EA: 05-4482U
CRP: SB-101-PM 2.2/3.3
CCA Date: 01/20/2021
This project was constructed on Route 101 in Santa Barbara County to improve access, operations, and circulation at two interchanges including improved bicycle and pedestrian connectivity. Architectural treatment was included on the bridge structures, retaining walls, sound walls, and slope paving to comply with local planning requirements. Landscape planting included the use of native and drought tolerant plants at the interchanges, roundabouts, and multi-use path.