Gallery

Rewiring Tideswell Cathedral

Installing new lights in Tideswell Cathedral

Rewiring Tideswell Cathedral

A newly installed Zappi Electric Vehicle charger with a tethered cable. 7.5Kw single phase domestic charger.  Made in the UK! See our Electric Vehicle charging page for more information.

A dual RCD consumer unit

New hot tub arriving by crane over house

New downlighters in boarded, plastered, and painted ceiling

New ceiling light

A very overheated non-fire rated GU10 halogen downligher.

Heat damage caused by GU10 downlighters that lack a fire rated housing.

Digging trench for buried cable for new hot tub in back yard.

An overheated junction box partially melted discovered under insulation in loft

A newly installed 10watt LED PIR operated spot light

Testing main bonding to gas

A busy consumer unit

A light that had been installed such that the lamp was contacting the connection block, causing it to melt.

Damaged meter boxes before metal covers added

Meter boxes with new metal covers installed

A cooker hood for low ceilings (Maan)

An older 16th edition board with only one RCD protecting only the sockets but not the lights. A typical arrangement at that time.

Installing steel wire armoured cable (SWA)

An example of a well and truly rusted socket outlet mounted in an exterior wall in a solid stone built house.

An example of a well and truly rusted socket outlet mounted in an exterior wall in a solid stone built house.

The cherry picker ready for installing the parking lot lights.

Dan installing lights in parking lot with cherry picker

New electric towel rail controlled by a remote thermostat

A New Smart Meter

A New Smart Meter