SPEED-Mk.II Compression procedure
Equipment
in the hatch
・Mk.II press
outside the hatch
・Main ram oil system
・Differential ram oil system
Compression Procedure
Step 0. Make sure the D-ram valve is free
Step 1. Set the cell on the lower guide block
Step 2. Insert the lower guide block into the press
Step 3. Remove the fall prevention pin on the back of the press
Step 4. Move the upper guide block closer using the pendant
Step 5. Set the pressurization program
Step 6. Run the program and pressurize
* Prepress does not automatically move to the next step, so you need to press the step up button
*If the prepress is too fast, press the pause button and start button alternately to adjust the pressurization speed.
Step 7. When deforming the sample, close the D-ram valve and use the upper left control panel to deform.
D-DAI type guid block
D-DAI type guid block
The pendant cannot be used when the remote button is off. Please set the touch panel to Manual Control and/or press the remote button.
* Prepress does not automatically move to the next step, so you need to press the step up button
*If the prepress is too fast, press the pause button and start button alternately to adjust the pressurization speed.