Delpro Engineering Pte Ltd has completed various prestigious projects across Singapore in both public and private sectors. Below are highlights of our key completed works:


⸻


🟩 PU & Epoxy Grouting Projects

• PCMR Project – 2024

Chemical grouting works for water seepage and structural crack treatment.

• Mandai Bird Park – 2019

PU and Epoxy grouting applied to underground structures and tunnel areas.


⸻


🟦 Glass & Aluminium Works

• Jurong West N9C19 HDB Residential Project (2023–2025)

Aluminium window and door installation with sealant, waterproofing, water testing, and defect rectification.

• Queensway C1 & C2 HDB Residential Projects (2023–2025)

PPVC and PBU window installation, sun screen and perforated panel works.

• 30 Toh Guan A&A Commercial Project – 2025

Glass and aluminium works with external cladding and façade detailing.

• Tukang Innovation Commercial Project (2024–2025)

Curtain wall and aluminium system works for commercial façade.

• Skywood Condominium (2014–2016)

On-site aluminium installation, grille, and glazing works.

• Other Residential Projects:

• Serangoon North C20 (2014–2015)

• Bedok N5C20 (2014–2015)

• Yishun N4C, Kallang Whampoa C21, and 29 Sing Ave


⸻


🟨 Electrical & Lighting Works

• Woodlands Bizhub – 2020

Electrical lighting works and system upgrade.

• Changi Airport Terminals, ICA Building & Cargo Agent Building (2018–2019)

Electrical replacement and upgrade works.

• Sengkang & Punggol LRT Tracks – 2017–2018

Installation of LED lighting systems along train track routes.


⸻


🟥 CCTV & Cable Laying Projects

• Police CCTV Installation – Various HDB Sectors (2020–2022)

Complete CCTV setup including power cable laying and reinstatement.

• MATV Dismantle Works – Various HDB Sectors (2021–2022)

Removal and disposal of outdated broadcast systems.

• Carpark Barrier Installation – HDB Estates – 2020

Installation of access control and barrier systems.

• Selarang Army Camp (2014–2015)

Excavation and laying of CCTV and power cables in army compound.

• Sentosa Gateway & Imbiah Road – 2014

VMS system cabling and reinstatement works over pebble stone, concrete, and landscaped walkways.