Research Interest
Scheduling
Supply chain management
Warehouse operation
Optimization
Metaheuristic
Skills
Optimization Software: ILOG IBM CPLEX Studio
Programming Language: C#, Java
Statistical Software: Minitab
Education
2023.03 - Now: M.S in Department of Industrial & Management Engineering, Incheon National University
2017.03 - 2023.02: B.S in Department of Industrial & Management Engineering, Incheon National University
Experience
2019.01 - Now: Member in IPSCM Lab
Conference
Y. J. Kim, and B. S. Kim (2022). Mixed integer linear programming for scheduling problem of biopharmaceutical distributed manufacturing, 2022 대한산업공학회 추계학술대회
Y. J. Kim, and B. S. Kim (2019). Genetic Algorithms for Batch Loading and Scheduling Problem with Batch Deterioration and Rate-modifying Activities, 2019 대한산업공학회 추계학술대회
Y. J. Kim, and B. S. Kim (2019). 독립적인 작업 크기를 가진 작업과 작업군 내 배치 작업 가능한 생산환경에서 퇴화와 복구조정활동을 고려한 단일 배치 생산 시스템의 일정계획, 2019 춘계공동학술대회
Projects
2022.06 - Now: 의약물류 콜드체인 적시배송을 위한 생산 및 배송 통합 운영계획에 관한 연구 (한국연구재단)
2019.06 - 20.08: 클라우드 분산 생산 환경 하에 다단계 생산 및 배송 네트워크 플레임워크를 위한 통합 최적 일정계획 및 이익 공유 모델에 관한 연구 (한국연구재단)
Awards and Honors
2023.03 - Now: 산업인공지능 전문인력 양성 (한국산업기술진흥원)
인천대를 빛낸, 인천대 학생, 인천대학교, 2020
Publications
Kim, Y. J. and Kim, B. S.*, (2022). Population-Based Meta-Heuristic Algorithms for Integrated Batch Manufacturing and Delivery Scheduling Problem, Mathematics.
Jang, J. W., Kim, Y. J., and Kim, B. S.*, (2022). A Three-Stage ACO-Based Algorithm for Parallel Batch Loading and Scheduling Problem with Batch Deterioration and Rate-Modifying Activities, Mathematics.
Kim, Y. J. and Kim, B. S.*, (2021). Part-grouping and build-scheduling with sequence-dependent setup time to minimize the makespan for non-identical parallel additive manufacturing machines, The International Journal of Advanced Manufacturing Technology.
Kim, Y. J., Jang, J. W., Kim, D. S., and Kim, B. S.*, (2021). Batch loading and scheduling problem with processing time deterioration and rate-modifying activities, International Journal of Production Research.