Rhino production depends on more than rig count. Separate hopper filling, collection travel, refinery output and the full trip to market when comparing mining results.
The Rhino has three fractional refinery bins. When switching commodities, bins occupied by other minerals can prevent collection of the new material. Finish refining the old material or clear an unwanted partial bin before collecting again.
Published v0.7 documents one six-rig, High-Density Iridium run yielding 675 whole tonnes plus a displayed 68% refinery remainder. Its approximately 515 t/h rate covers the measured collection phase, including driving and transfers; it excludes prospecting, initial deployment and filling, and the journey to market. It is a result from that run, not a guaranteed production rate.
Keep combined route yield separate from individual deposit reserve. Journal totals of raw Engineering Materials describe material collected; inventories that were already full mean those totals cannot establish drop rates.
Related: rig charging and collection routes and credits and Powerplay merits.
The original chapter below provides the cycle accounting, comparison tables and raw-material evidence behind this summary.