Control Chart Ppt Download


Download Zip  https://fancli.com/2xUJlj 


______________ are graphical plots used in production control to determine whether quality and manufacturing processes are being controlled under stable conditions. (ISO 7870-1)[1] The hourly status is arranged on the graph, and the occurrence of abnormalities is judged based on the presence of data that differs from the conventional trend or deviates from the control limit line.Control charts are classified into Shewhart individuals control chart (ISO 7870-2)[2] and CUSUM(CUsUM)(or cumulative sum control chart)(ISO 7870-4).[3]

Control charts, also known as 1_______________ (after Walter A. Shewhart) or 2_______________________, are a statistical process control tool used to determine if a manufacturing or business process is in a state of control. It is more appropriate to say that the control charts are the graphical device for Statistical Process Monitoring (SPM). Traditional control charts are mostly designed to monitor process parameters when the underlying form of the process distributions are known. However, more advanced techniques are available in the 21st century where incoming data streaming can-be monitored even without any knowledge of the underlying process distributions. Distribution-free control charts are becoming increasingly popular[3_______________].

If analysis of the control chart indicates that the process is currently under control (i.e., is stable, with variation only coming from sources common to the process), then no corrections or changes to process control parameters are needed or desired. In addition, data from the process can be used to predict the future performance of the process. If the chart indicates that the monitored process is not in control, analysis of the chart can help determine the sources of variation, as this will result in degraded process performance.[4] A process that is stable but operating outside desired (specification) limits (e.g., scrap rates may be in statistical control but above desired limits) needs to be improved through a deliberate effort to understand the causes of current performance and fundamentally improve the process.[5]

The control chart is one of the seven basic tools of quality control.[6] Typically control charts are used for time-series data, also known as continuous data or variable data. Although they can also be used for data that has logical comparability (i.e. you want to compare samples that were taken all at the same time, or the performance of different individuals); however the type of chart used to do this requires consideration.[7]

The control chart was invented by Walter A. Shewhart working for Bell Labs in the 1920s.[8] The company's engineers had been seeking to improve the reliability of their telephony transmission systems. Because amplifiers and other equipment had to be buried underground, there was a stronger business need to reduce the frequency of failures and repairs. By 1920, the engineers had already realized the importance of reducing variation in a manufacturing process. Moreover, they had realized that continual process-adjustment in reaction to non-conformance actually increased variation and degraded quality. Shewhart framed the problem in terms of Common- and special-causes of variation and, on May 16, 1924, wrote an internal memo introducing the control chart as a tool for distinguishing between the two. Shewhart's boss, George Edwards, recalled: "Dr. Shewhart prepared a little memorandum only about a page in length. About a third of that page was given over to a simple diagram which we would all recognize today as a schematic control chart. That diagram, and the short text which preceded and followed it set forth all of the essential principles and considerations which are involved in what we know today as process quality control."[9] Shewhart stressed that bringing a production process into a state of statistical control, where there is only common-cause variation, and keeping it in control, is necessary to predict future output and to manage a process economically.

Shewhart created the basis for the control chart and the concept of a state of statistical control by carefully designed experiments. While Shewhart drew from pure mathematical statistical theories, he understood that data from physical processes typically produce a "normal distribution curve" (a Gaussian distribution, also commonly referred to as a "bell curve"). He discovered that observed variation in manufacturing data did not always behave the same way as data in nature (Brownian motion of particles). Shewhart concluded that while every process displays variation, some processes display controlled variation that is natural to the process, while others display uncontrolled variation that is not present in the process causal system at all times.[10]

In 1924, or 1925, Shewhart's innovation came to the attention of W. Edwards Deming, then working at the Hawthorne facility. Deming later worked at the United States Department of Agriculture and became the mathematical advisor to the United States Census Bureau. Over the next half a century, Deming became the foremost champion and proponent of Shewhart's work. After the defeat of Japan at the close of World War II, Deming served as statistical consultant to the Supreme Commander for the Allied Powers. His ensuing involvement in Japanese life, and long career as an industrial consultant there, spread Shewhart's thinking, and the use of the control chart, widely in Japanese manufacturing industry throughout the 1950s and 1960s.

If the process is in control (and the process statistic is normal), 99.7300% of all the points will fall between the control limits. Any observations outside the limits, or systematic patterns within, suggest the introduction of a new (and likely unanticipated) source of variation, known as a special-cause variation. Since increased variation means increased quality costs, a control chart "signaling" the presence of a special-cause requires immediate investigation.

This makes the control limits very important decision aids. The control limits provide information about the process behavior and have no intrinsic relationship to any specification targets or engineering tolerance. In practice, the process mean (and hence the centre line) may not coincide with the specified value (or target) of the quality characteristic because the process design simply cannot deliver the process characteristic at the desired level.

Control charts limit specification limits or targets because of the tendency of those involved with the process (e.g., machine operators) to focus on performing to specification when in fact the least-cost course of action is to keep process variation as low as possible. Attempting to make a process whose natural centre is not the same as the target perform to target specification increases process variability and increases costs significantly and is the cause of much inefficiency in operations. Process capability studies do examine the relationship between the natural process limits (the control limits) and specifications, however.

The purpose of control charts is to allow simple detection of events that are indicative of an increase in process variability. [12] This simple decision can be difficult where the process characteristic is continuously varying; the control chart provides statistically objective criteria of change. When change is detected and considered good its cause should be identified and possibly become the new way of working, where the change is bad then its cause should be identified and eliminated.

The purpose in adding warning limits or subdividing the control chart into zones is to provide early notification if something is amiss. Instead of immediately launching a process improvement effort to determine whether special causes are present, the Quality Engineer may temporarily increase the rate at which samples are taken from the process output until it is clear that the process is truly in control. Note that with three-sigma limits, common-cause variations result in signals less than once out of every twenty-two points for skewed processes and about once out of every three hundred seventy (1/370.4) points for normally distributed processes.[13] The two-sigma warning levels will be reached about once for every twenty-two (1/21.98) plotted points in normally distributed data. (For example, the means of sufficiently large samples drawn from practically any underlying distribution whose variance exists are normally distributed, according to the Central Limit Theorem.)

4________________________________________________________________________________________________________________________________________________________________ f 5___________________________________________________________________________________________________________________________________________________________________________________________________________________________________ f 6____________[15]

As for the calculation of control limits, the standard deviation (error) required is that of the common-cause variation in the process. Hence, the usual estimator, in terms of sample variance, is not used as this estimates the total squared-error loss from both common- and special-causes of variation.

When a point falls outside the limits established for a given control chart, those responsible for the underlying process are expected to determine whether a special cause has occurred. If one has, it is appropriate to determine if the results with the special cause are better than or worse than results from common causes alone. If worse, then that cause should be eliminated if possible. If better, it may be appropriate to intentionally retain the special cause within the system producing the results.[7_______________]

Even when a process is 8__________ (that is, no special causes are present in the system), there is approximately a 0.27% probability of a point exceeding 9_______ control limits. So, even an in control process plotted on a properly constructed control chart will eventually signal the possible presence of a special cause, even though one may not have actually occurred. For a Shewhart control chart using 10_______ limits, this 11___________ occurs on average once every 1/0.0027 or 370.4 observations. Therefore, the 12_____________________________ (or in-control ARL) of a Shewhart chart is 370.4.[13_______________] 5376163bf9

can you still download angry birds star wars 2

vn video editor mod apk download

download game the forest pc full version