Investment Project Delays in Production Networks: Propagation and Implications [Job Market Paper] (with Manchun Wang) [draft]
Abstract: Delays in capital investment projects are common and potentially important in production networks, yet their role as a propagation channel is understudied. We use a shift-share design to provide causal evidence on whether and how project delays propagate through production networks, and on their effects on firms and the aggregate economy. Using novel project-lifecycle data for India and extreme-weather shocks, we find that project delays propagate downstream but not upstream, creating a cascade of additional delays. Project delays have no systematic effect on project owners, but they affect downstream firms: those with active projects maintain or expand operations while stockpiling raw materials, whereas those without active projects contract without stockpiling. We find no significant movement in either input or output prices. The evidence is consistent with quantity rationing, precautionary stockpiling, and projects acting as commitment devices. These effects survive aggregation: contraction dominates at the sectoral level, while neither input nor output prices increase. Thus, the direction of propagation resembles a supply shock, whereas the joint movement in prices and output resembles a demand shock.
Abstract: We examine how the time to build for capital influences the transmission of sectoral and aggregate shocks in an economy with input-output linkages. Using granular capital project life-cycle data from India, we document substantial heterogeneity in time to build for capital across sectors. We find that sectors with stronger downstream linkages—those providing essential inputs to the broader economy and thus transmitting shocks more widely—exhibit greater capital intensity and require significantly longer time to build for capital. We incorporate this heterogeneous time to build for capital into a dynamic general equilibrium model with capital inputs and input-output linkages to analyze how these frictions shape business cycle propagation. Our parameterized results show that time to build for capital creates similar on-shock aggregate responses to productivity shocks, faster short-run decay and substantially increases the persistence. Furthermore, sector-specific shocks to upstream sectors generate larger and more persistent aggregate effects than shocks to peripheral sectors, while time-to-build's also amplified. Shocks to investment hubs exhibit stronger separation of responses from consumption and investment. We also find network location and capital intensity are vital for a sector to be time-to-build bottleneck. These findings highlight the critical role of time to build for capital in shaping both the magnitude and duration of economic fluctuations.
Evaluating the Cause and Impact of State-Owned Enterprise Human Capital Misallocation [draft]
Submitted to International Review of Economics and Finance
Abstract: An important feature of China’s economic growth is the reallocation of resources from the public to the private sector. Despite the convergence in the past decades, empirical evidence shows a persistent human capital premium between SOEs and private firms. I examine wage dispersion using household survey data and find no return-to education premium for SOEs, even after controlling for a range of socioeconomic factors and allowing for potential heterogeneity across industries and occupations. The lack of a pecuniary premium is inconsistent with the persistent human capital premium, suggesting the existence of allocational factors outside the labour market. To test whether distortionary forces are at work, I construct samples comparable to SOE workers and find that the human capital premium persists, which indicates that they are. To reconcile the two empirical facts and evaluate the effect of this human capital premium, I build a two-sector general equilibrium model with capital-skill complementarity in the production function. In my model, financial friction is a key driver of misallocation. The calibrated model shows that financial friction explains around 40 to 50% of the allocation difference, a contribution as large as that of the production function differences that capture the inherent industry concentration and operational differences between the two sectors. By removing the financial friction I find that output increases by 13.0% and consumption by 10.6%. The size of this gain, and the persistence of the misallocation despite signs of a more competitive labour market, point to the importance of further SOE reform.
Macroeconomic Effect of Government Procurement under Financial Friction and Sectoral Linkages