(1) Cho, K., Kim, J., and Kim, T. (2022). “Critical Review on Economic Effect of Renovation Works for Sustainable Office Building Based on Opinions of Real-Estate Appraisers,” Sustainability, 14(10), 6124
(2) Cho, K. Yang, J., Kim, T., and Jang, W. (2021). “Influence of building characteristics and renovation techniques on the energy-saving performances of EU smart city projects,” Energy and Buildings, Elsevier, 252, 111477 (IF: 5.879, 96.59%)
(3) Cho, K. and Kim, T. (2021). “Optimized scheduling method for office building renovation projects,” Expert Systems With Applications, Elsevier, 168, 114212 (IF: 5.452, 92.26%)
(4) Kim, T., Lee, D., Lim, H., Lee, U., Cho, H., and Cho, K. (2021). “Exploring research trends and network characteristics in construction automation and robotics based on keyword network analysis,” J. of Asian Architecture and Building Engineering, 20(4), 442-257
(5) Cho, K., Kim, J., Kim, T., and Hong T. (2020). “Model for predicting price change patterns in multi-family houses post renovation work,” J. of Asian Architecture and Building Engineering, 19(3), 230-241
(6) Cho, K., Kim, T., and Hong, T. (2020). “Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes,” J. of Mgmt. in Eng., ASCE, 36(2), 04019040, (IF: 3.269, 84.47%)
(7) Jeong, K., Ji, C., Kim, H., Hong, T., and Cho, K. (2019). “An integrated assessment of the environmental, human health, and economic impacts based on life cycle assessment: A case study of the concrete and steel sumps,” J. of Cleaner Production, 239, 118032, (IF: 6.395, 93.03%)
(8) Cho, K., Kim, J., and Kim, T. (2019). “Decision support method for estimating monetary value of post-renovation office buildings,” Canadian J. of Civil Engineering, 46(12), 1103 - 1113, (IF: 0.742, 16.29%)
(9) Jeong, K., Hong, T., Kim, J., and Cho, K. (2019). “Development of a multi-objective optimization model for determining the optimal CO2 emissions reduction strategies for a multi-family housing complex,” Renewable and Sustainable Energy Reviews, 110, 118-131. (IF: 10.556, 98.57%)
(10) Lee, J., Cho, K., Hwang, T., Han, J., and Kim, T. (2019). “Process for Integrating Constructability into the Design Phase in High-Rise Concrete Buildings: Focused on Temporary Work,” International J. of Concrete Structures and Materials, 13(2), 223-232. (IF: 2.111, 61.74%)
(11) Kim, J., Cho, K.,** Kim, T., and Yoon, Y. (2018). “Predicting the monetary value of office property post renovation work” J .of Urban Planning and Development, ASCE. 144(2), 04018007. (IF: 1.165, 29.92%)
(12) Lim, H., Lee, J. Kim, T., Cho, K., and Cho, H. (2017). “Economic analysis of USN-based data acquisition systems in tall building construction, Sustainability, 9(8), 1360, 1 – 10. (IF: 2.592, 62.50%)
(13) Cho, K., Shin, Y., and Kim, T. (2017). “Effects of Half-precast concrete slab system on construction productivity,” Sustainability, 9(7), 1263, 1 – 15. (IF: 2.592, 62.50%)
(14) Cho, K., Chang, H., Jung, Y., and Yoon, Y. (2017). “Economic analysis of Data Center cooling strategies,” Sustainable Cities and Society, Elsevier, 31, 234 – 243. (IF: 4.624, 91.27%)
(15) Yoon, Y., Hastak, M., and Cho, K.,** (2017). “Preference Clustering-based Mediating Group Decision-Making (PCM-GDM) Method for Infrastructure Asset Management,” Expert Systems With Applications, Elsevier, 83, 206 – 214. (IF: 4.292, 92.26%)
(16) Yoon, Y., Hastak, M., and Cho, K.,** (2017). “Method for generating multiple MRR solutions for application in cost leveling models,” J. of Infrastructure Systems, ASCE, 23(3), 04016045-1 ~ 10. (IF: 1.538, 43.56%)
(17) Kim, J., Chang, H., Jung, Y., Cho, K., and Augenbroe, G., (2017, March). “Energy conservational effects of multi-stage outdoor air enabled cooling system in a data center,” Energy and Buildings, Elsevier., 138, 257-270. (IF: 4.495, 96.59%)
(18) Cho, K. and Yoon, Y. (2016). “Decision support model for determining cost-effective renovation time,” J. of Mgmt. in Eng., ASCE, 32(3), 04015051. (IF: 3.269, 84.47%)
(19) Shin, Y. and Cho, K.,** (2015). “BIM Application to select appropriate design alternative with consideration of LCA and LCCA,” Mathematical Problems in Engineering, HINDAWI, 2015, 1-14, Article ID 281640. (IF: 1.179, 45.15%)
(20) Wright, E., Cho, K.,** and Hastak, M. (2015). “Assessment of the US nuclear construction industry in terms of human capital and construction technologies,” J. of Mgmt. in Eng., ASCE, 31(4), 0414068. (IF: 3.269, 84.47%)
(21) Wright, E., Cho, K.,** and Hastak, M. (2014). “Assessment of critical construction engineering and management aspects of nuclear power projects,” J. of Mgmt. in Eng., ASCE, 30(4), 04014016. (IF: 3.269, 84.47%)
(22) Cho, K., Hong, Y., and Seo, J. (2014). “Assessment of the Economic Performance of Vacuum Insulation Panels for Housing Projects,” Energy and Buildings, Elsevier, 70, 45-51. (IF: 4.495, 96.59%)
(23) Cho, K (2014). “Evaluation on Technologies Ensuring Green Performance on Multi-family housing projects,” J. of Asian Architecture and Building Engineering, 17(1), 133-139.
(24) Cho, K., Hong, T., and Hyun, C. (2013). “Space Zoning concept-based Scheduling Model for Repetitive Construction Process,” Journal of Civil Engineering and Management, Taylor & Francis, 19(3), 409-421 (IF: 2.029, 57.42%)
(25) Cho, K. and Hastak, M. (2013). “Time and cost optimized decision support model for fast track projects,” J. of Const. Eng. & Mgmt., ASCE. 139(1), 90-101. (IF: 2.734, 76.98%)
(26) Han, Y., Cho, K., Hong, T., and Hyun, C. (2012). “Percentage of workable days in scheduling superstructure work for building construction projects in Korea,” KSCE J. of Civil Engineering, 16(4), 517-525 (IF: 1.428, 28.52%)
(27) Jin, R., Cho, K.**, Hyun, C., and Son, M. (2012). “MRA-based Revised CBR Model for Cost Prediction in the Early Stage of Construction Projects,” Exp. Sys. App., Elsevier, 39(5), 5214-5222 (IF: 4.292, 92.26%)
(28) Hong, T., Cho, K., Hyun, C., and Han, S. (2011). “Simulation based schedule control model for core wall construction of high-rise building,” J. of Const. Eng. & Mgmt., ASCE, 137(6), 393-402. (IF: 2.734, 76.98%)
(29) Moon, H., Cho, K., Hyun, C., and Hong, T. (2011). “Selection model of delivery methods for multi-family housing construction projects,” J. of Mgmt. in Eng., ASCE, 27(2), 106-115. (IF: 3.269, 84.47%)
(30) Cho, K., Hong, T., and Hyun, C. (2011). “Scheduling model for repetitive construction process of high-rise buildings,” Can. J. of Civ. Eng., 38(1), 36-48. (IF: 0.401)
(31) Cho, K., Hong, T., and Hyun, C. (2010). “Integrated schedule and cost model for repetitive construction process,” J. of Mgmt. in Eng., ASCE, 26(2), 78-88. (IF: 3.269, 84.47%)
(32) Cho, K., Hyun, C., Koo, K., and Hong, T. (2010). “Partnering process model for public sector fast-track design build projects,” J. of Mgmt. in Eng., ASCE, 26(1), 19-29. (IF: 3.269, 84.47%)
(33) Cho, K., Hong, T., and Hyun, C. (2009). “Effect of project characteristics on project performance in construction projects based on Structural Equation Model,” Expert System with Applications, Elsevier, 36(7), 10461-10470. (IF: 4.292, 92.26%)
(34) Hyun, C., Cho, K., Koo, K., Hong, T., and Moon, H. (2008). “Effect of delivery methods on design performance in multi-family housing projects,” J. of Const. Eng. & Mgmt., ASCE, 134(7), 468-482. (IF: 2.734, 76.98%)
(1) 이진웅, 김태훈, 조규만 (2018). “설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석,” 대한건축학회연합회논문집, 20(6), 97-104.
(2) 신동욱, 조규만, 이웅균, 김태훈 (2018). “건축물 해체공사비 변동 영향요인 분석,” 한국건축시공학회논문집,, 18(5), 499-506
(3) 조규만, 김태훈 (2018). “오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도,” 한국건설관리학회논문집, 19(5), 22-31
(4) 조규만, 김태훈 (2018). “리모델링 공사의 공기지연을 야기하는 리스크 요인,” 한국건축시공학회논문집, 18(4), 35-394
(5) 이진웅, 조규만, 김태훈 (2017). “고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출,” 한국건축시공학회논문집,17(5), 453-463
(6) 김정우, 조규만**, 김태훈 (2016). “리모델링 오피스 건축물의 감정평가에 관한 연구,” 대한건축학회논문집, 32(7), 57-63
(7) 조규만, 이지현, 김태훈 (2016). “경제성 측면의 수직증축 리모델링 규모 결정 모델,” J. of Advanced Engineering and Technology, 9(2), 111 - 119
(8) 김재성, 조규만**, 김태훈 (2016). “리모델링 공동주택의 가격결정요인에 관한 연구” 한국건설관리학회논문집, 17(3), 13-22
(9) 채충훈, 조규만**, 김재연 (2015). “이중외피 리모델링 공사의 경제적 타당성 연구” J. of Advanced Engineering and Technology, 8(3), 185 - 193
(10) 신영수, 조규만**, 김재연 (2015). “에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델” 한국건설관리학회논문집, 16(3), 91-100
(11) 신영수, 조규만**, 조창근 (2014). “시뮬레이션 기법을 활용한 고성능 프리캐스트 콘크리트 기둥의 작업프로세스 분석,” 한국건설관리학회논문집, 15(4), 49-57
(12) 김동필, 조규만** (2013). “어린이집 주요 바닥마감재의 경제성 및 LCCO2 분석에 관한 연구” 한국교육환경연구원학술지, 12(1), 25-34
(13) 신창준, 김윤겸, 조규만, 현창택, 홍태훈 (2011). “공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발,” 한국건설관리학회논문집, 12(1), 13-22.
(14) 이종엽, 현창택, 정세림, 조규만 (2010). “설계시공일괄입찰 설계심의평가 개선방향에 관한 연구” 대한건축학회논문집 구조계, 26(10), 115-122.
(15) 강동완, 심재규, 김윤겸, 조규만**, 현창택 (2010). “건설 시뮬레이션을 활용한 공동주택 골조공사의 생산성 분석에 관한 연구,” 대한건축학회논문집 구조계, 26(4), 123-131.
(16) 송창엽, 이환철, 박소현, 조규만**, 현창택. (2010). “알루미늄 폼을 이용한 골조공사의 생산성 분석에 관한 연구,” 대한건축학회논문집 구조계, 26(4), 113-122.
(17) 김윤식, 조재경, 김민지, 조규만**, 현창택 (2010). “시뮬레이션 기반의 타워크레인 설치 생산성 분석,” 한국건축시공학회논문집, 10(2), 33-40.
(18) 정세림, 조규만**, 현창택. (2010). “철골조 데크플레이트 공사의 생산성 분석에 관한 연구,” 한국건축시공학회논문집, 10(1), 74-79.
(19) 박인우, 조규만, 현창택, 홍태훈 (2009). “공리적 설계를 활용한 고객만족형 설계VE 프로세스 개발” 한국건설관리학회논문집, 10(3), 111-121.
(20) 박정호, 전훈배, 조규만, 홍태훈, 구교진, 현창택 (2008). “겸업제한 폐지에 따른 철근콘크리트 전문건설업체의 발전요인,” 한국건설관리학회논문집, 9(1), 118-125.
(21) 현창택, 홍태훈, 구교진, 연희정, 문현석, 조규만 (2007). “공공아파트 건설공사의 공간별 공사비분류체계 개발,” 한국건설관리학회논문집, 8(6), 178-186.
(22) 우유미, 송종관, 조규만, 이현종, 구교진, 홍태훈, 현창택 (2007). “설계단계 공사비관리 효율성의 주요영향요인 분석” 한국건설관리학회논문집, 8(4), 176-184.
(23) 조규만, 김희욱, 현창택, 구교진 (2007) “발주방식에 따른 성능수준 평가에 관한 연구,” 한국건설관리학회논문집, 8(2), 75-83.
(24) 김상갑, 조규만, 김청융, 홍태훈, 현창택, 구교진 (2007). “공동주택 지하구조물의 방수공법별 생애주기비용 분석에 관한 연구,” 대한건축학회논문집 구조계, 23(1), 95-103.
(25) 현창택, 조규만 (2007). “설계시공일괄입찰사업에서 패스트트랙 성공요인에 관한 연구” 대한건축학회논문집 구조계, 23(1), 129-136.