Happy Watoto

Saifeddine, Kenza, Dunya en Sofia

General information

An assignment is being carried out for the NGO Happy Watoto. This organization helps vulnerable children (3-18 years) in the Arusha region, Tanzania, to build an independent life. The assignment is to design a sustainable and innovative library for the school and orphanage supported by this company. The plan for this starts with research into various points to be addressed, such as material, size, protection and recognisability. These points should be applied to the design and a prototype of the library will be created, which will be placed in a sponsorship video along with background information. The design should be ready for use in January 2022.

Saifeddine Boujeddaine

Dunya van Erve

Kenza el Hassnaoui

Sofia Errachidi

Problem

Happy Watoto focuses on the future prospects for vulnerable children, by offering them a safe environment, education and help finding work. English-language education, from kindergarten to vocational training. That's what the kids need. According to the Education Inspectorate, it is mandatory to have a library that belongs to the school.


The library cannot be created just like that. There is no space nor money available. But the library needs to be built.

Mission

The client expects an innovative solution for the library that must be present. This must be presented in such a way that it is attractive to potential sponsors. Furthermore, the library must be made as cheap as possible. The necessary information for this must be obtained by researching the materials. The final product is fully elaborated in a final end report.

The library must be built, this is essential for the development of the orphans!

Deliverables

In order to properly complete the assignment, 5 deliverables have been drawn up. These deliverables will be posted on this site.

Deliverable 1

Preliminary investigation: The preliminary investigation is a standard preliminary investigation about the client, the assignment and the points to be dealt with in the assignment. A report is made in which the following points are processed.



Deliverable 2

The library: Then the first ideas for the library will have to be generated. This is done on the basis of the following points.



Deliverable 3

Three ideas: This is the go-/no-go phase of the project. The first ideas are formulated and presented to the client. When one (or more) of the ideas gets a 'go', the team will develop it further. If none of the ideas get a 'go', new ideas will have to be thought up and presented.



Deliverable 4

Final design: After getting a 'go' on an idea, this will be further elaborated.





Kopie van Ontwerpverslag