HOUSINGÂ PROJECTÂ WORKÂ PROCESS
2D AND 3D DRAWING
PRODUCE ALUMINUM PANEL
SHIPPING AND FREIGHT
AL-FORM ARRIVES AT SITE
A type of house takes about 80 ~90 days from design, producing and arriving product at site.
EXCAVATION AND FOOTING
SET WALL RE-BAR
SET 1F AND POUR CONCRETE
SET 2F AND POUR CONCRETE
In case of a two-storeyed house, it usually takes 6~8days for 1 set.