufacturing and batch direct-shipping delivery, Computers and Operations Research, 161, 106430 (SCIE, Q1)
2023
Lee, S. J. and Kim, B. S.*, (2023). Two-stage meta-heuristic for part-packing and build-scheduling problem in parallel additive manufacturing, Applied Soft Computing, (SCIE, Q1, JCR: Less than 10%, IF = 8.263)
Malik, A. and Kim, B. S.*, (2023). Coordination supply chain management under flexible cleaner production system and stochastic conditions, Annals of Operations Research, (SCIE, Q1, IF = 4.854)
2022
Kim, Y. J. and Kim, B. S.*, (2022). Population-Based Meta-Heuristic Algorithms for Integrated Batch Manufacturing and Delivery Scheduling Problem, Mathematics (SCIE, Q1, IF = 2.592).
Jang, J. W., Kim. Y. J., and Kim, B. S.*, (2022). A Three-Stage ACO-Based Algorithm for Parallel Batch Loading and Scheduling Problem with Batch Deterioration and Rate-Modifying Activities, Mathematics (SCIE, Q1, IF = 2.592).
2021
Kim, Y. J. and Kim, B. S.*, (2021). Part-grouping and build-scheduling with sequence-dependent setup time to minimize the makespan for non-identical parallel additive manufacturing machines, The International Journal of Advanced Manufacturing Technology (SCIE, Q1, IF = 3.226).
Kim, Y. J., Jang, J. W., Kim, D. S. and Kim, B. S.*, (2021). Batch loading and scheduling problem with processing time deterioration and rate-modifying activities, International Journal of Production Research, (SCI, Q1, IF = 11.60).
Woo, Y-B., Moon, I. and Kim, B. S.*, (2021). Production-Inventory control model for a supply chain network with economic production rates under no shortages allowed, Computers & Industrial Engineering, 160, October 2021, 107558, (SCIE, Q1, IF = 5.431).
2020
Malik, A. and Kim, B. S.*, (2020). A Constrained Production System Involving Production Flexibility and Carbon Emissions, Mathematics , 8(2) (SCIE, IF = 1.105).
Malik, A. and Kim, B. S.*, (2020). A multi-constrained supply chain model with optimal production rate in relation to quality of products under stochastic fuzzy demand, Computers & Industrial Engineering, 149(1), 2 (SCIE, IF = 4.135).
2019
Woo, Y-B. and Kim, B. S.*, (2019). A genetic algorithm-based matheuristic for hydrogen supply chain network problem with two transportation modes and replenishment cycles, Computers & Industrial Engineering, 127, 981-997, (SCIE, IF = 3.195).
Kim, B. S.* and Joo, C. M., (2019). Variable Neighborhood Search Algorithms for an Integrated Manufacturing and Batch Delivery Scheduling Minimizing Total Tardiness, Applied Sciences-Basel, 9(21), 2019.11.04, (SCIE, IF = 2.217).
Joo, C. M. and Kim, B. S.*, (2019). 제조와 배치배송이 결합된 일정계획을 위한 VNS 알고리즘의 탐색효율에 관한 연구, 한국SCM학회지 , 제19권(집) , 제2호 , PP.145~154.
2018
Jung, S. and Kim, B. S.*, (2018). A study on the effect of setup time of variable neighboorhood search in two-stage assembly flow shop scheduling problem, International Journal of Innovative Computing, Information and Control, 14(3), 1151-1157, (Scopus).
Woo, Y-B. and Kim, B. S.*, (2018). Matheuristic approaches for parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities, Computers & Operations Research, 95, 97-112, (SCIE, IF = 2.600).
Joo, C. M. and Kim, B. S.*, (2018). Batch delivery scheduling of trucks integrated with parallel machine scheduling of job orders from multi-customers, Journal of Advanced Mechanical Design, Systems, and Manufacturing, 12(2), (SCIE, IF = 0.387).
Woo, Y-B. and Kim, B. S.*, (2018). A study on a supply chain network control problem with independent replenishment cycle policy under inventory coordination, ICIC Express Letters, 12(4), 353-359, (Scopus).
Kim, B. S., Logendran, R., Lee, J., and Koh, S., (2018). Real-Time Hoist Scheduling with A Reduced Branch-And-Bound Algorithm, ICIC Express Letters Part B: Applications, 9(12), 2185-2766, (Scopus).
Jung, S., Woo, Y-B., Koh, S. and Kim, B. S.*, (2018). Two-stage assembly scheduling with batch setup times, time-dependent deterioration, and preventive maintenance activities using meta-heuristic algorithms, Mathematical Problems in Engineering, Article ID: 6982631. (SCIE, IF = 1.145)
Kumar, M., Patel, M., Kim, J., Kim, J.*, and Kim, B. S.*, (2018). Vertically alligned crystalline SnS layers-based NIR photodetector governed by pyro-phototronic effect, Materials Letters, 213, 122-125, (SCI, IF = 2.572).
2017
Woo, Y-B., Jung, S., and Kim, B. S.*, (2017). A rule-based genetic algorithm with an improvement heuristic for unrelated parallel machine scheduling problem with time- dependent deterioration and multiple rate-modifying activities, Computers & Industrial Engineering, 109, 179-190, (SCIE, IF = 2.086).
Kim, B. S. and Chung, B. D. (2017). Affinely Adjustable Robust Model for Multiperiod Production Planning Under Uncertainty, IEEE On Engineering Management, 64(4), 505-514, (SSCI, IF = 1.188).
Joo, C. M. and Kim, B. S.*, (2017). Rule-based meta-heuristics for integrated scheduling of unrelatedparallel machines, batches, and heterogeneous delivery trucks. Applied Soft Computing, 53, 457-476, (SCIE, IF = 2.857).
Jung, S., Woo, Y-B., and Kim, B. S.*, (2017). Two-stage assembly scheduling problem for processing products with dynamic component-sizes and a setup time. Computers & Industrial Engineering, 104, 98-113, (SCIE, IF = 2.086).
2016
Jung, S. and Kim, B. S.*, (2016). Novel mathematical models for two-stage assembly flow shop scheduling problem with deterioration and preventive maintenance activities. ICIC Express Letters, Part B: Applications, 7(11), 2477-2482, (Scopus, Best Paper Award at ICICIC 2016).
Woo, Y-B. and Kim, B. S.*, (2016). A study on identical parallel machine scheduling with deterioration and rate-modifying activities. ICIC Express Letters, Part B: Applications, 7(10), 2117-2122, (Scopus).
Chung, B. D. and Kim, B. S.*, (2016). A hybrid genetic algorithm with two-stage dispatching heuristicfor a machine scheduling problem with step-deteriorating jobs and rate-modifying activities. Computers & Industrial Engineering, 98, 113-124, (SCIE, IF = 2.086).
Woo, Y-B., Cho, S., Kim, J.*, and Kim, B. S.*, (2016). Optimization-based approach for strategic design and operation of a biomass-to-hydrogen supply chain. International Journal of Hydrogen Engergy, 41(12), 5405–5418, (SCI, IF = 3.205).
Woo, Y-B., Kim, D. W., Joo, C. M., and Kim, B. S.*, (2016). A hybrid genetic algorithm to design the hydrogen supply chain network with multi-transportation modes. ICIC Express Letters, 10(3), 541-546, (Scopus).
Cho, S., Woo, Y-B., Kim, B. S.*, and Kim, J.*, (2016). Optimization-based planning of a biomass to hydrogen (B2H2) systemusing dedicated energy crops and waste biomass. Biomass & Bioenergy, 87, 144-155, (SCI, IF = 3.249).
Park, J., Park, K., Kim, B. S.*, (2016). Genetic algorithms for an integrated problem of batch production and truck delivery scheduling with a single truck, ICIC Express Letters, 10(1), 9-14, (Scopus).
2015
Joo, C. M. and Kim, B. S.*, (2015). Hybrid genetic algorithms with dispatching rules for unrelated parallel machine scheduling with setup time and production, Computers & Industrial Engineering, 85, 102-109. (SCIE, IF = 2.086).
Kim, B. S. and Joo, C. M., (2015). Scheduling Trucks in Multi-Door Cross DockingSystems: An Adaptive Genetic Algorithmwith a Dispatching Rule, Asia-pacific Journal of Operational Research, 32(3), 1-20, (SCIE, IF = 0.425).
Joo, C. M. and Kim, B. S.*, (2015). Machine scheduling of time-dependent deteriorating jobs with determining the optimal number of rate modifying activities and the position of the activities, Journal of Advanced Mechanical Design Systems and Manufacturing, 21(9), (SCIE, IF = 0.331).
Kim, B. S., Mahardini, K. A., Seo, W., and Koh, S-G., (2015). Minimizing makespan for non-identical parallel machine with sequence dependent setup times, ICIC Express Letter, 9(2), 525-530, (Scopus).
Kim, B. S. and Park, J., (2015). How anthropometric dimensions of the thumb affect mobile touch interactions, ICIC Express Letters, 9(11), 3121~3126, (Scopus).
2014
Joo, C. M. and Kim, B. S.*, (2014), Block transportation scheduling under delivery restriction in shipyardusing meta-heuristic algorithms, Expert Systems with Applications, 41(6), 2851-2858, (SCIE, IF = 2.981).
2013
Kim, B. S.* and Ozturkoglu, Y.*, (2013), Scheduling a single machine with multiple preventivemaintenance activities and position-based deteriorationsusing genetic algorithms, The International Journal of Advanced Manufacturing Technology, 67(5), 1127-1137, (SCIE, IF = 1.568).
Kim, B. S. and Lee, W. S., (2013), A Multi-product Dynamic Inbound Ordering and Shipment Scheduling Problem at a Third-party Warehouse, International Journal of Industrial Engineering-Theory, Applicationas, and Practice, 20, 36-46, (SCIE, IF = 0.3XX).
Joo, C. M. and Kim, B. S.*, (2013), Genetic algorithms for single machine scheduling with time-dependent deterioration and rate-modifying activities, Expert Systems with Applications, 40(8), 3036-3043, (SCIE, IF = 2.981).
2012
Joo, C. M. and Kim, B. S.*, (2012), Scheduling compound trucks in multi-door cross-docking terminals, The International Journal of Advanced Manufacturing Technology, 64, 977~988, (SCIE, IF = 1.568).
Kim, B. S. and Joo, C. M., (2012), Ant colony optimization with random selection for block transportation scheduling with heterogeneous transporters in shipyard, International Journal of Production Research, 50(24), 7729-7241, (SCIE, IF = 1.693).
Kim, B. S. and Smith, J. S., (2012), Slotting methodology using correlated improvement for a zone-based carton picking distribution system, Computers & Industrial Engineering, 62(1), 286-295, (SCIE, IF = 2.086).
Lee, K., Kim, B. S., and Joo, C. M. (2012), Genetic algorithms for door-assignment and sequencing trucks at distribution centers for the improvement of operational performance, Expert Systems with Applications, 39, 12975-12983, (SCIE, IF = 2.981).